Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
m
(→‎Recent Minor Changes: Added 102.02 change for lead times of Delineator and 3# U-Channel Posts)
(282 intermediate revisions by 5 users not shown)
Line 2: Line 2:
  
  
<center><span STYLE="font: 40pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
+
<center><span STYLE="font: 25pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
  
  
<center>[[File:logo.jpg|400px]]</center>
+
<center>[[File:logo.jpg|250px]]</center>
  
  
  
<center><span STYLE="font: 30pt arial;">'''Bureau of Field Services'''</span></center>
+
<center><span STYLE="font: 20pt arial;">'''Bureau of Field Services'''</span></center>
  
<center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center>
+
<center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center>
  
[[File:DI-05222-017.jpg|800px|thumb|center|I-96. Cascade Rd. Diverging Diamond Interchange project in Grand Rapids, Kent County.]]
+
<span style="float: right;">
 +
<center><span style="float: right;">[[File:DI-06801-092.jpg|450px|thumb|right|Box culvert construction on M-10 in Clare County.]]</span></center>
 +
</span>
  
[[File:DI-05650-060.jpg|300px|thumb|Construciton on Bridge decks on the Square Lake Rd. Interchange project.]]
+
=[[#MDOT Mission Statement|MDOT Mission Statement]]=
 
 
[[File:DI-05649-050.jpg|300px|thumb|Construction work on the M-1 Rail Woodward Ave.]]
 
 
 
==[[#Foreword|Foreword]]==
 
 
 
This manual has been prepared to give information and guidance to construction project personnel associated with the Michigan Department of Transportation (MDOT).  It is not a part of any contract and therefore is not binding on the contractor.  In case of conflict between the Standard Specifications for Construction or contract documents and this manual, the specifications and contract documents will have precedence.
 
 
 
 
 
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
 
 
 
 
 
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [[Help:Contents]] page.
 
 
 
 
 
Since it's release in April of 2014 there are a total of {{NUMBEROFUSERS}} registered users of the MDOT Construction Manual.
 
 
 
{{top}}
 
 
 
===[[#MDOT Mission Statement|MDOT Mission Statement]]===
 
 
Providing the highest quality integrated transportation services for economic benefit and improved quality of life.
 
Providing the highest quality integrated transportation services for economic benefit and improved quality of life.
  
{{top}}
 
 
== General Information ==
 
===[[#Current News|Current News]]===
 
With the first release of the MDOT Wiki Construction Manual there are bound to be some errors.  If you find an error on a page please contact the Content Manager for that particular Division located [[Help:Contents#Content_Suggestions|here]] in the [[Help:Contents|Help page]].  Some sections are still undergoing content revisions, most have been identified by the Content Managers and are noted as such in the Wiki Constrution Manual.
 
  
 +
=[[Current News|<font color="red">Current News</font>]]=
  
Content will be revised frequently and a way to monitor what changes have occured recently is by using the [[Special:RecentChanges|Recent changes]] page. This page will show all major and minor edits along with new users that were created. Pretty much everything that goes on in the Construction Manual. For a more specific listing of content changes you will want to see the [[Main_Page#Recent_Major_Changes|Recent Major Changes]] page or [[Main_Page#Recent_Minor_Changes|Recent Minor Changes]] page which contain manually updated lists of content changes for specific sections of the Construction Manual.
+
==[[#New FieldManager Helpdesk Number|New FieldManager Helpdesk Number]]==
 +
The FieldManager Helpdesk activated its new phone number, '''1-844-4MI-MDOT''' (1-844-464-6368). On the new phone menu, you can reach the FieldManager Helpdesk by selecting option 2 for AASHTOWare and then option 3 for FieldManager. The old number was deactivated on May 1st. The new number is part of the new unified help desk solution, MI MDOT Software Support, used to track and resolve software related issues from customers.
 +
[[File:MI MDOT Software Support.png|center|200px]]
  
 
{{top}}
 
{{top}}
  
====[[#Recent Major Changes|'''Recent Major Changes''']]====
+
==[[#Recent Major Changes|Recent Major Changes]]==
 
 
 
The table below is a list of Major changes.   
 
The table below is a list of Major changes.   
<div style="overflow:auto; height:200px; width:915px">
+
<div style="overflow:auto; height:200px; width:700px">
 
{| class="wikitable" style="background:orange; color:black"
 
{| class="wikitable" style="background:orange; color:black"
 +
!Updated!! Division !! Section !! Summary !! What Changed
 +
|-
 +
|<center>1/4/2022</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Acceptance_of_Work|109.07]]</center>||Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6483&oldid=6380 Compare Here]
 +
|-
 +
|<center>12/21/2021</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Updated contents of entire section 107.09 Archeological and Historical Findings||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=6466&oldid=5618 Compare Here]
 +
|-
 +
|<center>11/23/2021</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan|208]]</center>||Created new subsection "Sediment Discharge into Waters of the State of Michigan"||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan View Here]
 +
|-
 +
|<center>11/17/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Design_Errors|103.02]]</center>||Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6440&oldid=6436 Compare Here]
 +
|-
 +
|<center>10/27/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#top|103.02]]</center>||Updated content in Section 103.02 Construction Contract Modification Process Overview||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6436&oldid=6403 Compare Here]
 
