<?xml version="1.0"?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
	<id>https://mdotwiki.state.mi.us/construction/index.php?action=history&amp;feed=atom&amp;title=108.01_Subcontracting_of_Contract_Work</id>
	<title>108.01 Subcontracting of Contract Work - Revision history</title>
	<link rel="self" type="application/atom+xml" href="https://mdotwiki.state.mi.us/construction/index.php?action=history&amp;feed=atom&amp;title=108.01_Subcontracting_of_Contract_Work"/>
	<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;action=history"/>
	<updated>2026-10-17T07:49:11Z</updated>
	<subtitle>Revision history for this page on the wiki</subtitle>
	<generator>MediaWiki 1.35.2</generator>
	<entry>
		<id>https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6509&amp;oldid=prev</id>
		<title>SchaeferS: Removed 2012 Spec Book tagline link</title>
		<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6509&amp;oldid=prev"/>
		<updated>2022-01-12T21:38:00Z</updated>

		<summary type="html">&lt;p&gt;Removed 2012 Spec Book tagline link&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left diff-editfont-monospace&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 21:38, 12 January 2022&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l1&quot; &gt;Line 1:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 1:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&amp;lt;center&amp;gt;[http://mdotcf.state.mi.us/public/specbook/files/2012/108%20Prosecution%20and%20Progress.pdf 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 108]&amp;lt;/center&amp;gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;lt;div style=&amp;quot;text-align: center;&amp;quot;&amp;gt;[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/108.01_Subcontracting_of_Contract_Work Email this Page]&amp;lt;/div&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&amp;lt;div style=&amp;quot;text-align: center;&amp;quot;&amp;gt;[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/108.01_Subcontracting_of_Contract_Work Email this Page]&amp;lt;/div&amp;gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>SchaeferS</name></author>
	</entry>
	<entry>
		<id>https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6419&amp;oldid=prev</id>
		<title>Clarkj25: /* SUBCONTRACTING OF CONTRACT WORK */</title>
		<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6419&amp;oldid=prev"/>
		<updated>2021-10-26T15:00:34Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;SUBCONTRACTING OF CONTRACT WORK&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left diff-editfont-monospace&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 15:00, 26 October 2021&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l4&quot; &gt;Line 4:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 4:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==[[#SUBCONTRACTING OF CONTRACT WORK|SUBCONTRACTING OF CONTRACT WORK]]==&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==[[#SUBCONTRACTING OF CONTRACT WORK|SUBCONTRACTING OF CONTRACT WORK]]==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracting is governed by the [https://www.ecfr.gov/current/title-23/chapter-I/subchapter-G/part-635/subpart-A/section-635.116 &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Code of Federal Regulations (&lt;/del&gt;CFR&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;) Title 23, Section &lt;/del&gt;635.116].  The CFR requires the department to have a subcontracting process which must be followed when subcontracting work is performed.  The subcontracting process is required on all state and federal funded construction projects.  The Michigan Department of Transportation (MDOT) utilizes the following process for subcontracting.  &lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracting is governed by the [https://www.ecfr.gov/current/title-23/chapter-I/subchapter-G/part-635/subpart-A/section-635.116 &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;23 &lt;/ins&gt;CFR 635.116].  The CFR requires the department to have a subcontracting process which must be followed when subcontracting work is performed.  The subcontracting process is required on all state and federal funded construction projects.  The Michigan Department of Transportation (MDOT) utilizes the following process for subcontracting.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{{top}}&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{{top}}&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Clarkj25</name></author>
	</entry>
	<entry>
		<id>https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6411&amp;oldid=prev</id>
		<title>SchaeferS: /* Construction Subcontract Process */ Removed text re: engineer's responsibility to check subcontractors are prequalified prior to start of work.</title>
		<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6411&amp;oldid=prev"/>
		<updated>2021-10-20T20:09:29Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;Construction Subcontract Process: &lt;/span&gt; Removed text re: engineer&amp;#039;s responsibility to check subcontractors are prequalified prior to start of work.&lt;/span&gt;&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left diff-editfont-monospace&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 20:09, 20 October 2021&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l23&quot; &gt;Line 23:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 23:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Prior to the start of any subcontract work for the respective subcontractor, the contractor must submit a copy of the appropriate signed Form 1302, Subcontract, cover page and pay items page to the engineer.  On aeronautics projects, the contractor must submit a copy of the signed Form 1302, Subcontract, cover page and pay items page to the Office of Aeronautics, Project Management Section.  Contractors must retain the original signed subcontract, including all required subcontract attachments, in their office or project files (either in paper or electronic format).  Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=2653.pdf (Form 2653)] to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.  &lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Prior to the start of any subcontract work for the respective subcontractor, the contractor must submit a copy of the appropriate signed Form 1302, Subcontract, cover page and pay items page to the engineer.  On aeronautics projects, the contractor must submit a copy of the signed Form 1302, Subcontract, cover page and pay items page to the Office of Aeronautics, Project Management Section.  Contractors must retain the original signed subcontract, including all required subcontract attachments, in their office or project files (either in paper or electronic format).  Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=2653.pdf (Form 2653)] to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is the engineer’s responsibility to ensure they have received the cover page and pay item page(s) of the subcontract form prior to the start of work associated with the subcontract.  &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;It is also the engineer’s responsibility to check that subcontractors are prequalified in the applicable category corresponding their proposed work items prior to the start of work.  After it’s been determined that subcontractor has been prequalified, enter &lt;/del&gt;the date received in the space provided and labeled as “Date Received by Engineer” located on page one of either [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302]. Change the state in ProjectWise of the cover page of [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302] and send to [mailto:ConstructionSubcontracts@Michigan.gov ConstructionSubcontracts@Michigan.gov] for data entry.  &lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;It is the engineer’s responsibility to ensure they have received the cover page and pay item page(s) of the subcontract form prior to the start of work associated with the subcontract.  &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Enter &lt;/ins&gt;the date received in the space provided and labeled as “Date Received by Engineer” located on page one of either [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302]. Change the state in ProjectWise of the cover page of [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302] and send to [mailto:ConstructionSubcontracts@Michigan.gov ConstructionSubcontracts@Michigan.gov] for data entry.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After each MDOT letting CSD will randomly select 12% of the let projects for an interim and/or post construction review of subcontracts.  The randomly selected projects will be provided to the Construction Field Services (CFS) subcontract compliance analyst to schedule and perform the interim and/or post construction reviews. The review is performed to ensure the subcontracting processes are followed and documented. The following criteria are reviewed:  &lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;After each MDOT letting CSD will randomly select 12% of the let projects for an interim and/or post construction review of subcontracts.  The randomly selected projects will be provided to the Construction Field Services (CFS) subcontract compliance analyst to schedule and perform the interim and/or post construction reviews. The review is performed to ensure the subcontracting processes are followed and documented. The following criteria are reviewed:  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>SchaeferS</name></author>
	</entry>
	<entry>
		<id>https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6385&amp;oldid=prev</id>
		<title>SchaeferS: /* SUBCONTRACTING OF CONTRACT WORK */ added Code of Federal Regulations Title 23, Section 635.116 link</title>
		<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6385&amp;oldid=prev"/>
		<updated>2021-09-28T14:27:04Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;SUBCONTRACTING OF CONTRACT WORK: &lt;/span&gt; added Code of Federal Regulations Title 23, Section 635.116 link&lt;/span&gt;&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left diff-editfont-monospace&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 14:27, 28 September 2021&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l4&quot; &gt;Line 4:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 4:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==[[#SUBCONTRACTING OF CONTRACT WORK|SUBCONTRACTING OF CONTRACT WORK]]==&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==[[#SUBCONTRACTING OF CONTRACT WORK|SUBCONTRACTING OF CONTRACT WORK]]==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracting is governed by the Code of Federal Regulations (CFR) Title 23, Section 635.116.  The CFR requires the department to have a subcontracting process which must be followed when subcontracting work is performed.  The subcontracting process is required on all state and federal funded construction projects.  The Michigan Department of Transportation (MDOT) utilizes the following process for subcontracting.  &lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracting is governed by the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;[https://www.ecfr.gov/current/title-23/chapter-I/subchapter-G/part-635/subpart-A/section-635.116 &lt;/ins&gt;Code of Federal Regulations (CFR) Title 23, Section 635.116&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;]&lt;/ins&gt;.  The CFR requires the department to have a subcontracting process which must be followed when subcontracting work is performed.  The subcontracting process is required on all state and federal funded construction projects.  The Michigan Department of Transportation (MDOT) utilizes the following process for subcontracting.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{{top}}&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{{top}}&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>SchaeferS</name></author>
	</entry>
	<entry>
		<id>https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6384&amp;oldid=prev</id>
		<title>SchaeferS: Fully updated/replaced information for 108.01, still need correct link to Code of Federal Regulations, Title 23, Section 613.116.</title>
		<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6384&amp;oldid=prev"/>
		<updated>2021-09-27T19:26:31Z</updated>

		<summary type="html">&lt;p&gt;Fully updated/replaced information for 108.01, still need correct link to Code of Federal Regulations, Title 23, Section 613.116.&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left diff-editfont-monospace&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 19:26, 27 September 2021&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l4&quot; &gt;Line 4:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 4:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==[[#SUBCONTRACTING OF CONTRACT WORK|SUBCONTRACTING OF CONTRACT WORK]]==&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;==[[#SUBCONTRACTING OF CONTRACT WORK|SUBCONTRACTING OF CONTRACT WORK]]==&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;The Michigan Department &lt;/del&gt;of &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Transportation &lt;/del&gt;(&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;MDOT&lt;/del&gt;) &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;has updated &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;construction project &lt;/del&gt;subcontracting process &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;for current specifications and references&lt;/del&gt;.  The subcontracting process is &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;effective &lt;/del&gt;on all state and &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;federally &lt;/del&gt;funded construction projects.  &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Contractor requirements for subcontracting are described in [http://mdotcf.state.mi.us/public/specbook/files/2012/108%20Prosecution%20and%20Progress.pdf subsection 108.01] of the 2012 Standard Specifications for Construction. &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Subcontracting is governed by the Code &lt;/ins&gt;of &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Federal Regulations &lt;/ins&gt;(&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;CFR&lt;/ins&gt;) &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Title 23, Section 635.116.  The CFR requires &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;department to have a &lt;/ins&gt;subcontracting process &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;which must be followed when subcontracting work is performed&lt;/ins&gt;.  The subcontracting process is &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;required &lt;/ins&gt;on all state and &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;federal &lt;/ins&gt;funded construction projects.  The Michigan Department of Transportation (MDOT) &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;utilizes &lt;/ins&gt;the following process for subcontracting.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The Michigan Department of Transportation (MDOT) &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;follows &lt;/del&gt;the following process for subcontracting &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;on state funded and Federal Aid construction projects&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{{top}}&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{{top}}&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;===[[#Federal Highway Administration (FHWA) Requirements|Federal Highway Administration (FHWA) Requirements]]===&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;Subcontracting is governed by the [http://www.ecfr.gov/cgi-bin/text-idx?c=ecfr&amp;amp;sid=4326b3462801c075d9d260366f1f811e&amp;amp;rgn=div5&amp;amp;view=text&amp;amp;node=23:1.0.1.7.23&amp;amp;idno=23#se23.1.635_1116 Code of Federal Regulations (CFR) Title 23, Section 635.116].  