Difference between revisions of "824 - Contractor Staking"

From MediaWiki
Jump to navigation Jump to search
m (→‎CONSTRUCTION: Added subheading "Use of Automated Machine Guidance (AMG)" along with content and attachments as a part of CMU 2016-001)
 
Line 41: Line 41:
  
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]
 +
[[Category: Division 8]]
 +
[[Category: Section 824]]

Latest revision as of 17:20, 12 May 2021

824
Contractor Staking
2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 824


GENERAL

-Reserved-

[top of page]


MATERIALS

-Reserved-

[top of page]


CONSTRUCTION

[top of page]


Use of Automated Machine Guidance (AMG)

The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG). The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work. These procedures apply to all federal and state funded projects that use the AMG process.

File:CMU16-001 AMG Attachment Final.pdf

File:CMU16-001 AMG Sample Work Plan Final.pdf

File:CMU16-001 AMG Verification Form Final.pdf


[top of page]


MEASUREMENT AND PAYMENT

-Reserved-

[top of page]