Difference between revisions of "104.10 Claim for Extra Compensation or Extension of Time"

From MediaWiki
Jump to navigation Jump to search
Line 20: Line 20:
 
{{top}}
 
{{top}}
  
=[[#MICHIGAN DEPARTMENT OF TRANSPORTATION CONTRACTOR CLAIMS PROCEDURE (Revised 2018)|MICHIGAN DEPARTMENT OF TRANSPORTATION CONTRACTOR CLAIMS PROCEDURE (Revised 2018)]]=
+
=[[#MICHIGAN DEPARTMENT OF TRANSPORTATION CONTRACTOR CLAIMS PROCEDURE (Revised 2018)|MICHIGAN DEPARTMENT OF TRANSPORTATION CONTRACTOR CLAIMS PROCEDURE (Revised 2019)]]=
[[File:MDOT Construction Contractor Claims Procedure September 2018.pdf|500px|thumbnail|center|MDOT Construction Contractor Claims Procedure September 2018.pdf]]
+
[[File:MDOT Construction Contractor Claims Procedure January 2019.pdf|500px|thumbnail|center|MDOT Construction Contractor Claims Procedure January 2019.pdf]]
  
  

Revision as of 17:01, 10 January 2019

Email this Page

General

The Michigan Department of Transportation Construction Contractor Claims Procedure provides a formalized, tiered process for the submittal and review of a Contractor’s claim. The claim review process involves a formalized administrative procedure. The goal of the process is to resolve claims at the lowest possible level. This document will clarify the process and reinforce the level of attention, accountability, and urgency by the Contractor and Department in the claim process. The time durations within the procedures are intended to be maximum timeframes with any request for an extension to the durations, whether by the Contractor or the Department, documented in writing.

Construction Field Services (CFS) and Region Construction Engineers will be monitoring and tracking all claims. The procedures for the reporting and tracking of claims are as follows:

  • A copy of all notices of intent to file claims (MDOT and local agency) must be provided to TSC Managers and Region Construction Engineers as noted in the procedures.
  • The Federal Highway Administration (FHWA) Area Engineer must be notified on all Projects of Division Interest (PODI) when a claim meeting is scheduled or an issue is scheduled to be presented to a Dispute Review Board (DRB). A copy of the DRB claim package is to be provided to the FHWA Area Engineer.
  • All claim decision letters from the Region Office Review hearings are to be copied to both the Region Construction Engineer and the CFS Construction Contracts Engineer.

Please send all (project, region and central office) claim decision letters to the contractor by certified mail. The Return Receipt is to be placed in the project file. This documentation will be used when determining if subsequent appeals are timely. If you receive what appears to be an untimely appeal from a contractor, contact the Attorney General’s Office (517-373-1479) for recommended action.

This information will replace the claim procedures in section 104 of the construction manual.

If you have any questions, please contact Michael DeBoer, Construction Contracts Engineer, at or call him at 517-256-8368.

[top of page]


MICHIGAN DEPARTMENT OF TRANSPORTATION CONTRACTOR CLAIMS PROCEDURE (Revised 2019)

MDOT Construction Contractor Claims Procedure January 2019.pdf