|-
 
|-
!Updated!! Division !! Section !! Summary !! What Changed
+
|<center>10/18/2021</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY 2022||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here]
 +
|-
 +
|<center>10/7/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Construction_Contract_and_Construction_Engineering_Phase_Funding_Revisions|103.02]]</center>||Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6403&oldid=6351 Compare Here]
 +
|-
 +
|<center>9/28/2021</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work|108.01]]</center>||Updated information in section 108.01 Subcontracting of Contract Work||[https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&type=revision&diff=6385&oldid=6292 Compare Here]
 +
|-
 +
|<center>9/16/2021</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
 +
|-
 +
|<center>9/8/2021</center>||<center>1</center>||<center>[[108.05_Progress_Schedule|108.05]]</center>||Replaced all information for 108.05 Progress Schedule section ||[https://mdotwiki.state.mi.us/construction/index.php?title=108.05_Progress_Schedule&type=revision&diff=6369&oldid=5269 Compare Here]
 +
|-
 +
|<center>9/2/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>|| Updated Final Estimates information and replaced Figure 109-1 ||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6367&oldid=6151 Compare Here]
 +
|-
 +
|<center>9/1/2021</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Removed table and updated Standard Naming Convention Alpha/Numeric lists||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=6359&oldid=6293 Compare Here]
 +
|-
 +
|<center>8/25/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Requirements_for_FHWA_Review_on_Projects_of_Division_Interest_.28PoDI.29|103.02]]</center>||Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6351&oldid=6350 Compare Here]
 +
|-
 +
|<center>8/3/2021</center>||<center>1</center>||<center>[[Structural_Fabrication_Quality_Manual|105 Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual page.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=6347&oldid=6006 Compare Here]
 
|-
 
|-
|<center>4/25/2017</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Progress_Clause| 102.02]]</center>||Update according to CA 2015-11 with Boiler progress update.||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal&diff=4631&oldid=4454 Compare It]
+
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated Boilerplate Progress Clause Template document link (revision June 2021)||[https://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause View Here]
 
|-
 
|-
|<center>4/24/2017</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs#Engineer_Certification_Program| Engineer Certification]]</center>||Updated Engineer Certification List||[https://mdotwiki.state.mi.us/construction/images/e/e7/Eng_Record_Cert_list_04-13-17.pdf Linked Here]
+
|<center>6/16/2021</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105]]</center>||Added 2021 MQAP content||[https://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2021_Summary_of_Revisions_to_the_MQAP View Here]
 
|-
 
|-
|<center>4/21/2017</center>||<center>1</center>||<center>[[Contract_Administration_and_Oversight_Guidelines_for_Projects_Containing_Warranty_Work|Contract Admin]]</center>||Added content according to CA 2015-13||[https://mdotwiki.state.mi.us/construction/index.php?title=Contract_Administration_and_Oversight_Guidelines_for_Projects_Containing_Warranty_Work&diff=4616&oldid=4544 Compare It]
+
|<center>6/8/2021</center>||<center>1</center>||<center>[[107.01_Laws_to_be_Observed|107.01]]</center>||Created Section 107.01 Laws to be Observed||[https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed View Here]
 
|-
 
|-
|<center>4/19/2017</center>||<center>2</center>||<center>[[205_-_Roadway_Earthwork#Cost_Over_Runs_From_Off_Site_Disposal_of_Soil|205]]</center>||Added content in accordance with CA 2008-01||[http://mdotwiki.state.mi.us/construction/index.php?title=205_-_Roadway_Earthwork&diff=4609&oldid=4268 Compare It]
+
|<center>5/11/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process#Office_Technician_Certification_Requirements|Certified Office Technician Process]]</center>||Clarification of Prerequisites for Office Tech Certification||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&type=revision&diff=6216&oldid=6167 Compare Here]
 
|-
 
|-
|<center>4/19/2017</center>||<center>1</center>||<center>[[104.07_Contractor_Obligations#Project_.26_Worksite_Safety|104.07]]</center>||Added Content according to CA 2013-12, Workers Safety||[https://mdotwiki.state.mi.us/construction/index.php?title=104.07_Contractor_Obligations&diff=4605&oldid=4570 Compare It]
+
|<center>4/19/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>||Updated Final Estimates information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6151&oldid=5946 Compare Here]
 
|-
 
|-
|<center>4/19/2017</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Force Account Work|109.05]]</center>||Made adjustments to implement form 1101-SP109||[https://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=4603&oldid=4588 Compare It]
+
|<center>3/15/2021</center>||<center>1</center>||<center>[[Digital_Calculations_for_Payment|104]]</center>||Created new Digital Calculations for Payment section under Division 1, Section 104||[https://mdotwiki.state.mi.us/construction/index.php/Digital_Calculations_for_Payment View Here]
 
|-
 
|-
|<center>4/5/2017</center>||<center>1</center>||<center>[[107_-_Legal_Relations_and_Responsibility_to_the_Public#Prevailing_Wage_Classifications|107]]</center>||Added Section for Prevailing Wage Classification from CA 2007-15||[https://mdotwiki.state.mi.us/construction/index.php?title=107_-_Legal_Relations_and_Responsibility_to_the_Public&diff=4431&oldid=4254 Compare It]
+
|<center>2/9/2021</center>||<center>7</center>||<center>[[712_-_Bridge_Rehabilitation,_Concrete#Hydrodemolition|712]]</center>||Added the Site Activation/Deactivation information||[http://mdotwiki.state.mi.us/construction/index.php?title=712_-_Bridge_Rehabilitation%2C_Concrete&diff=6115&oldid=5606 Compare Here]
 
|-
 
|-
|<center>3/27/2017</center>||<center>1 Supplemental</center>||<center>[[Other#Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System|Other]]</center>||Added Section 11 from CA 2011-12 to CM||[http://mdotwiki.state.mi.us/construction/index.php?title=Other&diff=4405&oldid=4290 Compare It]
+
|<center>2/9/2021</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Other_Documentation|715]]</center>||Updated information under Item #6, Site Activation/Deactivation||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=6118&oldid=5598 Compare Here]
 
|-
 
|-
|<center>3/23/2017</center>||<center>1</center>||<center>[[109_-_Measurement_and_Payment#DOCUMENTING_PRICE_NEGOTIATIONS|109]]</center>||Incorporated information part of '''CA 2015-14''' for DOCUMENTING PRICE NEGOTIATIONS||[https://mdotwiki.state.mi.us/construction/index.php?title=109_-_Measurement_and_Payment&diff=4394&oldid=4317 Compare It]
 
 
|}
 
|}
 
</div>
 
</div>
Line 79: Line 85:
 
{{top}}
 
{{top}}
  
====[[#Recent Minor Changes|'''Recent Minor Changes''']]====
+
==[[#Recent Minor Changes|Recent Minor Changes]]==
 
The table below is a list of Minor changes.   
 
