Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
(→‎Recent Minor Changes: Updated Minor Change Table to Reflect Updated Engineer Record Certification List (6-17-19))
(→‎Recent Major Changes: Removing 103.02 update, needs further FHWA review and approval)
(180 intermediate revisions by 4 users not shown)
Line 23: Line 23:
 
=[[Current News|<font color="red">Current News</font>]]=
 
=[[Current News|<font color="red">Current News</font>]]=
  
==[[#Documentation Guide|Documentation Guide]]==
+
==[[#New FieldManager Helpdesk Number|New FieldManager Helpdesk Number]]==
The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content. A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.
+
The FieldManager Helpdesk activated its new phone number, '''1-844-4MI-MDOT''' (1-844-464-6368). On the new phone menu, you can reach the FieldManager Helpdesk by selecting option 2 for AASHTOWare and then option 3 for FieldManager. The old number was deactivated on May 1st. The new number is part of the new unified help desk solution, MI MDOT Software Support, used to track and resolve software related issues from customers.
 
+
[[File:MI MDOT Software Support.png|center|200px]]
[[File:Documentation Guide Final Draft 02-25-19.pdf|thumb|center|200px|link=//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf]]
 
  
 
{{top}}
 
{{top}}
Line 34: Line 33:
 
<div style="overflow:auto; height:200px; width:700px">
 
<div style="overflow:auto; height:200px; width:700px">
 
{| class="wikitable" style="background:orange; color:black"
 
{| class="wikitable" style="background:orange; color:black"
 +
!Updated!! Division !! Section !! Summary !! What Changed
 +
|-
 +
|<center>1/4/2022</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Acceptance_of_Work|109.07]]</center>||Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6483&oldid=6380 Compare Here]
 +
|-
 +
|<center>12/21/2021</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Updated contents of entire section 107.09 Archeological and Historical Findings||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=6466&oldid=5618 Compare Here]
 +
|-
 +
|<center>11/23/2021</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan|208]]</center>||Created new subsection "Sediment Discharge into Waters of the State of Michigan"||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan View Here]
 +
|-
 +
|<center>11/17/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Design_Errors|103.02]]</center>||Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6440&oldid=6436 Compare Here]
 +
|-
 +
|<center>10/27/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#top|103.02]]</center>||Updated content in Section 103.02 Construction Contract Modification Process Overview||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6436&oldid=6403 Compare Here]
 +
|-
 +
|<center>10/18/2021</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY 2022||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here]
 +
|-
 +
|<center>10/7/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Construction_Contract_and_Construction_Engineering_Phase_Funding_Revisions|103.02]]</center>||Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6403&oldid=6351 Compare Here]
 +
|-
 +
|<center>9/28/2021</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work|108.01]]</center>||Updated information in section 108.01 Subcontracting of Contract Work||[https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&type=revision&diff=6385&oldid=6292 Compare Here]
 
|-
 
|-
!Updated!! Division !! Section !! Summary !! What Changed
+
|<center>9/16/2021</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
 +
|-
 +
|<center>9/8/2021</center>||<center>1</center>||<center>[[108.05_Progress_Schedule|108.05]]</center>||Replaced all information for 108.05 Progress Schedule section ||[https://mdotwiki.state.mi.us/construction/index.php?title=108.05_Progress_Schedule&type=revision&diff=6369&oldid=5269 Compare Here]
 
|-
 
|-
|<center>5/28/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated to Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5567&oldid=5553 Compare It]
+
|<center>9/2/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>|| Updated Final Estimates information and replaced Figure 109-1 ||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6367&oldid=6151 Compare Here]
 
|-
 
|-
|<center>4/9/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|103.02]]</center>||Updates and clarifications related to [[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|Detailed Contract Modification Information]] area as well as the [[103.02_Contract_Revisions#Design_Issues.2FPremium_Costs|Design Issue/Premium Costs]] area related to Contract Revisions||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5534&oldid=5521 Compare It]
+
|<center>9/1/2021</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Removed table and updated Standard Naming Convention Alpha/Numeric lists||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=6359&oldid=6293 Compare Here]
 
|-
 
|-
|<center>3/19/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Local_Agency_Projects|103.02]]</center>||[https://www.michigan.gov/documents/mdot_federal_Guidelines_99105_7.pdf Provided link to current Local Agency Programs Section Federal Guidelines]||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5521&oldid=5256 Compare It]
+
|<center>8/25/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Requirements_for_FHWA_Review_on_Projects_of_Division_Interest_.28PoDI.29|103.02]]</center>||Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6351&oldid=6350 Compare Here]
 
|-
 
|-
|<center>3/19/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||[http://mdotwiki.state.mi.us/construction/index.php/File:LOCAL_AGENCY_Boilerplate_Preconstruction_Meeting_Minutes_-_March_2019.docx Preconstruction Meeting Minutes Boilerplate - Local Agency]||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5519&oldid=5406 Compare It]
+
|<center>8/3/2021</center>||<center>1</center>||<center>[[Structural_Fabrication_Quality_Manual|105 Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual page.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=6347&oldid=6006 Compare Here]
 
