Difference between revisions of "202 - Removing Trees, Stumps, and Corduroy"

From MediaWiki
Jump to navigation Jump to search
m
m (Removed 2012 Spec Book tagline link)
(3 intermediate revisions by 2 users not shown)
Line 4: Line 4:
 
<center><span STYLE="font: 40pt arial;">'''Removing Trees, Stumps, and Corduroy'''</span></center>
 
<center><span STYLE="font: 40pt arial;">'''Removing Trees, Stumps, and Corduroy'''</span></center>
  
<center>[http://mdotcf.state.mi.us/public/specbook/files/2012/202%20Rem%20Tree%20Stump%20Cord.pdf 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 202]</center>
 
  
 
+
==[[#GENERAL|GENERAL]]==
==GENERAL==
 
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
Line 13: Line 11:
 
{{top}}
 
{{top}}
  
==MATERIALS==
+
==[[#MATERIALS|MATERIALS]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
Line 19: Line 17:
 
{{top}}
 
{{top}}
  
==CONSTRUCTION==
+
==[[#CONSTRUCTION|CONSTRUCTION]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
Line 25: Line 23:
 
{{top}}
 
{{top}}
  
==MEASUREMENT AND PAYMENT==
+
==[[#MEASUREMENT AND PAYMENT|MEASUREMENT AND PAYMENT]]==
  
  
===Instructions for Removing Trees and Stumps===
+
===[[#Instructions for Removing Trees and Stumps|Instructions for Removing Trees and Stumps]]===
  
 
These items will apply to locations outside the areas to be paid as '''Clearing'''.
 
These items will apply to locations outside the areas to be paid as '''Clearing'''.
Line 46: Line 44:
 
{{top}}
 
{{top}}
  
===Instructions for Removing Corduroy===
+
===[[#Instructions for Removing Corduroy|Instructions for Removing Corduroy]]===
  
 
When corduroy is found within 4 feet (1.2 m) below plan grade, its removal will be by the foot (meter) measured along the roadway centerline.
 
When corduroy is found within 4 feet (1.2 m) below plan grade, its removal will be by the foot (meter) measured along the roadway centerline.
Line 55: Line 53:
  
 
{{top}}
 
{{top}}
 +
 +
[[Category:Construction Manual]]
 +
[[Category:Divison 2]]
 +
[[Category: Section 202]]

Revision as of 17:44, 12 January 2022

202
Removing Trees, Stumps, and Corduroy


GENERAL

-Reserved-

[top of page]


MATERIALS

-Reserved-

[top of page]


CONSTRUCTION

-Reserved-

[top of page]


MEASUREMENT AND PAYMENT

Instructions for Removing Trees and Stumps

These items will apply to locations outside the areas to be paid as Clearing.

Work in progress and work completed should be reported in the same manner as Clearing.

Pay quantity is shown when work for each item is completed.

All trees and stumps should be measured according to the Standard Specifications for Construction and the location of each item should be reported on the IDR when completed, including location as to stationing and distance from the centerline.

Removal of trees and stumps less than 6 inches (200 mm) in diameter, although not pay items, should still be measured and shown on the IDR to provide evidence of measurement, in case claims for payment arise.

Any disagreement concerning measurements or pay items for trees removed at or near the clearing limits should be brought to the Engineer’s attention at once.

Trees and stumps will be disposed of as specified in subsection 201.03 of the Standard Specifications for Construction.

[top of page]


Instructions for Removing Corduroy

When corduroy is found within 4 feet (1.2 m) below plan grade, its removal will be by the foot (meter) measured along the roadway centerline.

The length and stationing where corduroy was found should be clearly shown on the IDR.

Corduroy will be disposed of as specified in subsection 201.03 of the Standard Specifications for Construction.