==[[#GENERAL DESCRIPTION|'''GENERAL DESCRIPTION''']]==
  
==[[#GENERAL|GENERAL]]==
 
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
Line 13: Line 12:
 
{{top}}
 
{{top}}
  
==[[#MATERIALS|MATERIALS]]==
+
 
 +
==[[#MATERIALS|'''MATERIALS''']]==
  
 
===[[#Electrical and Lighting Conduit|Electrical and Lighting Conduit]]===
 
===[[#Electrical and Lighting Conduit|Electrical and Lighting Conduit]]===
Effective with the February 6, 2015, letting and beyond, a special provision will be placed in all projects that will allow the use of conduits listed and appropriately labeled by a Nationally Recognized Testing Laboratory (NRTL), as recognized by Occupational Safety and Health Administration (OSHA). The conduit specification requirements have not changed, this change simply allows other NRTLs to test and certify the conduit to Underwriters Laboratories Inc. (UL) standards.
 
  
 
Labeled conduit is defined as having the certification mark (as shown on the following NRTL website for each laboratory) of the testing laboratory printed, stamped or otherwise physically on the conduit. The NRTLs can be found at the following website:  
 
Labeled conduit is defined as having the certification mark (as shown on the following NRTL website for each laboratory) of the testing laboratory printed, stamped or otherwise physically on the conduit. The NRTLs can be found at the following website:  
Line 22: Line 21:
 
::https://www.osha.gov/dts/otpca/nrtl/nrtllist.html  
 
::https://www.osha.gov/dts/otpca/nrtl/nrtllist.html  
  
The frequently used special provision is labeled as [http://mdotcf.state.mi.us/public/dessssp/spss_source/12SP-918A-01(1).pdf 12SP-918A-01].
+
 
 +
 
 +
{{top}}
 +
==[[#EQUIPMENT|'''EQUIPMENT''']]==
 +
<span style="color: red"> -Reserved- </span>
  
 
{{top}}
 
{{top}}
  
==[[#CONSTRUCTION|CONSTRUCTION]]==
+
==[[#PRECONSTRUCTION|'''PRECONSTRUCTION''']]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
Line 32: Line 35:
 
{{top}}
 
{{top}}
  
==[[#MEASUREMENT AND PAYMENT|MEASUREMENT AND PAYMENT]]==
+
 
 +
==[[#CONSTRUCTION|'''CONSTRUCTION''']]==
 +
 
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
  
 
{{top}}
 
{{top}}
 +
 +
==[[#INSPECTION & TESTING|'''INSPECTION & TESTING''']]==
 +
 +
===Initial Inspection===
 +
 +
This inspection should be performed shortly after an asset is constructed. Please reference [https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports#INSPECTION_.26_TESTING Section 810] for initial asset inspection procedures of frangible light pole structures, non-frangible light pole structures, and tower lighting structures.
 +
 +
{{top}}
 +
 +
==[[#MEASUREMENT, DOCMENTATION & PAYMENT|'''MEASUREMENT, DOCMENTATION & PAYMENT''']]==
 +
 +
 +
<span style="color: red"> -Reserved- </span>
 +
 +
{{top}}
 +
 +
 +
  
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]
 +
[[Category: Division 8]]
 +
[[Category: Section 819]]
 +
[[Category:New CM Format]]

Latest revision as of 15:46, 2 April 2024

819
Electrical and Lighting


GENERAL DESCRIPTION

-Reserved-

[top of page]



MATERIALS

Electrical and Lighting Conduit

Labeled conduit is defined as having the certification mark (as shown on the following NRTL website for each laboratory) of the testing laboratory printed, stamped or otherwise physically on the conduit. The NRTLs can be found at the following website:

https://www.osha.gov/dts/otpca/nrtl/nrtllist.html


[top of page]


EQUIPMENT

-Reserved-

[top of page]


PRECONSTRUCTION

-Reserved-

[top of page]



CONSTRUCTION

-Reserved-

[top of page]


INSPECTION & TESTING

Initial Inspection

This inspection should be performed shortly after an asset is constructed. Please reference Section 810 for initial asset inspection procedures of frangible light pole structures, non-frangible light pole structures, and tower lighting structures.

[top of page]


MEASUREMENT, DOCMENTATION & PAYMENT

-Reserved-