The CFR requires the department to have a subcontracting process which must be followed when subcontracting work is performed.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del style=&quot;font-weight: bold; text-decoration: none;&quot;&gt;{{top}}&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===[[#Construction Subcontract Process|Construction Subcontract Process]]===&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;===[[#Construction Subcontract Process|Construction Subcontract Process]]===&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;MDOT requirements for contractor subcontracting are described in [http://mdotcf.state.mi.us/public/specbook/files/2012/108%20Prosecution%20and%20Progress.pdf subsection 108.01] of the &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;The contractor must use its own organization to perform work amounting to at least &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;35 &lt;/ins&gt;percent of the original contract amount.  &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Section 108.01 &lt;/ins&gt;of the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Standard Specifications &lt;/ins&gt;refers to the department’s procedures for subcontracting, which are defined in this document.  All contractors must adhere to the following process:  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;2012 Standard Specifications for Construction.  &lt;/del&gt;The contractor must use its own organization to perform work amounting to at least &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;40 &lt;/del&gt;percent of the original contract amount.  &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;This section &lt;/del&gt;of the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;specifications also &lt;/del&gt;refers to the department’s procedures for subcontracting, which are defined in this document.  All contractors must adhere to the following process:&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:1. Contractors must submit a signed version of [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed], Subcontract, pages 1 and 3 to the TSC construction/project engineer or the respective local agency project engineer if applicable.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:2. Contractors on aeronautics projects must submit [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed], Subcontract, pages 1 and 3 to the Office of Aeronautics, Project Management Section.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:3. [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed], pages 1 and 3, must be submitted to the engineer (or Aeronautics as applicable) prior to the start of any subcontract work for the respective subcontractor.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:4. Contractors are responsible for following all the subcontract requirements, including providing the required subcontract attachments outlined in the Construction Contract Package document available at:&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;::http://www.michigan.gov/documents/mdot/MDOT_Awards_Contract_Package_307478_7.pdf?20140521094354&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt; &lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:5. [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed] is also available on the MDOT forms page at:&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;::http://mdotjboss.state.mi.us/webforms/WebFormsHome.htm&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:6. Contractors must retain the original signed subcontract&lt;/del&gt;, &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;including all &lt;/del&gt;required subcontract &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;attachments, in their office or project files (either in paper or electronic format)&lt;/del&gt;. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt; &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;On all projects with federal participation&lt;/ins&gt;, &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;it is &lt;/ins&gt;required &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;to physically incorporate the Form FHWA-1273 into subcontracts prior to a signature.  MDOT has created two &lt;/ins&gt;subcontract &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302 forms to meet this requirement on federal and state funded projects&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;7&lt;/del&gt;. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets ([&lt;/del&gt;http://mdotjboss.state.mi.us/webforms/&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;GetDocument&lt;/del&gt;.htm&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;?fileName=2653.pdf Form 2653&lt;/del&gt;]&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;The following subcontract forms are available on the MDOT forms page at: [https&lt;/ins&gt;:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;//mdotjboss.state.mi&lt;/ins&gt;.&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;us/webforms/WebFormsHome.htm &lt;/ins&gt;http://mdotjboss.state.mi.us/webforms/&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;WebFormsHome&lt;/ins&gt;.htm]&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Subcontracts are not approved by MDOT.  It is the engineer’s responsibility to ensure they have received pages 1 and 3 of the subcontract form prior to the start of work associated with the subcontract.  The engineer must enter the date received in the space provided and labeled as “Date Received by Engineer” located on page 1 of &lt;/del&gt;[https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Fed&lt;/del&gt;]&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;.  The engineer must forward a copy of page 1 of [https&lt;/del&gt;:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;//mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed] to CSD for data entry.  For MDOT &lt;/del&gt;projects&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;, this page must be electronically submitted to [mailto:MDOT-ConstructionSubcontracts@michigan.gov MDOT-ConstructionSubcontracts@michigan.gov] .  Local agency engineers may use &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;email address or fax a copy &lt;/del&gt;of &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;page 1 to CSD at 517-241&lt;/del&gt;-&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;4193&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:&lt;/ins&gt;[https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;FED&lt;/ins&gt;]: &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Used on federal funded &lt;/ins&gt;projects &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;and meets &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;federal requirement &lt;/ins&gt;of &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;incorporating the Form FHWA&lt;/ins&gt;-&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1273&lt;/ins&gt;.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Active projects are randomly selected by CSD for an interim and&lt;/del&gt;/&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;or post construction review of subcontracts by the Construction Field Services (CFS) subcontract compliance analyst&lt;/del&gt;. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt; The review is performed to ensure &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;subcontracting processes are followed and documented&lt;/del&gt;. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt; The following criteria are reviewed:&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:[https://mdotjboss.state.mi.us/webforms&lt;/ins&gt;/&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;GetDocument.htm?fileName=1302-State&lt;/ins&gt;.