Search results

Jump to navigation Jump to search

Page title matches

  • <center><span STYLE="font: 40pt arial;">'''Division 3 Supplemental Information'''</span></center> [[Category:Division 3]]
    288 bytes (30 words) - 10:14, 13 September 2023

Page text matches

  • <center><span STYLE="font: 40pt arial;">'''Division 3 Supplemental Information'''</span></center> [[Category:Division 3]]
    288 bytes (30 words) - 10:14, 13 September 2023
  • ...d access reports can be found in the [//{{SERVERNAME}}/images_construction/3/32/Final_Project_Review_Report_User_Guide_9-2020.pdf Final Project Review R [[Category:Division 1]]
    624 bytes (87 words) - 08:57, 5 January 2022
  • <center>3:00 pm, Friday, 05/22/20 <center>3:00 pm, Thursday, 07/02/20
    5 KB (579 words) - 12:33, 14 March 2022
  • The Construction Field Services (CFS) Division has revised the [https://www.michigan.gov/mdot/-/media/Project/Websites/MDO *I.A.7 (pg. 3)
    2 KB (239 words) - 14:49, 21 September 2023
  • The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Production Manual. A brief descripti * Aggregate Requirements-Subsection 3: Added new note “AWI will not be assigned to previously approved mix des
    4 KB (560 words) - 15:14, 19 June 2017
  • [[Category:Division 3]]
    636 bytes (71 words) - 16:59, 12 January 2022
  • ...evation at least 3 feet (1 m) below the final pavement surface or at least 3 feet (1 m) below the final ground elevation. ...ld extend from the inner wall of the drainage structure at least 1 foot (0.3 m) into the pipe.
    2 KB (304 words) - 10:05, 13 September 2023
  • [[Category:Division 3]]
    1 KB (153 words) - 16:58, 12 January 2022
  • | colspan="3" | | colspan="3" |
    4 KB (456 words) - 09:22, 11 July 2023
  • See [[501 - HMA Mixtures|Division 5, HMA]] and [[601 - PCC Pavement Mixtures|Division 6, Concrete]] for general materials requirements. Review the plans and [ht ...m) straightedge. Variation of more than 1/4 inch in 10 feet (6 mm in 3 m) must be remedied.
    4 KB (545 words) - 12:41, 19 January 2022
  • [[Category:Division 3]]
    2 KB (223 words) - 16:43, 12 January 2022
  • '''Below is a copy of the 2024 RBPI project list as of 1/3/24:''' ..._Risk_Based_Project_Involvement_Guidance_September_2021_FINAL.pdf Michigan Division Risk Based Project Involvement Guidance Document].
    2 KB (296 words) - 15:37, 3 January 2024
  • <div id="701.03.A.3"></div> ::'''3.''' Concrete mixing requirements of subsection [[Section 601 - Portland C
    12 KB (1,593 words) - 13:11, 26 July 2022
  • ...orting the string line may have to be placed as close together as 10 foot (3 m) to ensure a smooth curve. The string line should be visually checked to ...of the Standard Specifications for Construction (also see '''''Figure 802-3'''''). When a curb is placed adjacent to a concrete pavement or base cours
    12 KB (1,916 words) - 11:49, 19 January 2022
  • ...e plans to be removed, will be entirely removed or broken down to at least 3 feet (1 m) below final ground elevation and/or final pavement surface. ...ructures not interfering with new construction will be removed to at least 3 feet (1 m) below the pavement surface within the limits of the roadbed, and
    10 KB (1,390 words) - 10:07, 13 September 2023
  • ...or broken concrete - length or width must be 16 inches (400 mm). Ratio of 3 to 1 for maximum to minimum dimension. Heavy precast must be 16 inches (40 Dimensions same as for plain riprap. Spaces filled with Type R-3 mortar.
    4 KB (644 words) - 17:17, 19 September 2023
  • b. Micro-Surfacing Preparation – Industry recommends a delay period of 3 days between overband pretreatment and placement of micro-surfacing. [[Category:Division 5]]
    2 KB (335 words) - 18:15, 15 December 2021
  • ...ed of reinforced or nonreinforced concrete. [[601 - PCC Pavement Mixtures|Division 6]] of this manual should be referenced for concrete construction. Thickne | colspan="3" |
    5 KB (706 words) - 11:49, 19 January 2022
  • [[Category:Division 3]]
    3 KB (427 words) - 14:12, 16 February 2022
  • <center>3</center> [[Category: Division 8]]
    3 KB (428 words) - 12:44, 19 January 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)