The table below is a list of Minor changes.   
 
+
<div style="overflow:auto; height:200px; width:700px">
 
{| class="wikitable" style="background:yellow; color:black"
 
{| class="wikitable" style="background:yellow; color:black"
 
|-
 
|-
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>4/24/2017</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Pay_Item_Selection|109.07]]</center>||Updated according CA 2015-06||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=4622&oldid=4591 Compare It]
+
|<center>1/18/2022</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6530&oldid=6485 Compare Here]
 +
|-
 +
|<center>1/5/2022</center>||<center>1</center>||<center>[[Final_Project_Review_Report|Final Project Review Report]]</center>||Updated Final Project Review Report User Guide to September 2020 version||[https://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review_Report&type=revision&diff=6488&oldid=6174 Compare Here]
 +
|-
 +
|<center>1/4/2022</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Updated/added Typical Long-Lead Items times for Guardrail-Steel||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6485&oldid=6353 Compare Here]
 +
|-
 +
|<center>1/4/2022</center>||<center>1 Supplemental</center>||<center>[[Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99|Local Agency Program]]</center>||Added Archeological and Historical Findings resource||[https://mdotwiki.state.mi.us/construction/index.php/Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99 View Here]
 +
|-
 +
|<center>12/14/2021</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Updated 2012 to 2020 Spec Book reference||[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt View Here]
 +
|-
 +
|<center>12/13/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for December 2021||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>11/17/2021</center>||<center>1</center>||<center>[[FieldManager#Bi-Annual_FieldManager_User_Account_Verification_Process|Bi-Annual FieldManager User Account Verification Process]]</center>||Updated all content.||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6438&oldid=6103 Compare Here]
 +
|-
 +
|<center>10/20/2021</center>||<center>1 Supplemental</center>||<center>[[108.01_Subcontracting_of_Contract_Work#Construction_Subcontract_Process|108.01]]</center>||Removed text about engineer's responsibility to check subcontractors are prequalified prior to start of work.||[https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&type=revision&diff=6411&oldid=6385 Compare Here]
 +
|-
 +
|<center>10/12/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Current Certified Engineers]]</center>||Updated Certified Engineer List to October 2021||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>10/5/2021</center>||<center>E-Construction</center>||<center>[[E-Construction#Accessing_MDOT.27s_DataSource|E-Construction]]</center>||Updated information for Accessing MDOT's DataSource and Resource sections||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=6392&oldid=6359 Compare Here]
 +
|-
 +
|<center>9/29/2021</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811]]</center>||Updated Permanent Pavement Markings payment table to include 2021 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here]
 +
|-
 +
|<center>9/1/2021</center>||<center>1</center>||<center>[[Preconstruction_Meeting#LAP_Project_Considerations|102 Preconstruction]]</center>||Updated Meeting Minutes with August 2021 file.||[https://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&type=revision&diff=6362&oldid=5954 Compare Here]
 +
|-
 +
|<center>8/30/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Updated 102.02 Contents of Proposal-Progress Clause, Guardrail-Steel Lead Times.||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6353&oldid=6297 Compare Here]
 +
|-
 +
|<center>7/26/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Current Certified Engineers]]</center>||Added July 2021 Engineer Certification List.||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&type=revision&diff=6344&oldid=6342 Compare Here]
 +
|-
 +
|<center>7/26/2021</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt#Yield|501]]</center>||Minor Update to correct yield calculation example.||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=6336&oldid=6206 Compare Here]
 +
|-
 +
|<center>7/20/2021</center>||<center>103.02</center>||<center>[[103.02_Contract_Revisions#Revisions_to_the_Contract|103.02]]</center>||Minor text edits of 103.02 Revisions to the Contract and 2012 to 2020 Spec Book Reference updates.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6333&oldid=6332 Compare Here]
 +
|-
 +
|<center>7/14/2021</center>||<center>109.05C</center>||<center>[[109.05_Payment_for_Contract_Revisions#Negotiated_Prices_.28109.05.C.29|109.05C]]</center>||Updated information/language.||[https://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&type=revision&diff=6330&oldid=6317 Compare Here]
 +
|-
 +
|<center>7/13/2021</center>||<center>1</center>||<center>[[Prevailing_Wage|Prevailing Wage]]</center>||Created a new section Prevailing Wage and relocated information here from 107.01 Laws to be Observed.||[https://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage View Here]
 +
|-
 +
|<center>7/13/2021</center>||<center>1</center>||<center>[[107.01_Laws_to_be_Observed|107.01 Laws to be Observed]]</center>||Moved Prevailing Wage information to a new page.||[https://mdotwiki.state.mi.us/construction/index.php?title=107.01_Laws_to_be_Observed&type=revision&diff=6323&oldid=6277 Compare Here]
 +
|-
 +
|<center>7/13/2021</center>||<center>1</center>||<center>[[Force_Account_Work|Force Account Work]]</center>||Created a new section Force Account Work, which cross-references with Section 109.05 Payment for Contract Revisions.||[https://mdotwiki.state.mi.us/construction/index.php/Force_Account_Work View Here]
 +
|-
 +
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_.28DRB.29|Dispute Review Board (DRB)]]</center>||Made some text edits and added link to DRB webpage.||[https://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&type=revision&diff=6301&oldid=6169 Compare Here]
 
|-
 
|-
|<center>4/24/2017</center>||<center>1</center>||<center>[[Disadvantaged_Business_Enterprises_(DBE)#Disadvantages_Business_Enterprises_.28DBE.29|Disadvantaged Business]]</center>||Updated content according CA 2014-13||[https://mdotwiki.state.mi.us/construction/index.php?title=Disadvantaged_Business_Enterprises_%28DBE%29&diff=4620&oldid=4571 Compare It]
+
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#MDOT_Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Certified Engineer Process section content||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&type=revision&diff=6288&oldid=6280 Compare Here]
 