&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;pdf Form 1302-State]: Meets &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;requirement for state funded projects only&lt;/ins&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:1. Subcontractor is MDOT prequalified in &lt;/del&gt;the work &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;categories identified in &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;subcontract.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Prior to &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;start of any subcontract &lt;/ins&gt;work &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;for the respective subcontractor, the contractor must submit a copy of &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;appropriate signed Form 1302, Subcontract, cover page and pay items page to &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;engineer&lt;/ins&gt;. &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt; On aeronautics projects, &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;contractor must submit a copy &lt;/ins&gt;of &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;the signed Form 1302, Subcontract, cover page and pay items page &lt;/ins&gt;to the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Office &lt;/ins&gt;of &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Aeronautics, Project Management Section.  Contractors must retain &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;original signed subcontract, including all required subcontract attachments, in their office or project files (either in paper &lt;/ins&gt;or &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;electronic format)&lt;/ins&gt;. &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt; Subcontracting requirements do not affect &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;required submittal of Disadvantaged Business Enterprises &lt;/ins&gt;(&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;DBE) Participation Sheets &lt;/ins&gt;[https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;2653&lt;/ins&gt;.pdf &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;(&lt;/ins&gt;Form &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;2653)&lt;/ins&gt;] &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;to &lt;/ins&gt;MDOT, &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Contract Services Division (CSD)&lt;/ins&gt;, &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;for review and approval &lt;/ins&gt;as &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;part of &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;award process&lt;/ins&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:2. Compliance with &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;60 percent maximum subcontracting limit&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:3. Compliance with &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;50 percent maximum sub-subcontract limit.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:4. DBE Participation sheets have been provided.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:5. Submittal &lt;/del&gt;of &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;subcontracts prior &lt;/del&gt;to the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;commencement &lt;/del&gt;of the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;subcontracted work.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:6. Designated and/&lt;/del&gt;or &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;specialty subcontractors are utilized if applicable&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:7. Required attachment documentation is incorporated and/or included with &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;subcontracts &lt;/del&gt;(&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;required attachments are outlined in &lt;/del&gt;[https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302-FED&lt;/del&gt;.pdf Form &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302-Fed&lt;/del&gt;]&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;).&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:8. Compliance of subcontract language with &lt;/del&gt;MDOT &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;and federal specifications&lt;/del&gt;, &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;rules&lt;/del&gt;, &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;policies, processes, procedures, etc.&lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;:9. Other documentation &lt;/del&gt;as &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;needed to assure compliance with &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;above criteria (this may include: certified payroll, purchase agreements, [http://mdotjboss&lt;/del&gt;.&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;state.mi.us/webforms/GetDocument.htm?fileName=1386.pdf form 1386,] [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=2124A.pdf form 2124A], etc…)  &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;The prime contractor must certify compliance &lt;/del&gt;with &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;subcontracting requirements &lt;/del&gt;by &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;completing and signing &lt;/del&gt;[&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;http&lt;/del&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1386&lt;/del&gt;.pdf Form &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1386&lt;/del&gt;]&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;, Post Certification &lt;/del&gt;of &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Subcontract Compliance, prior to &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;issuance &lt;/del&gt;of &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;the final project pay estimate&lt;/del&gt;. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt; &lt;/del&gt;&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;It is the engineer’s responsibility to ensure they have received the cover page and pay item page(s) of the subcontract form prior to the start of work associated &lt;/ins&gt;with &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;the subcontract.  It is also the engineer’s responsibility to check that subcontractors are prequalified in the applicable category corresponding their proposed work items prior to the start of work.  After it’s been determined that subcontractor has been prequalified, enter the date received in the space provided and labeled as “Date Received &lt;/ins&gt;by &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Engineer” located on page one of either &lt;/ins&gt;[&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;https&lt;/ins&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-FED&lt;/ins&gt;.pdf Form &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302&lt;/ins&gt;]&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;. Change the state in ProjectWise &lt;/ins&gt;of the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;cover page &lt;/ins&gt;of &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;[https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302] and send to [mailto:ConstructionSubcontracts@Michigan.gov ConstructionSubcontracts@Michigan.gov] for data entry&lt;/ins&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Contractors must provide access &lt;/del&gt;to &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;all documentation necessary for &lt;/del&gt;subcontract compliance reviews. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt; Contractors must allow MDOT access &lt;/del&gt;to &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;their books, records, accounts, files, sources of information, &lt;/del&gt;and the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;contractor’s facilities as may be determined by MDOT &lt;/del&gt;to &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;be necessary &lt;/del&gt;to &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;perform a subcontract compliance review&lt;/del&gt;. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt; Contractors &lt;/del&gt;are &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;required to assist MDOT staff during the review process as necessary, &lt;/del&gt;and &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;will not be entitled &lt;/del&gt;or &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;due any additional compensation for assisting &lt;/del&gt;with the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;compliance review&lt;/del&gt;. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt; &lt;/del&gt;MDOT &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;will provide a 24 hour minimum advance notification &lt;/del&gt;to the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;contractor for any planned review&lt;/del&gt;. &lt;del class=&quot;diffchange diffchange-inline&quot;&gt; The date&lt;/del&gt;, &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;time&lt;/del&gt;, &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;and location of the review will be mutually agreed upon by MDOT and the contractor&lt;/del&gt;.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;After each MDOT letting CSD will randomly select 12% of the let projects for an interim and/or post construction review of subcontracts.  The randomly selected projects will be provided &lt;/ins&gt;to &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;the Construction Field Services (CFS) &lt;/ins&gt;subcontract compliance &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;analyst to schedule and perform the interim and/or post construction &lt;/ins&gt;reviews. &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;The review is performed &lt;/ins&gt;to &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;ensure the subcontracting processes are followed &lt;/ins&gt;and &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;documented. The following criteria are reviewed: &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:# Subcontractor is MDOT prequalified in the work categories identified in the subcontract. &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:# Compliance with the 65 percent maximum subcontracting limit. &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:# Compliance with &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;50 percent maximum sub-subcontract limit. &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:# DBE participation sheets have been provided. &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:# Submittal of subcontracts &lt;/ins&gt;to &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;the Engineer prior &lt;/ins&gt;to &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;the commencement of the subcontracted work&lt;/ins&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:# Designated and/or specialty subcontractors &lt;/ins&gt;are &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;utilized if applicable. &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:# Required attachment documentation is incorporated &lt;/ins&gt;and&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;/&lt;/ins&gt;or &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;included &lt;/ins&gt;with the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;subcontracts (required attachments are outlined in Form 1302)&lt;/ins&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:# Compliance of subcontract language with &lt;/ins&gt;MDOT &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;and federal specifications, rules, policies, processes, procedures, etc. &lt;/ins&gt;&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot;&gt; &lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;:# Other documentation as needed &lt;/ins&gt;to &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;assure compliance with &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;above criteria (this may include: certified payroll, purchase agreements, [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1386&lt;/ins&gt;.&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;pdf Form 1386] Post Certification of Subcontract Compliance&lt;/ins&gt;, &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;[https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=2124A.pdf Form 2124A] Prime Contractor Bi-Weekly Statement of Subcontractor/Supplier Payments&lt;/ins&gt;, &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;etc.)&lt;/ins&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Failure to provide access to &lt;/del&gt;subcontracting &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;documentation will be documented &lt;/del&gt;and &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;submitted &lt;/del&gt;to the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Contract Performance Evaluation Review (CPER) Team for evaluation and possible recommendations to &lt;/del&gt;the &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Pre-Qualification Committee up to and including the loss of bidding privileges and prequalification&lt;/del&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;The prime contractor must certify compliance with &lt;/ins&gt;subcontracting &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;requirements by completing &lt;/ins&gt;and &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;signing [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1386.pdf Form 1386] Post Certification of Subcontract Compliance, prior &lt;/ins&gt;to the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;issuance of &lt;/ins&gt;the &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;final project pay estimate&lt;/ins&gt;.  &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{{top}}&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;{{top}}&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>SchaeferS</name></author>
	</entry>
	<entry>
		<id>https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6292&amp;oldid=prev</id>
		<title>Clarkj25: update form number</title>
		<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=6292&amp;oldid=prev"/>
		<updated>2021-06-16T15:18:53Z</updated>

		<summary type="html">&lt;p&gt;update form number&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left diff-editfont-monospace&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 15:18, 16 June 2021&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l35&quot; &gt;Line 35:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 35:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:6. Contractors must retain the original signed subcontract, including all required subcontract attachments, in their office or project files (either in paper or electronic format).   &lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:6. Contractors must retain the original signed subcontract, including all required subcontract attachments, in their office or project files (either in paper or electronic format).   &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:7. Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets ([http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;0178&lt;/del&gt;.pdf Form &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;0178&lt;/del&gt;]) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:7. Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets ([http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;2653&lt;/ins&gt;.pdf Form &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;2653&lt;/ins&gt;]) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracts are not approved by MDOT.  