Difference between revisions of "209 - Project Cleanup"

From MediaWiki
Jump to navigation Jump to search
m
Line 2: Line 2:
 
<center><span STYLE="font: 60pt arial;">'''209'''</span></center>
 
<center><span STYLE="font: 60pt arial;">'''209'''</span></center>
  
<center><span STYLE="font: 40pt arial;">'''Project cleanup'''</span></center>
+
<center><span STYLE="font: 40pt arial;">'''Project Cleanup'''</span></center>
  
 
<center>[http://mdotcf.state.mi.us/public/specbook/files/2012/209%20Project%20Cleanup.pdf 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 209]</center>
 
<center>[http://mdotcf.state.mi.us/public/specbook/files/2012/209%20Project%20Cleanup.pdf 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 209]</center>

Revision as of 13:45, 14 June 2013

209
Project Cleanup
2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 209


GENERAL

This work consists of cleaning up the project, including roadsides, prior to final acceptance. Cleanup applies to the area within the ROW not in excess of 50 feet (15 meters) beyond the grading limits. Within this area, all debris, including fences, fallen timber, logs, guardrail sections and posts, rocks, boulders and all other rubbish will be removed and disposed of as specified. At the time that project cleanup is taking place, the clean out of all culverts, sewers and drainage structures that contain sediment from the Contractor's operations should also take place (clean out of siltation or debris caused by the Contractor's operations will be at the Contractor's expense). Refer also to subsection 103.07 of the Standard Specifications for Construction for other cleanup items required to take place prior to final acceptance of the project.


MATERIALS

-Reserved-


CONSTRUCTION

-Reserved-


MEASUREMENT AND PAYMENT

-Reserved-