|-
 
|-
|<center>4/21/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency#PROJECT_ADMINISTRATION_MDOT-LET_LOCAL_AGENCY_PROJECTS|Local Agency]]</center>||Updated content according to CA 2009-16||[https://mdotwiki.state.mi.us/construction/index.php?title=Local_Agency&diff=4618&oldid=4574 Compare It]
+
|<center>6/8/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations|102.02]]</center>||Updated Progress Clause Template for LAP Projects (May 2021) document||[https://mdotwiki.state.mi.us/images_construction/4/49/Progress_Clause_Template_LAP_projects_2020_Specs_FINAL_05192021_726007_7.pdf View Here]
 
|-
 
|-
|<center>4/20/2017</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Updated content from CA 2006-07||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&diff=4614&oldid=4250 Compare It]
+
|<center>6/8/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Current Certified Engineers]]</center>||Updated certified engineer list to June 2021||[https://mdotwiki.state.mi.us/images_construction/1/11/Engineer_certification_list_-_JUNE_2021.pdf View Here]
 
|-
 
|-
|<center>4/20/2017</center>||<center>5</center>||<center>[[502_-_HMA_Crack_Treatment#GENERAL|502]]</center>||Added update from CA 2009-03 to CM||[https://mdotwiki.state.mi.us/construction/index.php?title=502_-_HMA_Crack_Treatment&diff=4611&oldid=3361 Compare It]
+
|<center>5/24/2021</center>||<center>1 Supplemental</center>||<center>[[E-Signature|E-Signature]]</center>||Edited FHWA Electronic Signature information.||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6262&oldid=6260 Compare Here]
 
|-
 
|-
|<center>4/19/2017</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs#Review_Procedure|Cert Programs]]</center>||Added text from CA 2014-03||[http://mdotwiki.state.mi.us/construction/index.php?title=Certification_Programs&diff=4607&oldid=4311 Compare It]
+
|<center>5/20/2021</center>||<center>1 Supplemental</center>||<center>[[E-Signature|E-Signature]]</center>||Added E-Signature Guidance for FHWA staff as non-MDOT users.||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6260&oldid=6171 Compare Here]
|-  
 
|<center>4/5/2017</center>||<center>6</center>||<center>[[603_-_Concrete_Pavement_Restoration#Removing Old Concrete|603]]</center>||Added text update from CA 2013-09||[https://mdotwiki.state.mi.us/construction/index.php?title=603_-_Concrete_Pavement_Restoration&diff=4429&oldid=4017 Compare It]
 
 
|-
 
|-
|<center>3/28/2017</center>||<center>1</center>||<center>[[109_-_Measurement_and_Payment#Final Marked Plans|109]]</center>||Added links from CA 2009-20||[http://mdotwiki.state.mi.us/construction/index.php?title=109_-_Measurement_and_Payment&diff=4414&oldid=4401 Compare It]
+
|<center>4/28/2021</center>||<center>1 Supplemental</center>||<center>[[Local_Agency_Program_(LAP)#Local_Agency_Program_Assistance.2FResources|Local Agency Program]]</center>||Updated FieldManager contact info (web address and e-mail).||[https://mdotwiki.state.mi.us/construction/index.php?title=Local_Agency_Program_%28LAP%29&type=revision&diff=6153&oldid=5987 Compare Here]
 
|-
 
|-
|<center>3/27/2017</center>||<center>1</center>||<center>[[109_-_Measurement_and_Payment#DOCUMENTING_PRICE_NEGOTIATIONS|109]]</center>||Updated reference to CFR and included link||[https://mdotwiki.state.mi.us/construction/index.php?title=109_-_Measurement_and_Payment&diff=4398&oldid=4397 Compare It]
+
|<center>3/17/2021</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Material_Documentation|811]]</center>||Updated information on the Permanent Pavement Markings, Material Documentation section.||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6141&oldid=6047 Compare Here]
 