It is the engineer’s responsibility to ensure they have received pages 1 and 3 of the subcontract form prior to the start of work associated with the subcontract.  The engineer must enter the date received in the space provided and labeled as “Date Received by Engineer” located on page 1 of [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed].  The engineer must forward a copy of page 1 of [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed] to CSD for data entry.  For MDOT projects, this page must be electronically submitted to [mailto:MDOT-ConstructionSubcontracts@michigan.gov MDOT-ConstructionSubcontracts@michigan.gov] .  Local agency engineers may use the email address or fax a copy of page 1 to CSD at 517-241-4193.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracts are not approved by MDOT.  It is the engineer’s responsibility to ensure they have received pages 1 and 3 of the subcontract form prior to the start of work associated with the subcontract.  The engineer must enter the date received in the space provided and labeled as “Date Received by Engineer” located on page 1 of [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed].  The engineer must forward a copy of page 1 of [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed] to CSD for data entry.  For MDOT projects, this page must be electronically submitted to [mailto:MDOT-ConstructionSubcontracts@michigan.gov MDOT-ConstructionSubcontracts@michigan.gov] .  Local agency engineers may use the email address or fax a copy of page 1 to CSD at 517-241-4193.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Clarkj25</name></author>
	</entry>
	<entry>
		<id>https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=5734&amp;oldid=prev</id>
		<title>Clarkj25: /* Construction Subcontract Process */</title>
		<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=5734&amp;oldid=prev"/>
		<updated>2020-03-18T16:47:35Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;Construction Subcontract Process&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left diff-editfont-monospace&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 16:47, 18 March 2020&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l23&quot; &gt;Line 23:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 23:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:1. Contractors must submit a signed version of [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed], Subcontract, pages 1 and 3 to the TSC construction/project engineer or the respective local agency project engineer if applicable.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:1. Contractors must submit a signed version of [https://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302-FED.pdf Form 1302-Fed], Subcontract, pages 1 and 3 to the TSC construction/project engineer or the respective local agency project engineer if applicable.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:2. Contractors on aeronautics projects must submit [&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;http&lt;/del&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;.pdf Form &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;], Subcontract, pages 1 and 3 to the Office of Aeronautics, Project Management Section.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:2. Contractors on aeronautics projects must submit [&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;https&lt;/ins&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-FED&lt;/ins&gt;.pdf Form &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-Fed&lt;/ins&gt;], Subcontract, pages 1 and 3 to the Office of Aeronautics, Project Management Section.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:3. [&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;http&lt;/del&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;.pdf Form &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;], pages 1 and 3, must be submitted to the engineer (or Aeronautics as applicable) prior to the start of any subcontract work for the respective subcontractor.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:3. [&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;https&lt;/ins&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-FED&lt;/ins&gt;.pdf Form &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-Fed&lt;/ins&gt;], pages 1 and 3, must be submitted to the engineer (or Aeronautics as applicable) prior to the start of any subcontract work for the respective subcontractor.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:4. Contractors are responsible for following all the subcontract requirements, including providing the required subcontract attachments outlined in the Construction Contract Package document available at:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:4. Contractors are responsible for following all the subcontract requirements, including providing the required subcontract attachments outlined in the Construction Contract Package document available at:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;::http://www.michigan.gov/documents/mdot/MDOT_Awards_Contract_Package_307478_7.pdf?20140521094354&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;::http://www.michigan.gov/documents/mdot/MDOT_Awards_Contract_Package_307478_7.pdf?20140521094354&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:5. [&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;http&lt;/del&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;.pdf Form &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;] is also available on the MDOT forms page at:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:5. [&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;https&lt;/ins&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-FED&lt;/ins&gt;.pdf Form &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-Fed&lt;/ins&gt;] is also available on the MDOT forms page at:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;::http://mdotjboss.state.mi.us/webforms/WebFormsHome.htm&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;::http://mdotjboss.state.mi.us/webforms/WebFormsHome.htm&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l37&quot; &gt;Line 37:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 37:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:7. Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets ([http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=0178.pdf Form 0178]) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:7. Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets ([http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=0178.pdf Form 0178]) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracts are not approved by MDOT.  It is the engineer’s responsibility to ensure they have received pages 1 and 3 of the subcontract form prior to the start of work associated with the subcontract.  The engineer must enter the date received in the space provided and labeled as “Date Received by Engineer” located on page 1 of [&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;http&lt;/del&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;.pdf &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;form 1302A&lt;/del&gt;].  The engineer must forward a copy of page 1 of [&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;http&lt;/del&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;.pdf &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;form 1302A&lt;/del&gt;] to CSD for data entry.  For MDOT projects, this page must be electronically submitted to [mailto:MDOT-ConstructionSubcontracts@michigan.gov MDOT-ConstructionSubcontracts@michigan.gov] .  Local agency engineers may use the email address or fax a copy of page 1 to CSD at 517-241-4193.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracts are not approved by MDOT.  It is the engineer’s responsibility to ensure they have received pages 1 and 3 of the subcontract form prior to the start of work associated with the subcontract.  