Difference between revisions of "Frequently Searched Items"
Jump to navigation
Jump to search
m (Updated link for Minimum Documentation Guide) |
m (Added Link for Final Project Review Procedures) |
||
Line 18: | Line 18: | ||
:[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage] | :[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures Prevailing Wage] | ||
:[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates] | :[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates Final Estimates] | ||
+ | :[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#e-Final_Project_Review_Procedures Final Project Review Procedures] |
Revision as of 17:31, 19 December 2019
- Contract Modification and FHWA limits (formerly FHWA BOHIM)
- Mdot forms search
- MDOT Average unit prices
- MDOT Design Estimating Average Unit Price
- Construction Contractor Inquiries for letting dates, item numbers, status
- Frequently used special provisions
- MDOT Standard plans
- MMUTCD chapter 6
- Traffic Sign Details
- E proposal to find plans, proposals for jobs that are let
- Bid tabs from lettings
- Material source guide
- Check for latest MDOT Form updates
- Formerly Buy America BOHIM
- HMA Inspector’s Daily report requirements - (Formerly CA (2006-07))
- Documentation Guide
- Contractor Performance Evaluations procedures (MDOT Wiki)
- Prevailing Wage
- Final Estimates
- Final Project Review Procedures