|-
 
|-
|<center>3/27/2017</center>||<center>1</center>||<center>[[102_-_Bid_Submission,_Award,_and_Execution_of_Contract#Contractor Furnished Detailed Progress Schedule, Form 1130|102]]</center>||Updated Section according to CA 2012-09 to CM||[https://mdotwiki.state.mi.us/construction/index.php?title=102_-_Bid_Submission%2C_Award%2C_and_Execution_of_Contract&diff=4402&oldid=4201 Compare It]
+
|<center>3/3/2021</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Contractor_Obligation|208]]</center>||Revised to add requirement to notify CFS resource specialist when Form 1568 for Project Staging or Excess Material Location on MDOT ROW is approved||[https://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&type=revision&diff=6130&oldid=5694 Compare Here]
 +
|-
 +
|<center>2/8/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated the Certified Engineer List as of February 2021.||[http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>2/2/2021</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General|104.10]]</center>||Updated the MDOT Claims Procedure with a revised version.||[http://mdotwiki.state.mi.us/construction/index.php?title=104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension&diff=6107&oldid=5896 Compare Here]
 +
|-
 +
|<center>1/6/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Replace the two current subsections; Determination of Work Days and Critical Path Networks, with single section titled [[102.02_Contents_of_Proposal_-_Progress_Clause#Contract_Time_Determination_.28CTD.29|“Contract Time Determination”]]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=6096&oldid=6094 Compare Here]
 +
|-
 +
|<center>1/5/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Added Controller Cabinet and Detection Equipment to Typical Long-Lead Items Table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=6094&oldid=6045 Compare Here]
 +
|-
 +
|<center>1/5/2021</center>||<center>4</center>||<center>[[402_-_Storm_Sewers#Illicit_Connections|402]]</center>||Update related to Illicit Connections||[http://mdotwiki.state.mi.us/construction/index.php?title=402_-_Storm_Sewers&diff=6092&oldid=6020 Compare Here]
 +
|-
 +
|<center>11/30/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Inspector.27s_Daily_Report_.28IDR.29|Inspector's Daily Report]]</center>||Updated instructions||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=6084&oldid=6043 Compare Here]
 +
|-
 +
|<center>10/29/2020</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes. Also included updated [//{{SERVERNAME}}/images_construction/0/08/Standard_Naming_Convention_Revised_10-29-2020.pdf PDF] and [//{{SERVERNAME}}/images_construction/8/8a/Standard_Naming_Convention_Revised_10-29-2020.xlsx XLSX] files (Rev 10-29-20)||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=6063&oldid=6058 Compare It]
 +
|-
 +
|<center>9/24/2020</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811]]</center>||Updated Permanent Pavement Markings payment table to include 2020 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here]
 +
|-
 +
|<center>9/24/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Added Guardrail-Steel to the Long-Lead item table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=6045&oldid=5947 Compare Here]
 +
|-
 +
|<center>9/15/2020</center>||<center>Disadvantaged Business Enterprises (DBE)</center>||<center>[[Disadvantaged_Business_Enterprises_(DBE)#Title_VI_Coordinator|Disadvantaged Business Enterprises (DBE)]]</center>||Updated contact information for MDOT's Title VI Coordinator to [mailto:CurryO@michigan.gov Orlando Curry]  517-241-7462||[http://mdotwiki.state.mi.us/construction/index.php?title=Disadvantaged_Business_Enterprises_%28DBE%29&diff=6034&oldid=5825 View Here]
 +
|-
 +
|<center>8/11/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Record Certification List with added Consultants||[http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager#LAP_Project_Considerations|FieldManager]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/FieldManager#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations|Plans, Proposal, Input, Review and Evaluation]]</center>||Added 'LAP Project Considerations' to the section under Design/Construction Package Evaluation||[http://mdotwiki.state.mi.us/construction/index.php/Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations_2|Plans, Proposal, Input, Review and Evaluation]]</center>||Added 'LAP Project Considerations' to the section under Post-Construction Reviews||[http://mdotwiki.state.mi.us/construction/index.php/Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations_2 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[Preconstruction_Meeting#LAP_Project_Considerations|102]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[102.01_Prequalification_of_Bidders#LAP_Project_Considerations|102.01]]</center>||Added 'LAP Project Considerations' to the section under Processing of Contractor Performance Evaluations||[http://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations|102.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[Extending_Project_Limits#LAP_Project_Considerations|103]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Extending_Project_Limits#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#LAP_Project_Considerations|103.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#LAP_Project_Considerations|103.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#LAP_Project_Considerations|104.10]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[108.07_Extension_of_Time_on_Work_Day_Contracts|108.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/108.07_Extension_of_Time_on_Work_Day_Contracts View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[Project_Delays_Due_to_a_Utility_Company#LAP_Project_Considerations|108]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Project_Delays_Due_to_a_Utility_Company#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Acceptance of work||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_2|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Pay Estimate and Inactive Project Notification||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_2 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_3|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Estimates||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_3 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_4|109.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_4 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_5|109.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_5 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_6|109.07]]</center>||Added 'LAP Project Considerations' to the section under Required Signature on Construction Pay Estimates||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_6 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[E-Construction#LAP_Project_Considerations|e-Construction]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/E-Construction#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>7/27/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Updated MDOT Production Rates link. Old link did not work properly.||[http://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Construction_Time_Estimates_-_Production_Rates View Here]
 +
|-
 +
|<center>7/22/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager|FieldManager]]</center>||Updated Content for Showing Detail Calculations on Inspector’s Daily Report and Added Rounding Convention Example||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5938&oldid=5875 Compare Here]