The engineer must enter the date received in the space provided and labeled as “Date Received by Engineer” located on page 1 of [&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;https&lt;/ins&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-FED&lt;/ins&gt;.pdf &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Form 1302-Fed&lt;/ins&gt;].  The engineer must forward a copy of page 1 of [&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;https&lt;/ins&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-FED&lt;/ins&gt;.pdf &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Form 1302-Fed&lt;/ins&gt;] to CSD for data entry.  For MDOT projects, this page must be electronically submitted to [mailto:MDOT-ConstructionSubcontracts@michigan.gov MDOT-ConstructionSubcontracts@michigan.gov] .  Local agency engineers may use the email address or fax a copy of page 1 to CSD at 517-241-4193.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Active projects are randomly selected by CSD for an interim and/or post construction review of subcontracts by the Construction Field Services (CFS) subcontract compliance analyst.  The review is performed to ensure the subcontracting processes are followed and documented.  The following criteria are reviewed:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Active projects are randomly selected by CSD for an interim and/or post construction review of subcontracts by the Construction Field Services (CFS) subcontract compliance analyst.  The review is performed to ensure the subcontracting processes are followed and documented.  The following criteria are reviewed:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l47&quot; &gt;Line 47:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 47:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:5. Submittal of subcontracts prior to the commencement of the subcontracted work.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:5. Submittal of subcontracts prior to the commencement of the subcontracted work.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:6. Designated and/or specialty subcontractors are utilized if applicable.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:6. Designated and/or specialty subcontractors are utilized if applicable.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:7. Required attachment documentation is incorporated and/or included with the subcontracts (required attachments are outlined in [&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;http&lt;/del&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;.pdf &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;form 1302A&lt;/del&gt;]).&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:7. Required attachment documentation is incorporated and/or included with the subcontracts (required attachments are outlined in [&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;https&lt;/ins&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-FED&lt;/ins&gt;.pdf &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;Form 1302-Fed&lt;/ins&gt;]).&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:8. Compliance of subcontract language with MDOT and federal specifications, rules, policies, processes, procedures, etc.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:8. Compliance of subcontract language with MDOT and federal specifications, rules, policies, processes, procedures, etc.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:9. Other documentation as needed to assure compliance with the above criteria (this may include: certified payroll, purchase agreements, [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1386.pdf form 1386,] [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=2124A.pdf form 2124A], etc…)   &lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:9. Other documentation as needed to assure compliance with the above criteria (this may include: certified payroll, purchase agreements, [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1386.pdf form 1386,] [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=2124A.pdf form 2124A], etc…)   &lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Clarkj25</name></author>
	</entry>
	<entry>
		<id>https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=5733&amp;oldid=prev</id>
		<title>Clarkj25: /* Construction Subcontract Process */</title>
		<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=5733&amp;oldid=prev"/>
		<updated>2020-03-18T16:43:44Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;Construction Subcontract Process&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left diff-editfont-monospace&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 16:43, 18 March 2020&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l21&quot; &gt;Line 21:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 21:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;2012 Standard Specifications for Construction.  The contractor must use its own organization to perform work amounting to at least 40 percent of the original contract amount.  This section of the specifications also refers to the department’s procedures for subcontracting, which are defined in this document.  All contractors must adhere to the following process:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;2012 Standard Specifications for Construction.  The contractor must use its own organization to perform work amounting to at least 40 percent of the original contract amount.  This section of the specifications also refers to the department’s procedures for subcontracting, which are defined in this document.  All contractors must adhere to the following process:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:1. Contractors must submit a signed version of [&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;http&lt;/del&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;.pdf Form &lt;del class=&quot;diffchange diffchange-inline&quot;&gt;1302A&lt;/del&gt;], Subcontract, pages 1 and 3 to the TSC construction/project engineer or the respective local agency project engineer if applicable.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:1. Contractors must submit a signed version of [&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;https&lt;/ins&gt;://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-FED&lt;/ins&gt;.pdf Form &lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;1302-Fed&lt;/ins&gt;], Subcontract, pages 1 and 3 to the TSC construction/project engineer or the respective local agency project engineer if applicable.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:2. Contractors on aeronautics projects must submit [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302A.pdf Form 1302A], Subcontract, pages 1 and 3 to the Office of Aeronautics, Project Management Section.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:2. Contractors on aeronautics projects must submit [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302A.pdf Form 1302A], Subcontract, pages 1 and 3 to the Office of Aeronautics, Project Management Section.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>Clarkj25</name></author>
	</entry>
	<entry>
		<id>https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=4975&amp;oldid=prev</id>
		<title>JohnsonN23: /* Construction Subcontract Process */</title>
		<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=4975&amp;oldid=prev"/>
