Difference between revisions of "502 - HMA Crack Treatment"
Jump to navigation
Jump to search
(Created page with "502 - HMA Construction Practices * 501.01 - Materials * 501.02 - Equipment * 501.03 - Surface Preperation * 501.04 - Adjusting Drainage Structures * [[501.05 ...") |
|||
Line 14: | Line 14: | ||
* [[501.12 - Surface Tolerances]] | * [[501.12 - Surface Tolerances]] | ||
* [[501.13 - Payment]] | * [[501.13 - Payment]] | ||
− | * [[501.14 - Paving | + | * [[501.14 - Paving Inspector's Checklist]] |
+ | * [[501.15 - Mat Troubleshooting Guide]] | ||
+ | * [[501.16 - MDOT Standard Practice for Random Sampling of HMA Materials]] | ||
+ | * [[501.17 - Temporary Patching with HMA Mixtures]] | ||
+ | * [[501.18 - Glossary of Paving Terms]] |
Revision as of 11:46, 22 May 2013
502 - HMA Construction Practices
- 501.01 - Materials
- 501.02 - Equipment
- 501.03 - Surface Preperation
- 501.04 - Adjusting Drainage Structures
- 501.05 - Wedging
- 501.06 - Bond Coat
- 501.07 - Placing HMA Mixture
- 501.08 - Joints
- 501.09 - Compaction
- 501.10 - Coring
- 501.11 - Surface Defects
- 501.12 - Surface Tolerances
- 501.13 - Payment
- 501.14 - Paving Inspector's Checklist
- 501.15 - Mat Troubleshooting Guide
- 501.16 - MDOT Standard Practice for Random Sampling of HMA Materials
- 501.17 - Temporary Patching with HMA Mixtures
- 501.18 - Glossary of Paving Terms