==[[#GENERAL DESCRIPTION|'''GENERAL DESCRIPTION''']]==
  
==GENERAL==
 
  
<span style="color: red"> -Reserved- <span>
+
<span style="color: red"> -Reserved- </span>
  
 +
{{top}}
  
==MATERIALS==
 
  
<span style="color: red"> -Reserved- <span>
+
==[[#MATERIALS|'''MATERIALS''']]==
  
 +
===[[#Electrical and Lighting Conduit|Electrical and Lighting Conduit]]===
  
==CONSTRUCTION==
+
Labeled conduit is defined as having the certification mark (as shown on the following NRTL website for each laboratory) of the testing laboratory printed, stamped or otherwise physically on the conduit. The NRTLs can be found at the following website:
  
<span style="color: red"> -Reserved- <span>
+
::https://www.osha.gov/dts/otpca/nrtl/nrtllist.html
  
  
==MEASUREMENT AND PAYMENT==
 
  
<span style="color: red"> -Reserved- <span>
+
{{top}}
 +
==[[#EQUIPMENT|'''EQUIPMENT''']]==
 +
<span style="color: red"> -Reserved- </span>
 +
 
 +
{{top}}
 +
 
 +
==[[#PRECONSTRUCTION|'''PRECONSTRUCTION''']]==
 +
 
 +
<span style="color: red"> -Reserved- </span>
 +
 
 +
{{top}}
 +
 
 +
 
 +
==[[#CONSTRUCTION|'''CONSTRUCTION''']]==
 +
 
 +
 
 +
<span style="color: red"> -Reserved- </span>
 +
 
 +
{{top}}
 +
 
 +
==[[#INSPECTION & TESTING|'''INSPECTION & TESTING''']]==
 +
 
 +
===Initial Inspection===
 +
 
 +
This inspection should be performed shortly after an asset is constructed. Please reference [https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports#INSPECTION_.26_TESTING Section 810] for initial asset inspection procedures of frangible light pole structures, non-frangible light pole structures, and tower lighting structures.
 +
 
 +
{{top}}
 +
 
 +
==[[#MEASUREMENT, DOCMENTATION & PAYMENT|'''MEASUREMENT, DOCMENTATION & PAYMENT''']]==
 +
 
 +
 
 +
<span style="color: red"> -Reserved- </span>
 +
 
 +
{{top}}
 +
 
 +
 
 +
 
 +
 
 +
[[Category:Construction Manual]]
 +
[[Category: Division 8]]
 +
[[Category: Section 819]]
 +
[[Category:New CM Format]]

Latest revision as of 15:46, 2 April 2024

819
Electrical and Lighting


GENERAL DESCRIPTION

-Reserved-

[top of page]



MATERIALS

Electrical and Lighting Conduit

Labeled conduit is defined as having the certification mark (as shown on the following NRTL website for each laboratory) of the testing laboratory printed, stamped or otherwise physically on the conduit. The NRTLs can be found at the following website:

https://www.osha.gov/dts/otpca/nrtl/nrtllist.html


[top of page]


EQUIPMENT

-Reserved-

[top of page]


PRECONSTRUCTION

-Reserved-

[top of page]



CONSTRUCTION

-Reserved-

[top of page]


INSPECTION & TESTING

Initial Inspection

This inspection should be performed shortly after an asset is constructed. Please reference Section 810 for initial asset inspection procedures of frangible light pole structures, non-frangible light pole structures, and tower lighting structures.

[top of page]


MEASUREMENT, DOCMENTATION & PAYMENT

-Reserved-

[top of page]