Search results

Jump to navigation Jump to search

Page title matches

  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...dinated with the Standard Specifications for Construction, Divisions 6 and 7 of the Construction Manual, Special Provision 12SP604B QUALITY CONTROL AND
    33 KB (4,932 words) - 16:38, 12 May 2021

Page text matches

  • ...July 2022.jpg|thumb|center|700px|link=//{{SERVERNAME}}/images_construction/7/7c/DRB_Flowchart_July_2022.pdf|DRB Process Flowchart]] [[Category:Division 1]]
    2 KB (249 words) - 15:56, 11 July 2022
  • ...e project, the local agency is required to notify the DR in writing within 7 days of the change. Information regarding certification/license requiremen [[Category:Division 1]]
    2 KB (320 words) - 11:18, 14 September 2023
  • ...all in place measurement items with terrain changes less than or equal to 7% must be calculated horizontally and can be done using the data collector o ...items specifying measured in place that have terrain changes greater than 7% must be calculated on the three-dimensional slopes using CAD software. Th
    7 KB (1,088 words) - 12:47, 29 January 2024
  • ...gh the Construction Operations Engineer in the Construction Field Services Division. The VEDT membership will consist of the following individuals (or their de ::e. Administrator of the Development Services Division (if a local agency project)
    9 KB (1,297 words) - 14:57, 11 October 2022
  • * [//{{SERVERNAME}}/images_construction/7/7c/MERS_2020_User_Guide.pdf MERS 2020 User Guide] [[Category:Division 1]]
    3 KB (367 words) - 11:03, 25 April 2023
  • 7.0 0 – 7
    12 KB (1,593 words) - 13:11, 26 July 2022
  • c. Chip Seal Preparation– Industry recommends a delay period of 7-14 days between overband pretreatment and placement of chip seal. ...document which can be found online at http://www.michigan.gov/mdot/0,4616,7-151-9621_15757---,00.html
    2 KB (335 words) - 18:15, 15 December 2021
  • When practical, a wet cure should be utilized for at least 7 days to prevent drying, shrinkage and cracking of the grout. [[Category:Division 7]]
    5 KB (749 words) - 11:43, 19 January 2022
  • [[Category:Division 7]]
    3 KB (442 words) - 17:11, 6 May 2021
  • <center>7</center> [[Category: Division 8]]
    3 KB (428 words) - 12:44, 19 January 2022
  • ...ed of reinforced or nonreinforced concrete. [[601 - PCC Pavement Mixtures|Division 6]] of this manual should be referenced for concrete construction. Thickne <center>7 inches (175 mm)</center>
    5 KB (706 words) - 11:49, 19 January 2022
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    67 KB (8,623 words) - 17:18, 11 April 2024
  • <center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    28 KB (3,726 words) - 16:02, 8 March 2023
  • ...Form 0501.jpg|thumb|center|750px|link=//{{SERVERNAME}}/images_construction/7/7e/Sample_HMA_MSL_-_Form_0501.pdf|Sample: HMA MSL]] [[Category:Division 1]]
    4 KB (611 words) - 16:09, 25 May 2022
  • ...g agency) seven (7) working days prior to start of construction and seven (7) working days prior to signal activation.” Appropriate contact informati ...- sample.jpg|thumb|center|750px|link=//{{SERVERNAME}}/images_construction/7/73/CL_09032-01-002_-_blank.pdf]]
    9 KB (1,266 words) - 15:59, 2 April 2024
  • ...s. Each coat shall not be less than 1 gallon per 300 square feet (1 L per 7 m<sup>2</sup>). ...membrane curing compound at rate of 1 gallon per 300 square feet (1 L per 7 m2) for each of two coats. If complete coverage is being obtained without
    6 KB (929 words) - 11:50, 19 January 2022
  • Figures 1 through 7 illustrate cross sections of the railing standard plans, though the details ...ecbook/files/2012/707%20Str%20Steel%20Construction.pdf subsection 707.03.D.7.c] of the standard specifications.
    7 KB (1,050 words) - 11:46, 19 January 2022
  • [[Category: Division 7]]
    6 KB (791 words) - 11:43, 19 January 2022
  • ...ject to Bid through MDOT] located at [https://www.michigan.gov/mdot/0,4616,7-151-9625_25885---,00.html www.michigan.gov/mdotlap]. :7. Public and Private Utilities^^
    7 KB (1,055 words) - 11:29, 14 July 2020
  • <center>7</center> [[Category: Division 8]]
    6 KB (797 words) - 17:08, 27 March 2023

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)