502 - HMA Crack Treatment
Jump to navigation
Jump to search
502 - HMA Construction Practices
- 501.01 - Materials
- 501.02 - Equipment
- 501.03 - Surface Preperation
- 501.04 - Adjusting Drainage Structures
- 501.05 - Wedging
- 501.06 - Bond Coat
- 501.07 - Placing HMA Mixture
- 501.08 - Joints
- 501.09 - Compaction
- 501.10 - Coring
- 501.11 - Surface Defects
- 501.12 - Surface Tolerances
- 501.13 - Payment
- 501.14 - Paving Inspector's Checklist
- 501.15 - Mat Troubleshooting Guide
- 501.16 - MDOT Standard Practice for Random Sampling of HMA Materials
- 501.17 - Temporary Patching with HMA Mixtures
- 501.18 - Glossary of Paving Terms