Difference between revisions of "Frequently Searched Items"
Jump to navigation
Jump to search
JohnsonN23 (talk | contribs) m |
m (Added Link for Final Project Review Procedures) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 8: | Line 8: | ||
:[http://mdotcf.state.mi.us/public/tands/plans.cfm MMUTCD chapter 6] | :[http://mdotcf.state.mi.us/public/tands/plans.cfm MMUTCD chapter 6] | ||
:[http://www.michigan.gov/mdot/0,4616,7-151-12965_14036---F,00.html Traffic Sign Details] | :[http://www.michigan.gov/mdot/0,4616,7-151-12965_14036---F,00.html Traffic Sign Details] | ||
− | :[ | + | :[https://mdotjboss.state.mi.us/BidLetting/BidLettingHome.htm E proposal to find plans, proposals for jobs that are let] |
:[http://mdotjboss.state.mi.us/BidLetting/BidLettingHome.htm Bid tabs from lettings] | :[http://mdotjboss.state.mi.us/BidLetting/BidLettingHome.htm Bid tabs from lettings] | ||
:[http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367_68095---,00.html Material source guide] | :[http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367_68095---,00.html Material source guide] | ||
Line 14: | Line 14: | ||
:[http://mdotwiki.state.mi.us/construction/index.php/105.10_Source_of_Steel_and_Iron Formerly Buy America BOHIM] | :[http://mdotwiki.state.mi.us/construction/index.php/105.10_Source_of_Steel_and_Iron Formerly Buy America BOHIM] | ||
:[http://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))] | :[http://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))] | ||
− | :[ | + | :[//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf Documentation Guide] |
:[http://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders Contractor Performance Evaluations procedures (MDOT Wiki)] | :[http://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders Contractor Performance Evaluations procedures (MDOT Wiki)] | ||
:[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage] | :[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage] | ||
:[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates] | :[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates] | ||
+ | :[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#e-Final_Project_Review_Procedures Final Project Review Procedures] |
Revision as of 17:31, 19 December 2019
- Contract Modification and FHWA limits (formerly FHWA BOHIM)
- Mdot forms search
- MDOT Average unit prices
- MDOT Design Estimating Average Unit Price
- Construction Contractor Inquiries for letting dates, item numbers, status
- Frequently used special provisions
- MDOT Standard plans
- MMUTCD chapter 6
- Traffic Sign Details
- E proposal to find plans, proposals for jobs that are let
- Bid tabs from lettings
- Material source guide
- Check for latest MDOT Form updates
- Formerly Buy America BOHIM
- HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))
- Documentation Guide
- Contractor Performance Evaluations procedures (MDOT Wiki)
- Prevailing Wage
- Final Estimates
- Final Project Review Procedures