Difference between revisions of "Dispute Review Board (DRB)"

From MediaWiki
Jump to navigation Jump to search
(→‎Dispute Review Board (DRB): Updated new website page link for Sitecore)
 
(11 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
<div style="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)_Procedures Email this Page]</div>
 
<div style="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)_Procedures Email this Page]</div>
==[[#Dispute Review Board (DRB) Procedures|Dispute Review Board (DRB) Procedures]]==
+
==[[#Dispute Review Board (DRB)|Dispute Review Board (DRB)]]==
This DRB Procedured describes the Michigan Department of Transportation (MDOT) procedures for submittal and review of Contractor claims and Contractor performance evaluation appeals using a Dispute Review Board (DRB).  The Dispute Review Board (DRB) process is used on projects that have incorporated the Special Provision for Dispute Review Board.  The DRB process is used on Contractor claims and Contractor performance evaluation appeals as described within.
 
  
The most current DRB Procedures are published on the website and linked below:<br />
+
The Dispute Review Board (DRB) process is used on projects that have incorporated the Special Provision for Dispute Review Board. The DRB Procedures describe the MDOT procedures for submittal and review of Contractor claims using a Dispute Review Board (DRB). For more information, please refer to the Dispute Review Board folder in ProjectWise. It is located under the following path: MDOTProjectWise\Documents\External Partnerships\Dispute Review Board (DRB).
  
[http://www.michigan.gov/documents/mdot/MDOT_DRB_Procedures_After10-06-2017_601636_7.pdf Dispute Review Board (DRB) Operating Procedures (effective for all projects let on and after October 6, 2017)]
 
  
NOTE: For projects let before October 6, 2017 please reference the applicable DRB procedures linked below.
+
The ProjectWise folder includes the current MDOT DRB Procedures, DRB Agreement, Special Provision, and the approved DRB candidate list. It also contains individual folders for each DRB candidate used to store and update their DRB application and resume. All ProjectWise users have access to these documents to assist in the selection, review, and approval of potential DRB panel members.
  
[http://www.michigan.gov/documents/mdot/MDOT_DRB_Procedures_Revised_11162015_505977_7.pdf Dispute Review Board (DRB) Operating Procedures (effictive for all projects let on and March 4, 2016 through and including September 6, 2017)].
 
  
[http://www.michigan.gov/documents/mdot/MDOT_DRB_Procedures_After090415_494187_7.pdf Dispute Review Board (DRB) Operating Procedures (effective for projects let on September 4, 2015, through and including March 3, 2016]
+
Please reference the [https://www.michigan.gov/mdot/business/construction/dispute-review-board MDOT - Dispute Review Board (DRB)] website for the current procedures and other DRB information.
  
[http://www.michigan.gov/documents/mdot/MDOT_DRB_Procedures_399279_7.pdf Dispute Review Board (DRB) Operating Procedures (effective for all projects let before September 4, 2015)]
 
  
 
{{top}}
 
{{top}}
Line 19: Line 15:
 
==[[#Dispute Review Board Process Flowchart|Dispute Review Board Process Flowchart]]==
 
==[[#Dispute Review Board Process Flowchart|Dispute Review Board Process Flowchart]]==
  
[[File:DRB Flowchart FINAL (November 2015).pdf|500px|thumbnail|center|DRB Process Flowchart]]
+
[[File:DRB Flowchart July 2022.jpg|thumb|center|700px|link=//{{SERVERNAME}}/images_construction/7/7c/DRB_Flowchart_July_2022.pdf|DRB Process Flowchart]]
 +
 
 
<div style="text-align: right;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)_Procedures Email this Page]</div>
 
<div style="text-align: right;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)_Procedures Email this Page]</div>
 
{{top}}
 
{{top}}
  
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]
[[Category: Division 1 Supplemental]]
+
[[Category:Division 1]]
 +
[[Category:Division 1 Supplemental]]

Latest revision as of 15:56, 11 July 2022

Email this Page

Dispute Review Board (DRB)

The Dispute Review Board (DRB) process is used on projects that have incorporated the Special Provision for Dispute Review Board. The DRB Procedures describe the MDOT procedures for submittal and review of Contractor claims using a Dispute Review Board (DRB). For more information, please refer to the Dispute Review Board folder in ProjectWise. It is located under the following path: MDOTProjectWise\Documents\External Partnerships\Dispute Review Board (DRB).


The ProjectWise folder includes the current MDOT DRB Procedures, DRB Agreement, Special Provision, and the approved DRB candidate list. It also contains individual folders for each DRB candidate used to store and update their DRB application and resume. All ProjectWise users have access to these documents to assist in the selection, review, and approval of potential DRB panel members.


Please reference the MDOT - Dispute Review Board (DRB) website for the current procedures and other DRB information.


[top of page]


Dispute Review Board Process Flowchart

DRB Process Flowchart
Email this Page

[top of page]