Search results

Jump to navigation Jump to search
  • ...t file (CSV) or XML file of the pay item from the data collector to folder 208 in ProjectWise. File naming conventions will follow the [https://mdotwiki. ...all points, linework and boundary used to define the calculation to folder 208 in ProjectWise. File naming conventions will follow the standard naming co
    7 KB (1,088 words) - 12:47, 29 January 2024
  • ...ations-Construction/2020-Standard-Specifications-Construction.pdf#page=168 208], Soil Erosion and Sedimentation Control, of the Standard Specifications fo Section [https://www.michigan.gov/mdot/-/media/Project/Websites/MDOT/Business/Const
    8 KB (1,133 words) - 12:01, 28 March 2023
  • !Updated!! Division !! Section !! Summary !! What Changed ..._Guardrail, Guardrail Terminals, and MiscellaneousPosts]</center>||Updated Section 807 to reflect new guidance on lapping guardrail for temporary traffic shif
    67 KB (8,623 words) - 17:18, 11 April 2024
  • <center><span STYLE="font: 60pt arial;">'''208'''</span></center> ...bottom of the application to invoice MDOT. For training requirements see Section 1.2 in the [https://www.michigan.gov/documents/2006_SESC_Manual_165226_7.pd
    19 KB (2,830 words) - 17:02, 15 February 2024
  • ...d Construction Manual Updates (CMU). The link under “Current Content Area/Section” shows the existing construction manual language and the link under “Pr !Date !! Current Content Area/Section !! Proposed Update !! Comments Due !! Status
    28 KB (3,726 words) - 16:02, 8 March 2023
  • ...ttp://mdotcf.state.mi.us/public/specbook/files/2012/208%20SESC.pdf Section 208] of the Standard Specifications for Construction. As noted in Section [http://mdotcf.state.mi.us/public/specbook/files/2012/917%20Landscaping%20M
    15 KB (2,398 words) - 13:12, 26 July 2022
  • ...xceed the end date of the construction project. See [[210 - Environmental|Section 210, Environmental]], of this manual for Contractor yard requirements relat Section [http://mdotcf.state.mi.us/public/specbook/files/2012/205%20Roadway%20Earth
    78 KB (12,236 words) - 14:45, 21 September 2023
  • ...he pavement surface, in one or more passes, to the required grade or cross section. ..., dried-out surfaces must be re-compacted and restored to the proper cross section. Saturated areas must be allowed to dry prior to placing mixture. The agg
    139 KB (21,114 words) - 15:08, 30 January 2024