Difference between revisions of "824 - Contractor Staking"
Jump to navigation
Jump to search
824
Contractor Staking
2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 824
m |
|||
(3 intermediate revisions by 2 users not shown) | |||
Line 7: | Line 7: | ||
− | ==GENERAL== | + | ==[[#GENERAL|GENERAL]]== |
<span style="color: red"> -Reserved- </span> | <span style="color: red"> -Reserved- </span> | ||
+ | {{top}} | ||
− | ==MATERIALS== | + | ==[[#MATERIALS|MATERIALS]]== |
<span style="color: red"> -Reserved- </span> | <span style="color: red"> -Reserved- </span> | ||
+ | {{top}} | ||
− | ==CONSTRUCTION== | + | ==[[#CONSTRUCTION|CONSTRUCTION]]== |
+ | {{top}} | ||
+ | |||
+ | ====[[#Use of Automated Machine Guidance (AMG)|Use of Automated Machine Guidance (AMG)]]==== | ||
+ | The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG). The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work. These procedures apply to all federal and state funded projects that use the AMG process. | ||
+ | |||
+ | [[File:CMU16-001 AMG Attachment Final.pdf|500px|thumbnail|center|Automated Machine Guidance]] | ||
+ | |||
+ | [[File:CMU16-001 AMG Sample Work Plan Final.pdf|500px|thumbnail|center|AMG Sample Work Plan]] | ||
+ | |||
+ | [[File:CMU16-001 AMG Verification Form Final.pdf|500px|thumbnail|center|AMG Verification Form]] | ||
− | |||
+ | {{top}} | ||
− | ==MEASUREMENT AND PAYMENT== | + | ==[[#MEASUREMENT AND PAYMENT|MEASUREMENT AND PAYMENT]]== |
<span style="color: red"> -Reserved- </span> | <span style="color: red"> -Reserved- </span> | ||
+ | |||
+ | {{top}} | ||
+ | |||
+ | [[Category:Construction Manual]] | ||
+ | [[Category: Division 8]] | ||
+ | [[Category: Section 824]] |
Revision as of 17:20, 12 May 2021
GENERAL
-Reserved-
MATERIALS
-Reserved-
CONSTRUCTION
Use of Automated Machine Guidance (AMG)
The following information will serve as guidance for the administration of projects that incorporate the Special Provision for Automated Machine Guidance (AMG). The documentation is specific for AMG projects and supplements information for the Engineer in the special provision for the administration of AMG work. These procedures apply to all federal and state funded projects that use the AMG process.
MEASUREMENT AND PAYMENT
-Reserved-