 +
|-
 +
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[FPR_Frequently_Asked_Questions#How_is_the_Final_Project_Review_Report_updated.3F|FPR Frequently Asked Questions]]</center>||Added FPR Report User Guide link to FPR FAQ page||[http://mdotwiki.state.mi.us/construction/index.php?title=FPR_Frequently_Asked_Questions&diff=5868&oldid=5867 Compare Here]
 +
|-
 +
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Added FAQs link for Final Project Review to page||[http://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review&diff=5859&oldid=5849 Compare Here]
 +
|-
 +
|<center>6/24/2020</center>||<center>1 Supplemental</center>||<center>[[Project_Closeout_Escalation_of_Accountability|Project Closeout Escalation of Accountability]]</center>||Added links to the new Final Project Review Report page||[http://mdotwiki.state.mi.us/construction/index.php?title=Project_Closeout_Escalation_of_Accountability&diff=5845&oldid=5815 Compare Here]
 +
|-
 +
|<center>6/17/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Reformatted the Certified Engineer Renewal Process for clarity||[http://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&diff=5841&oldid=5840 Compare Here]
 +
|-
 +
|<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Updated Final Project Review page with Interim File Review link||[http://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review&diff=5831&oldid=5813 Compare Here]
 +
|-
 +
|<center>06/01/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/e/e7/Eng_Record_Cert_list_06-01-2020.pdf View Here]
 +
|-
 +
|<center>5/1/2020</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)| Dispute Review Board (DRB)]]</center>||Added updated DRB Procedures to include those let on and after 6-5-2020/Removed older links||[http://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&diff=5792&oldid=5137 Compare Here]
 +
|-
 +
|<center>4/30/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process| Certified Office Technician Process]]</center>||Edited page to reflect only Certified Technician Process information||[http://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&diff=5787&oldid=5720 Compare Here]
 +
|-
 +
|<center>4/29/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Non-Payment_Claims| 109.07]]</center>||Removed "Review of Prompt Payment Complaints" section as it's now its own page||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5776&oldid=5730 Compare Here]
 +
|-
 +
|<center>4/27/2020</center>||<center>1</center>||<center>[[101.04_-_Inspector%27s_Daily_Reports|101.04 Inspector Daily Reports]]<hr>[[FieldManager|FieldManager]]</center>||Updated Helpdesk number from 517-322-1556 to '''1-844-4MI-MDOT''' (1-844-464-6368) in these sections along with the Main page [http://mdotwiki.state.mi.us/construction/index.php/Main_Page#New_FieldManager_Helpdesk_Number Current News] area above
 +
||[http://mdotwiki.state.mi.us/construction/index.php?title=101.04_-_Inspector%27s_Daily_Reports&diff=5765&oldid=1534 Compare Here]<hr>[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5764&oldid=5713 Compare Here]
 +
|-
 +
|<center>4/22/2020</center>||<center>1</center>||<center>[[102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#Prompt_Payment| 102.18]]</center>||Added the newly created Prompt Payment link to Section 102.18||[http://mdotwiki.state.mi.us/construction/index.php?title=102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_%28DBEs%29&diff=5757&oldid=5164 Compare Here]
 +
|-
 +
|<center>4/15/2020</center>||<center>1</center>||<center>[[105.01_Quality_and_Scope_of_Supply| 105.01]]</center>||Changed Density Control Manual to Density Testing and Inspection Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=105.01_Quality_and_Scope_of_Supply&diff=5747&oldid=5745 Compare Here]
 +
|-
 +
|<center>4/14/2020</center>||<center>1</center>||<center>[[105.01_Quality_and_Scope_of_Supply| 105.01]]</center>||Changed Density Control Handbook to Density Control Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=105.01_Quality_and_Scope_of_Supply&diff=5745&oldid=4928 Compare Here]
 +
|-
 +
|<center>3/30/2020</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING| 107]]</center>||Updated Jobsite Poster||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING View Here]
 +
|-
 +
|<center>3/20/2020</center>||<center>1</center>||<center>[[Process_for_Documenting_Certified_Materials_in_FieldManager| 105]]</center>||Deleted information no longer applicable, or is covered in other documents/Renamed section due to changes||[http://mdotwiki.state.mi.us/construction/index.php?title=Process_for_Documenting_Certified_Materials_in_FieldManager&diff=5737&oldid=4931 Compare It]
 +
|-
 +
|<center>3/18/2020</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work| 108.01]]</center>||Updated links to the new 1302-Fed form.||[http://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&diff=5734&oldid=4975 Compare Here]
 +
|-
 +
|<center>2/21/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#General_Contract_Modification_Information| 103.02]]</center>||General Contract Modification Information Format Revision||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5728&oldid=5714 Compare It]
 +
|-
 +
|<center>2/13/2020</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes. Also included updated [//{{SERVERNAME}}/images_construction/d/d5/Standard_Naming_Convention_Revised_2-13-20.pdf PDF] and [//{{SERVERNAME}}/images_construction/a/a1/Standard_Naming_Convention_Revised_2-13-20.xlsx XLSX] files (Rev 2-13-20)||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=5726&oldid=5576 Compare It]
 +
|-
 +
|<center>02/13/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/7/7a/Eng_Record_Cert_list_02-13-2020.pdf View Here]
 +
|-
 +
|<center>01/22/2020</center>||<center>Prevailing Wage Oversight Procedures</center>||<center>[[Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING| Jobsite Posting]]</center>||Updated contact information on the Title VI Poster and Coordinator site information||[http://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage_Oversight_Procedures&diff=5703&oldid=5036 Compare It]
 +
|-
 +
|<center>11/12/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Notification_2| 208]]</center>||Soil Erosion and Sedimentation Control Notifications: Updated Notice of Coverage (NOC) and Notice of Termination (NOT) charts||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5663&oldid=5586 Compare It]
 +
|-
 +
|<center>10/29/2019</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Eligibility_and_Use|Indirect Testing Charges - Eligibility and Use]]</center>||Updated first bullet information for clarity and to include examples||[http://mdotwiki.state.mi.us/construction/index.php?title=Construction_Field_Services_Indirect_Testing_Charges&diff=5659&oldid=5654 Compare It]
 +
|-
 +
|<center>10/28/2019</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/4/45/Eng_Record_Cert_list_10-23-19.pdf View Here]
 +
|-
 +
|<center>10/3/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Pavement_Marking_Turn_Arrows|811]]</center>||Removal of references to outdated paint marking turn arrows||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5647&oldid=5640 Compare It]
 +
|-
 +
|<center>8/22/2019</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Update related to the process for archeological findings||[http://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&diff=5618&oldid=4933 Compare It]
 +
|-
 +
|<center>7/11/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)"||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5586&oldid=5241 Compare It]
 
