Difference between revisions of "306 - Aggregate Surface Course"
Jump to navigation
Jump to search
306
Aggregate Surface Course
(Created page with "306 - Aggregate Surface Course * 306.01 - General") |
m (Removed 2012 Spec Book tagline link) |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | |||
− | + | <center><span STYLE="font: 60pt arial;">'''306'''</span></center> | |
+ | |||
+ | <center><span STYLE="font: 40pt arial;">'''Aggregate Surface Course'''</span></center> | ||
+ | |||
+ | |||
+ | ==[[#GENERAL|GENERAL]]== | ||
+ | |||
+ | Compliance with density requirements for aggregate surface course construction is just as important as for aggregate base construction. Poor compactive efforts and failure to adhere to placement guidelines will result in settlement and rutting. Rutting of the surface during construction and prior to final grading and shaping should be repaired by scarifying to a depth below the ruts and recompacting to 98 percent of the maximum unit weight. The filling in of ruts by just blading the surface is not an adequate repair and will only lead to segregation and further rutting. | ||
+ | |||
+ | {{top}} | ||
+ | |||
+ | ==[[#MATERIALS|MATERIALS]]== | ||
+ | |||
+ | <span style="color: red"> -Reserved- </span> | ||
+ | |||
+ | {{top}} | ||
+ | |||
+ | ==[[#CONSTRUCTION|CONSTRUCTION]]== | ||
+ | |||
+ | <span style="color: red"> -Reserved- </span> | ||
+ | |||
+ | {{top}} | ||
+ | |||
+ | ==[[#MEASUREMENT AND PAYMENT|MEASUREMENT AND PAYMENT]]== | ||
+ | |||
+ | <span style="color: red"> -Reserved- </span> | ||
+ | |||
+ | {{top}} | ||
+ | |||
+ | [[Category:Construction Manual]] | ||
+ | [[Category:Division 3]] | ||
+ | [[Category:Section 306]] |
Latest revision as of 16:58, 12 January 2022
GENERAL
Compliance with density requirements for aggregate surface course construction is just as important as for aggregate base construction. Poor compactive efforts and failure to adhere to placement guidelines will result in settlement and rutting. Rutting of the surface during construction and prior to final grading and shaping should be repaired by scarifying to a depth below the ruts and recompacting to 98 percent of the maximum unit weight. The filling in of ruts by just blading the surface is not an adequate repair and will only lead to segregation and further rutting.
MATERIALS
-Reserved-
CONSTRUCTION
-Reserved-
MEASUREMENT AND PAYMENT
-Reserved-