Difference between revisions of "824 - Contractor Staking"

From MediaWiki
Jump to navigation Jump to search
m
(3 intermediate revisions by 2 users not shown)
Line 7: Line 7:
  
  
==GENERAL==
+
==[[#GENERAL|GENERAL]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
  
 +
{{top}}
  
==MATERIALS==
+
==[[#MATERIALS|MATERIALS]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
  
 +
{{top}}
  
==CONSTRUCTION==
+
==[[#CONSTRUCTION|CONSTRUCTION]]==
 +
{{top}}
 +
 
 +
====[[#Use of Automated Machine Guidance (AMG)|Use of Automated Machine Guidance (AMG)]]====
 +
The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG).  The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work.  These procedures apply to all federal and state funded projects that use the AMG process.
 +
 
 +
[[File:CMU16-001 AMG Attachment Final.pdf|500px|thumbnail|center|Automated Machine Guidance]]
 +
 
 +
[[File:CMU16-001 AMG Sample Work Plan Final.pdf|500px|thumbnail|center|AMG Sample Work Plan]]
 +
 
 +
[[File:CMU16-001 AMG Verification Form Final.pdf|500px|thumbnail|center|AMG Verification Form]]
  
<span style="color: red"> -Reserved- </span>
 
  
 +
{{top}}
  
==MEASUREMENT AND PAYMENT==
+
==[[#MEASUREMENT AND PAYMENT|MEASUREMENT AND PAYMENT]]==
  
 
<span style="color: red"> -Reserved- </span>
 
<span style="color: red"> -Reserved- </span>
 +
 +
{{top}}
 +
 +
[[Category:Construction Manual]]
 +
[[Category: Division 8]]
 +
[[Category: Section 824]]

Revision as of 17:20, 12 May 2021

824
Contractor Staking
2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 824


GENERAL

-Reserved-

[top of page]


MATERIALS

-Reserved-

[top of page]


CONSTRUCTION

[top of page]


Use of Automated Machine Guidance (AMG)

The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG). The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work. These procedures apply to all federal and state funded projects that use the AMG process.

Automated Machine Guidance
AMG Sample Work Plan
AMG Verification Form


[top of page]


MEASUREMENT AND PAYMENT

-Reserved-

[top of page]