		<updated>2017-07-11T17:00:18Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;Construction Subcontract Process&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left diff-editfont-monospace&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 17:00, 11 July 2017&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l37&quot; &gt;Line 37:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 37:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:7. Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets ([http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=0178.pdf Form 0178]) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:7. Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets ([http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=0178.pdf Form 0178]) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracts are not approved by MDOT.  It is the engineer’s responsibility to ensure they have received pages 1 and 3 of the subcontract form prior to the start of work associated with the subcontract.  The engineer must enter the date received in the space provided and labeled as “Date Received by Engineer” located on page 1 of [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302A.pdf form 1302A].  The engineer must forward a copy of page 1 of [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302A.pdf form 1302A] to CSD for data entry.  For MDOT projects, this page must be electronically submitted to [mailto:&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;mailto:&lt;/del&gt;MDOT-ConstructionSubcontracts@michigan.gov] .  Local agency engineers may use the email address or fax a copy of page 1 to CSD at 517-241-4193.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracts are not approved by MDOT.  It is the engineer’s responsibility to ensure they have received pages 1 and 3 of the subcontract form prior to the start of work associated with the subcontract.  The engineer must enter the date received in the space provided and labeled as “Date Received by Engineer” located on page 1 of [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302A.pdf form 1302A].  The engineer must forward a copy of page 1 of [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302A.pdf form 1302A] to CSD for data entry.  For MDOT projects, this page must be electronically submitted to [mailto:&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;MDOT-ConstructionSubcontracts@michigan.gov &lt;/ins&gt;MDOT-ConstructionSubcontracts@michigan.gov] .  Local agency engineers may use the email address or fax a copy of page 1 to CSD at 517-241-4193.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Active projects are randomly selected by CSD for an interim and/or post construction review of subcontracts by the Construction Field Services (CFS) subcontract compliance analyst.  The review is performed to ensure the subcontracting processes are followed and documented.  The following criteria are reviewed:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Active projects are randomly selected by CSD for an interim and/or post construction review of subcontracts by the Construction Field Services (CFS) subcontract compliance analyst.  The review is performed to ensure the subcontracting processes are followed and documented.  The following criteria are reviewed:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>JohnsonN23</name></author>
	</entry>
	<entry>
		<id>https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=4974&amp;oldid=prev</id>
		<title>JohnsonN23: /* Construction Subcontract Process */</title>
		<link rel="alternate" type="text/html" href="https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&amp;diff=4974&amp;oldid=prev"/>
		<updated>2017-07-11T16:58:41Z</updated>

		<summary type="html">&lt;p&gt;&lt;span dir=&quot;auto&quot;&gt;&lt;span class=&quot;autocomment&quot;&gt;Construction Subcontract Process&lt;/span&gt;&lt;/span&gt;&lt;/p&gt;
&lt;table class=&quot;diff diff-contentalign-left diff-editfont-monospace&quot; data-mw=&quot;interface&quot;&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;col class=&quot;diff-marker&quot; /&gt;
				&lt;col class=&quot;diff-content&quot; /&gt;
				&lt;tr class=&quot;diff-title&quot; lang=&quot;en&quot;&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;← Older revision&lt;/td&gt;
				&lt;td colspan=&quot;2&quot; style=&quot;background-color: #fff; color: #202122; text-align: center;&quot;&gt;Revision as of 16:58, 11 July 2017&lt;/td&gt;
				&lt;/tr&gt;&lt;tr&gt;&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot; id=&quot;mw-diff-left-l37&quot; &gt;Line 37:&lt;/td&gt;
&lt;td colspan=&quot;2&quot; class=&quot;diff-lineno&quot;&gt;Line 37:&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:7. Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets ([http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=0178.pdf Form 0178]) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;:7. Subcontracting requirements do not affect the required submittal of Disadvantaged Business Enterprises (DBE) Participation Sheets ([http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=0178.pdf Form 0178]) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt;−&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #ffe49c; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracts are not approved by MDOT.  It is the engineer’s responsibility to ensure they have received pages 1 and 3 of the subcontract form prior to the start of work associated with the subcontract.  The engineer must enter the date received in the space provided and labeled as “Date Received by Engineer” located on page 1 of [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302A.pdf form 1302A].  The engineer must forward a copy of page 1 of [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302A.pdf form 1302A] to CSD for data entry.  For MDOT projects, this page must be electronically submitted to [mailto:MDOT-&lt;del class=&quot;diffchange diffchange-inline&quot;&gt;Awards@michigan.gov MDOT-Awards&lt;/del&gt;@michigan.gov] .  Local agency engineers may use the email address or fax a copy of page 1 to CSD at 517-241-4193.&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt;+&lt;/td&gt;&lt;td style=&quot;color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #a3d3ff; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Subcontracts are not approved by MDOT.  It is the engineer’s responsibility to ensure they have received pages 1 and 3 of the subcontract form prior to the start of work associated with the subcontract.  The engineer must enter the date received in the space provided and labeled as “Date Received by Engineer” located on page 1 of [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302A.pdf form 1302A].  The engineer must forward a copy of page 1 of [http://mdotjboss.state.mi.us/webforms/GetDocument.htm?fileName=1302A.pdf form 1302A] to CSD for data entry.  For MDOT projects, this page must be electronically submitted to [&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;mailto:&lt;/ins&gt;mailto:MDOT-&lt;ins class=&quot;diffchange diffchange-inline&quot;&gt;ConstructionSubcontracts&lt;/ins&gt;@michigan.gov] .  Local agency engineers may use the email address or fax a copy of page 1 to CSD at 517-241-4193.&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;tr&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Active projects are randomly selected by CSD for an interim and/or post construction review of subcontracts by the Construction Field Services (CFS) subcontract compliance analyst.  The review is performed to ensure the subcontracting processes are followed and documented.  The following criteria are reviewed:&lt;/div&gt;&lt;/td&gt;&lt;td class='diff-marker'&gt; &lt;/td&gt;&lt;td style=&quot;background-color: #f8f9fa; color: #202122; font-size: 88%; border-style: solid; border-width: 1px 1px 1px 4px; border-radius: 0.33em; border-color: #eaecf0; vertical-align: top; white-space: pre-wrap;&quot;&gt;&lt;div&gt;Active projects are randomly selected by CSD for an interim and/or post construction review of subcontracts by the Construction Field Services (CFS) subcontract compliance analyst.  The review is performed to ensure the subcontracting processes are followed and documented.  The following criteria are reviewed:&lt;/div&gt;&lt;/td&gt;&lt;/tr&gt;
&lt;/table&gt;</summary>
		<author><name>JohnsonN23</name></author>
	</entry>
</feed>