|-
 
|-
|<center>3/27/2017</center>||<center>1</center>||<center>[[103_-_Scope_of_Work#Contract Modification Item Type|103]]||Updated Section according to CA 2011-01 to CM||[http://mdotwiki.state.mi.us/construction/index.php?title=103_-_Scope_of_Work&diff=4408&oldid=4297 Compare It]
 
 
|}
 
|}
 +
</div>
  
 
{{top}}
 
{{top}}
  
====[[#Helpful Links|Helpful Links]]====
+
=[[#Preamble|Preamble]]=
[https://mdotwiki.state.mi.us/construction/index.php/Frequently_Searched_Items Frequently Searched Items]
+
 
[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Table of Contents Division 1]
+
This manual provides guidance to administrative, engineering, and technical staff.  Engineering practice requires that professionals use a combination of technical skills and judgment in decision making.  Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare.  This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed.  It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise.  MDOT Leadership is committed to a culture of innovation to optimize engineering solutions.
 +
The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons.  Those canons are provided below.
 +
Engineers, in the fulfillment of their professional duties, shall:
 +
::#Hold paramount the safety, health, and welfare of the public.
 +
::#Perform Services only in areas of their competence.
 +
::#Issue public statement only in an objective and truthful manner.
 +
::#Act for each employer or client as faithful agents or trustees.
 +
::#Avoid deceptive acts.
 +
::#Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.
  
