110 Mobilization

From MediaWiki
Revision as of 10:58, 23 October 2024 by Clarkj25 (talk | contribs) (→‎Mobilization Payment)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
110 - Mobilization




[top of page]



GENERAL DESCRIPTION

-Reserved-


[top of page]


MATERIALS

-Reserved-



[top of page]


EQUIPMENT

-Reserved-


[top of page]



PRECONSTRUCTION

-Reserved-


[top of page]


CONSTRUCTION

-Reserved-


[top of page]


INSPECTION & TESTING

-Reserved-

[top of page]


MEASUREMENT, DOCMENTATION & PAYMENT

Basis of Payment

Mobilization Payment

The prime contractor is to be paid for Mobilization, Max ___ per Section 110, Table 110-1, of the Standard Specifications for Construction. The supporting documentation for this pay item is to be an DWR posted by the engineer (or their representative) and placed in the project file. The DWR is to be generated when the contract value earned reaches 5, 10, and 25 percent value of the original contract amount. The notation of contract value earned and a statement that payment is being made per Section 110 of the Standard Specifications for Construction are to be documented on the DWR.

It must be noted that mobilization is to be paid based on the contract amount and not on any subset of projects within the contract ID. As an example, when the original contract amount earned reaches 5 percent, all projects within the contract are to be paid at 50 percent of their mobilization values. This payment value should be checked against 50 percent of the as bid mobilization amount for verification of proper payment.