Difference between revisions of "104.10 Claim for Extra Compensation or Extension of Time"

From MediaWiki
Jump to navigation Jump to search
m
Line 1: Line 1:
<div style="text-align: center;">[mailto:Change?body=https://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension Email this Page]</div>
+
<div style="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension Email this Page]</div>
 
=[[#General|General]]=
 
=[[#General|General]]=
  
Line 19: Line 19:
  
 
If you have any questions, please contact [mailto:ClarkJ25@michigan.gov Jason Clark], Construction Contracts Engineer, at  or call him at 517-242-6378.
 
If you have any questions, please contact [mailto:ClarkJ25@michigan.gov Jason Clark], Construction Contracts Engineer, at  or call him at 517-242-6378.
<div style="text-align: right;">[mailto:Change?body=https://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension Email this Page]</div>
+
<div style="text-align: right;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension Email this Page]</div>
 
{{top}}
 
{{top}}
 
=[[#MICHIGAN DEPARTMENT OF TRANSPORTATION CLAIMS PROCEDURE (Revised 2016)|MICHIGAN DEPARTMENT OF TRANSPORTATION CLAIMS PROCEDURE (Revised 2016)]]=
 
=[[#MICHIGAN DEPARTMENT OF TRANSPORTATION CLAIMS PROCEDURE (Revised 2016)|MICHIGAN DEPARTMENT OF TRANSPORTATION CLAIMS PROCEDURE (Revised 2016)]]=
Line 28: Line 28:
 
====[[#Claims Process Flowchart|Claims Process Flowchart]]====
 
====[[#Claims Process Flowchart|Claims Process Flowchart]]====
 
[[File:CLAIMS Flowchart DRAFT -SACT Review Complete.pdf|500px|thumbnail|center|Claims Process Flowchart]]
 
[[File:CLAIMS Flowchart DRAFT -SACT Review Complete.pdf|500px|thumbnail|center|Claims Process Flowchart]]
<div style="text-align: right;">[mailto:Change?body=https://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension Email this Page]</div>
+
<div style="text-align: right;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension Email this Page]</div>
 
{{top}}
 
{{top}}
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]
 
[[Category:Division 1]]
 
[[Category:Division 1]]
 
[[Category:Section 104]]
 
[[Category:Section 104]]

Revision as of 14:43, 19 June 2017

Email this Page

General

The Michigan Department of Transportation Construction Contractor Claims Procedure provides a formalized, tiered process for the submittal and review of a Contractor’s claim. The claim review process involves a formalized administrative procedure. The goal of the process is to resolve claims at the lowest possible level. This document will clarify the process and reinforce the level of attention, accountability, and urgency by the Contractor and Department in the claim process. The time durations within the procedures are intended to be maximum timeframes with any request for an extension to the durations, whether by the Contractor or the Department, documented in writing.

Construction Field Services (CFS) and Region Construction Engineers will be monitoring and tracking all claims. The procedures for the reporting and tracking of claims are as follows:

  • A copy of all notices of intent to file claims (MDOT and local agency) must be provided to TSC Managers and Region Construction Engineers as noted in the procedures.
  • The claim information must be entered in the central office claim database after receiving Form 1953 from the Contractor.
  • The Federal Highway Administration (FHWA) Area Engineer must be notified on all Projects of Division Interest (PODI) when a claim meeting is scheduled or an issue is scheduled to be presented to a Dispute Review Board (DRB). A copy of the DRB claim package is to be provided to the FHWA Area Engineer.
  • All claim decision letters from the Region Office Review hearings are to be copied to both the Region Construction Engineer and the CFS Construction Contracts Engineer.

Please send all (project, region and central office) claim decision letters to the contractor by certified mail. The Return Receipt is to be placed in the project file. This documentation will be used when determining if subsequent appeals are timely. If you receive what appears to be an untimely appeal from a contractor, contact the Attorney General’s Office (517-373-1479) for recommended action.

This information will replace the claim procedures in section 104 of the construction manual.

If you have any questions, please contact Jason Clark, Construction Contracts Engineer, at or call him at 517-242-6378.

Email this Page

[top of page]


MICHIGAN DEPARTMENT OF TRANSPORTATION CLAIMS PROCEDURE (Revised 2016)

The MDOT Claims Procedure Manual is published on the MDOT website.

[top of page]



Claims Process Flowchart

Claims Process Flowchart