Search results

Jump to navigation Jump to search

Page title matches

  • <center><span STYLE="font: 40pt arial;">'''Division 4 Supplemental Information'''</span></center> ::[[File:Mandrel Testing - 9 Point - 4.jpg|border|left|500px]]
    5 KB (809 words) - 14:29, 23 September 2021

Page text matches

  • The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Production Manual. A brief descripti * Marshall Mixtures – Subsection 4: Comment added “2C Designs require 7000g of mixture at optimum”; plus
    4 KB (560 words) - 15:14, 19 June 2017
  • [[Category:Division 4]]
    627 bytes (71 words) - 17:48, 12 January 2022
  • ...anties will be assigned to MDOT. Refer to [[819 - Electrical and Lighting|Division 8]] of this manual for further information on electrical requirements on pu [[Category:Division 4]]
    1 KB (201 words) - 17:47, 12 January 2022
  • ...nician certification or similarly titled certifications expire after four (4) years unless stated otherwise. Certified Engineers must have and maintain [[Category:Division 1]]
    2 KB (218 words) - 09:59, 3 April 2024
  • <center><span STYLE="font: 40pt arial;">'''Division 4 Supplemental Information'''</span></center> ::[[File:Mandrel Testing - 9 Point - 4.jpg|border|left|500px]]
    5 KB (809 words) - 14:29, 23 September 2021
  • ...course for each lane, over the centerline rumbles essentially filling them 4 times. [[Category:Division 5]]
    1 KB (174 words) - 18:17, 15 December 2021
  • Sidewalks are usually 4 inches thick, except all driveways where the thickness will be increased as ...mples of hand tools commonly used. These joints must be cut to at least 1/4 of the thickness of the concrete to control cracking. A straightedge shoul
    3 KB (465 words) - 11:50, 19 January 2022
  • ::[[File:Mandrel Testing - 9 Point - 4.jpg|border|left|500px]] [[Category:Division 4]]
    5 KB (826 words) - 16:06, 6 May 2021
  • When corduroy is found within 4 feet (1.2 m) below plan grade, its removal will be by the foot (meter) meas [[Category:Division 2]]
    2 KB (326 words) - 10:07, 13 September 2023
  • See [[501 - HMA Mixtures|Division 5, HMA]] and [[601 - PCC Pavement Mixtures|Division 6, Concrete]] for general materials requirements. Review the plans and [ht ...l be checked using a 10 foot (3 m) straightedge. Variation of more than 1/4 inch in 10 feet (6 mm in 3 m) must be remedied.
    4 KB (545 words) - 12:41, 19 January 2022
  • *Bridge Barrier Railing, Type 4 *Bridge Railing, 4 Tube
    7 KB (1,050 words) - 11:46, 19 January 2022
  • <gallery widths=200 heights=50 perrow=4 caption="MENU"> <center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center>
    28 KB (3,726 words) - 16:02, 8 March 2023
  • <center>4</center> [[Category: Division 8]]
    3 KB (428 words) - 12:44, 19 January 2022
  • ...ed of reinforced or nonreinforced concrete. [[601 - PCC Pavement Mixtures|Division 6]] of this manual should be referenced for concrete construction. Thickne ...e paid for as separate pay items as described in [[401 - Culverts|Division 4,]] Drainage Features.
    5 KB (706 words) - 11:49, 19 January 2022
  • <div id="701.03.A.4"></div> ::'''4.''' Concrete temperature requirement of subsection [[Section 601 - Portla
    12 KB (1,593 words) - 13:11, 26 July 2022
  • ...n earth surface are acceptable. Horizontal tolerances should not exceed 3/4 inch (20 mm) for a 100 foot (30 m) segment when measured using a string lin ...l be checked using a 10 foot (3 m) straightedge. Variation of more than 1/4 inch in 10 feet (6 mm in 3 m) must be remedied.
    7 KB (988 words) - 10:53, 8 April 2024
  • | colspan="4" | | colspan="4" |
    10 KB (1,390 words) - 10:07, 13 September 2023
  • ...gh the Construction Operations Engineer in the Construction Field Services Division. The VEDT membership will consist of the following individuals (or their de ::e. Administrator of the Development Services Division (if a local agency project)
    9 KB (1,297 words) - 14:57, 11 October 2022
  • * Depth - Taken after final trimming to the nearest 1/4 inch (6 mm), at a minimum of 400 linear feet (120 m) of traffic lane width ...n thickness will be considered as plan thickness. Depths greater than 1-3/4 inches(45 mm) deficiency will not be used for averaging. To be within spec
    6 KB (873 words) - 14:24, 16 February 2022
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    67 KB (8,623 words) - 17:18, 11 April 2024

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)