Difference between revisions of "205 - Roadway Earthwork"
Jump to navigation
Jump to search
(Created page with "205 - Roadway Earthwork * 205.01 - Earth Excavation * 205.02 - Preparing Roadway Foundation * 205.03 - Rock Excavation * 205.04 - Blasting * [[205.05 - Subgra...") |
|||
Line 12: | Line 12: | ||
* [[205.10 - Test Rolling]] | * [[205.10 - Test Rolling]] | ||
* [[205.11 - Trimming and Finishing Earth Grade]] | * [[205.11 - Trimming and Finishing Earth Grade]] | ||
− | * [[205.12 - Wetland Construction]] | + | * [[205.12 - BORROW/USE OF EXCESS PROPERTY]] |
− | * [[205. | + | * [[205.13 - Wetland Construction]] |
+ | * [[205.14 - Machine Grading]] | ||
* [[205.14 - Measurement of Earthwork]] | * [[205.14 - Measurement of Earthwork]] |
Revision as of 14:07, 23 May 2013
205 - Roadway Earthwork
- 205.01 - Earth Excavation
- 205.02 - Preparing Roadway Foundation
- 205.03 - Rock Excavation
- 205.04 - Blasting
- 205.05 - Subgrade Undercutting
- 205.06 - Constructing Ditches
- 205.07 - Disposing of Surplus and Unsuitable Material
- 205.08 - Constructing Embankments
- 205.09 - Swamp Treatment
- 205.10 - Test Rolling
- 205.11 - Trimming and Finishing Earth Grade
- 205.12 - BORROW/USE OF EXCESS PROPERTY
- 205.13 - Wetland Construction
- 205.14 - Machine Grading
- 205.14 - Measurement of Earthwork