 +
 +
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
 +
 +
 +
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [[Help:Contents]] page.
 +
 +
 +
{{top}}
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]

Revision as of 10:46, 18 January 2022

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

New FieldManager Helpdesk Number

The FieldManager Helpdesk activated its new phone number, 1-844-4MI-MDOT (1-844-464-6368). On the new phone menu, you can reach the FieldManager Helpdesk by selecting option 2 for AASHTOWare and then option 3 for FieldManager. The old number was deactivated on May 1st. The new number is part of the new unified help desk solution, MI MDOT Software Support, used to track and resolve software related issues from customers.

MI MDOT Software Support.png

[top of page]


Recent Major Changes

The table below is a list of Major changes.

Updated Division Section Summary What Changed
1/4/2022
1
109.07
Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment Compare Here
12/21/2021
1
107.09
Updated contents of entire section 107.09 Archeological and Historical Findings Compare Here
11/23/2021
2
208
Created new subsection "Sediment Discharge into Waters of the State of Michigan" View Here
11/17/2021
1
103.02
Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues Compare Here
10/27/2021
1
103.02
Updated content in Section 103.02 Construction Contract Modification Process Overview Compare Here
10/18/2021
1 Supplemental
Construction Field Services Indirect Testing Charges
Updated the Indirect Testing coding for FY 2022 View Here
10/7/2021
1
103.02
Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same Compare Here
9/28/2021
1
108.01
Updated information in section 108.01 Subcontracting of Contract Work Compare Here
9/16/2021
1
102
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021 View Here
9/8/2021
1
108.05
Replaced all information for 108.05 Progress Schedule section Compare Here
9/2/2021
1
109.07
Updated Final Estimates information and replaced Figure 109-1 Compare Here
9/1/2021
1 Supplemental
e-Construction
Removed table and updated Standard Naming Convention Alpha/Numeric lists Compare Here
8/25/2021
1
103.02
Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity. Compare Here
8/3/2021
1
105 Structural Fabrication Quality Manual
Updated content on Structural Fabrication Quality Manual page. Compare Here
6/16/2021
1 Supplemental
102.02
Updated Boilerplate Progress Clause Template document link (revision June 2021) View Here
6/16/2021
1
105
Added 2021 MQAP content View Here
6/8/2021
1
107.01
Created Section 107.01 Laws to be Observed View Here
5/11/2021
1 Supplemental
Certified Office Technician Process
Clarification of Prerequisites for Office Tech Certification Compare Here
4/19/2021
1
109.07
Updated Final Estimates information Compare Here
3/15/2021
1
104
Created new Digital Calculations for Payment section under Division 1, Section 104 View Here
2/9/2021
7
712
Added the Site Activation/Deactivation information Compare Here
2/9/2021
7
715
Updated information under Item #6, Site Activation/Deactivation Compare Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
1/18/2022
1 Supplemental
102.02
Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts Compare Here
1/5/2022
1
Final Project Review Report
Updated Final Project Review Report User Guide to September 2020 version Compare Here
1/4/2022
1
102.02
Updated/added Typical Long-Lead Items times for Guardrail-Steel Compare Here
1/4/2022
1 Supplemental
Local Agency Program
Added Archeological and Historical Findings resource View Here
12/14/2021
5
501
Updated 2012 to 2020 Spec Book reference View Here
12/13/2021
1 Supplemental
Certified Engineer List
Updated Certified Engineer List for December 2021 View Here
11/17/2021
1
Bi-Annual FieldManager User Account Verification Process
Updated all content. Compare Here
10/20/2021
1 Supplemental
108.01
Removed text about engineer's responsibility to check subcontractors are prequalified prior to start of work. Compare Here
10/12/2021
1 Supplemental
Current Certified Engineers
Updated Certified Engineer List to October 2021 View Here
10/5/2021
E-Construction
E-Construction
Updated information for Accessing MDOT's DataSource and Resource sections Compare Here
9/29/2021
8
811
Updated Permanent Pavement Markings payment table to include 2021 prices Compare Here
9/1/2021
1
102 Preconstruction
Updated Meeting Minutes with August 2021 file. Compare Here
8/30/2021
1
102.02
Updated 102.02 Contents of Proposal-Progress Clause, Guardrail-Steel Lead Times. Compare Here
7/26/2021
1 Supplemental
Current Certified Engineers
Added July 2021 Engineer Certification List. Compare Here
7/26/2021
5
501
Minor Update to correct yield calculation example. Compare Here
7/20/2021
103.02
103.02
Minor text edits of 103.02 Revisions to the Contract and 2012 to 2020 Spec Book Reference updates. Compare Here
7/14/2021
109.05C
109.05C
Updated information/language. Compare Here
7/13/2021
1
Prevailing Wage
Created a new section Prevailing Wage and relocated information here from 107.01 Laws to be Observed. View Here
7/13/2021
1
107.01 Laws to be Observed
Moved Prevailing Wage information to a new page. Compare Here
7/13/2021
1
Force Account Work
Created a new section Force Account Work, which cross-references with Section 109.05 Payment for Contract Revisions. View Here
6/16/2021
1 Supplemental
Dispute Review Board (DRB)
Made some text edits and added link to DRB webpage. Compare Here
6/16/2021
1 Supplemental
Certified Engineer Process
Updated Certified Engineer Process section content Compare Here
6/8/2021
1
102.02
Updated Progress Clause Template for LAP Projects (May 2021) document View Here
6/8/2021
1 Supplemental
Current Certified Engineers
Updated certified engineer list to June 2021 View Here
5/24/2021
1 Supplemental
E-Signature
Edited FHWA Electronic Signature information. Compare Here
5/20/2021
1 Supplemental
E-Signature
Added E-Signature Guidance for FHWA staff as non-MDOT users. Compare Here
4/28/2021
1 Supplemental
Local Agency Program
Updated FieldManager contact info (web address and e-mail). Compare Here
3/17/2021
8
811
Updated information on the Permanent Pavement Markings, Material Documentation section. Compare Here
3/3/2021
2
208
Revised to add requirement to notify CFS resource specialist when Form 1568 for Project Staging or Excess Material Location on MDOT ROW is approved Compare Here
2/8/2021
1 Supplemental
Certified Engineer List
Updated the Certified Engineer List as of February 2021. View Here
2/2/2021
1
104.10
Updated the MDOT Claims Procedure with a revised version. Compare Here
1/6/2021
1
102.02
Replace the two current subsections; Determination of Work Days and Critical Path Networks, with single section titled “Contract Time Determination” Compare Here
1/5/2021
1
102.02
Added Controller Cabinet and Detection Equipment to Typical Long-Lead Items Table Compare Here
1/5/2021
4
402
Update related to Illicit Connections Compare Here
11/30/2020
1 Supplemental
Inspector's Daily Report
Updated instructions Compare Here
10/29/2020
E-Construction
Standard Naming Convention for Documents
Updated Naming Convention Table to reflect recent changes. Also included updated PDF and XLSX files (Rev 10-29-20) Compare It
9/24/2020
8
811
Updated Permanent Pavement Markings payment table to include 2020 prices Compare Here
9/24/2020
1
102.02
Added Guardrail-Steel to the Long-Lead item table Compare Here
9/15/2020
Disadvantaged Business Enterprises (DBE)
Disadvantaged Business Enterprises (DBE)
Updated contact information for MDOT's Title VI Coordinator to Orlando Curry 517-241-7462 View Here
8/11/2020
1 Supplemental
Certified Engineer Process
Updated Record Certification List with added Consultants View Here
8/4/2020
1 Supplemental
FieldManager
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1 Supplemental
Plans, Proposal, Input, Review and Evaluation
Added 'LAP Project Considerations' to the section under Design/Construction Package Evaluation View Here
8/4/2020
1 Supplemental
Plans, Proposal, Input, Review and Evaluation
Added 'LAP Project Considerations' to the section under Post-Construction Reviews View Here
8/4/2020
1
102
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
102.01
Added 'LAP Project Considerations' to the section under Processing of Contractor Performance Evaluations View Here
8/4/2020
1
102.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
104.10
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
108.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
108
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Acceptance of work View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Pay Estimate and Inactive Project Notification View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Estimates View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Required Signature on Construction Pay Estimates View Here
8/4/2020
1 Supplemental
e-Construction
Added 'LAP Project Considerations' to the section View Here
7/27/2020
1
102.02
Updated MDOT Production Rates link. Old link did not work properly. View Here
7/22/2020
1 Supplemental
FieldManager
Updated Content for Showing Detail Calculations on Inspector’s Daily Report and Added Rounding Convention Example Compare Here
6/30/2020
1 Supplemental
FPR Frequently Asked Questions
Added FPR Report User Guide link to FPR FAQ page Compare Here
6/30/2020
1 Supplemental
Final Project Review
Added FAQs link for Final Project Review to page Compare Here
6/24/2020
1 Supplemental
Project Closeout Escalation of Accountability
Added links to the new Final Project Review Report page Compare Here
6/17/2020
1 Supplemental
Certified Engineer Process
Reformatted the Certified Engineer Renewal Process for clarity Compare Here
6/9/2020
1 Supplemental
Final Project Review
Updated Final Project Review page with Interim File Review link Compare Here
06/01/2020
1 Supplemental
Certification Programs
Updated Engineer Record Certification List View Here
5/1/2020
1 Supplemental
Dispute Review Board (DRB)
Added updated DRB Procedures to include those let on and after 6-5-2020/Removed older links Compare Here
4/30/2020
1 Supplemental
Certified Office Technician Process
Edited page to reflect only Certified Technician Process information Compare Here
4/29/2020
1
109.07
Removed "Review of Prompt Payment Complaints" section as it's now its own page Compare Here
4/27/2020
1
101.04 Inspector Daily Reports
FieldManager
Updated Helpdesk number from 517-322-1556 to 1-844-4MI-MDOT (1-844-464-6368) in these sections along with the Main page Current News area above Compare Here
Compare Here
4/22/2020
1
102.18
Added the newly created Prompt Payment link to Section 102.18 Compare Here
4/15/2020
1
105.01
Changed Density Control Manual to Density Testing and Inspection Manual Compare Here
4/14/2020
1
105.01
Changed Density Control Handbook to Density Control Manual Compare Here
3/30/2020
1
107
Updated Jobsite Poster View Here
3/20/2020
1
105
Deleted information no longer applicable, or is covered in other documents/Renamed section due to changes Compare It
3/18/2020
1
108.01
Updated links to the new 1302-Fed form. Compare Here
2/21/2020
1
103.02
General Contract Modification Information Format Revision Compare It
2/13/2020
E-Construction
Standard Naming Convention for Documents
Updated Naming Convention Table to reflect recent changes. Also included updated PDF and XLSX files (Rev 2-13-20) Compare It
02/13/2020
1 Supplemental
Certified Engineer Process
Updated Engineer Record Certification List View Here
01/22/2020
Prevailing Wage Oversight Procedures
Jobsite Posting
Updated contact information on the Title VI Poster and Coordinator site information Compare It
11/12/2019
2
208
Soil Erosion and Sedimentation Control Notifications: Updated Notice of Coverage (NOC) and Notice of Termination (NOT) charts Compare It
10/29/2019
1 Supplemental
Indirect Testing Charges - Eligibility and Use
Updated first bullet information for clarity and to include examples Compare It
10/28/2019
1 Supplemental
Certified Engineer Process
Updated Engineer Record Certification List View Here
10/3/2019
8
811
Removal of references to outdated paint marking turn arrows Compare It
8/22/2019
1
107.09
Update related to the process for archeological findings Compare It
7/11/2019
2
208
Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)" Compare It

[top of page]


Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.


Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the Help:Contents page.


[top of page]