|-
 
|-
|<center>3/6/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Removed old production rate information and replaced with [http://mdotwiki.state.mi.us/construction/index.php/File:MDOT_Production_Rates_.xlsx new .xlsx file containing updated production rate information]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5510&oldid=5439 Compare It]
+
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated Boilerplate Progress Clause Template document link (revision June 2021)||[https://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause View Here]
 
|-
 
|-
|<center>2/28/2019</center>||<center>Main Page</center>||<center>Main Page</center>||New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. ||[//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf View Here]
+
|<center>6/16/2021</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105]]</center>||Added 2021 MQAP content||[https://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2021_Summary_of_Revisions_to_the_MQAP View Here]
 
|-
 
|-
|<center>1/10/2019</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension|104.10]]</center>||Updated Contractor Claims Procedure for 2019||[http://mdotwiki.state.mi.us/construction/index.php?title=File:MDOT_Construction_Contractor_Claims_Procedure_January_2019.pdf&page=1 View Here]
+
|<center>6/8/2021</center>||<center>1</center>||<center>[[107.01_Laws_to_be_Observed|107.01]]</center>||Created Section 107.01 Laws to be Observed||[https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed View Here]
 
|-
 
|-
|<center>12/12/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal|102.02]]</center>||Updated Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php/File:Boilerplate_Progress_Clause_Template_12-12-18.docx View Here]
+
|<center>5/11/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process#Office_Technician_Certification_Requirements|Certified Office Technician Process]]</center>||Clarification of Prerequisites for Office Tech Certification||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&type=revision&diff=6216&oldid=6167 Compare Here]
 
|-
 
|-
|<center>11/7/2018</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Preconstruction Meeting Minutes Boilerplate - Trunkline||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5406&oldid=5265 Compare It]
+
|<center>4/19/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>||Updated Final Estimates information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6151&oldid=5946 Compare Here]
 
|-
 
|-
|<center>10/26/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2018||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
+
|<center>3/15/2021</center>||<center>1</center>||<center>[[Digital_Calculations_for_Payment|104]]</center>||Created new Digital Calculations for Payment section under Division 1, Section 104||[https://mdotwiki.state.mi.us/construction/index.php/Digital_Calculations_for_Payment View Here]
 
|-
 
|-
|<center>9/13/2018</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|Materials Quality Assurance Procedures Manual]]</center>||2018 Summary of Revisions to the manual||[http://mdotwiki.state.mi.us/construction/index.php?title=Materials_Quality_Assurance_Procedures_Manual&diff=5394&oldid=5025 Compare It]
+
|<center>2/9/2021</center>||<center>7</center>||<center>[[712_-_Bridge_Rehabilitation,_Concrete#Hydrodemolition|712]]</center>||Added the Site Activation/Deactivation information||[http://mdotwiki.state.mi.us/construction/index.php?title=712_-_Bridge_Rehabilitation%2C_Concrete&diff=6115&oldid=5606 Compare Here]
 
|-
 
|-
|<center>6/4/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102]]</center>||Provided New Table for "Typical Long Lead Time Items" along with updating to the latest "Boilerplate Progress Clause Template 5-30-15"||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5353&oldid=5201 Compare It]
+
|<center>2/9/2021</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Other_Documentation|715]]</center>||Updated information under Item #6, Site Activation/Deactivation||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=6118&oldid=5598 Compare Here]
 
|-
 
|-
|<center>4/26/2018</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109]]</center>||Update to Purpose of Review.||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection,_Acceptance,_and_Final_Payment&diff=5280&oldid=4987 Compare It]
 
 
|}
 
|}
 
</div>
 
</div>
Line 75: Line 92:
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>6/17/2018</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/a/af/Eng_Record_Cert_list_06-17-19.pdf View Here]
+
|<center>1/18/2022</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6530&oldid=6485 Compare Here]
 +
|-
 +
|<center>1/5/2022</center>||<center>1</center>||<center>[[Final_Project_Review_Report|Final Project Review Report]]</center>||Updated Final Project Review Report User Guide to September 2020 version||[https://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review_Report&type=revision&diff=6488&oldid=6174 Compare Here]
 +
|-
 +
|<center>1/4/2022</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Updated/added Typical Long-Lead Items times for Guardrail-Steel||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6485&oldid=6353 Compare Here]
 +
|-
 +
|<center>1/4/2022</center>||<center>1 Supplemental</center>||<center>[[Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99|Local Agency Program]]</center>||Added Archeological and Historical Findings resource||[https://mdotwiki.state.mi.us/construction/index.php/Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99 View Here]
 +
|-
 +
|<center>12/14/2021</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Updated 2012 to 2020 Spec Book reference||[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt View Here]
 +
|-
 +
|<center>12/13/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for December 2021||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>11/17/2021</center>||<center>1</center>||<center>[[FieldManager#Bi-Annual_FieldManager_User_Account_Verification_Process|Bi-Annual FieldManager User Account Verification Process]]</center>||Updated all content.||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6438&oldid=6103 Compare Here]
 +
|-
 +
|<center>10/20/2021</center>||<center>1 Supplemental</center>||<center>[[108.01_Subcontracting_of_Contract_Work#Construction_Subcontract_Process|108.01]]</center>||Removed text about engineer's responsibility to check subcontractors are prequalified prior to start of work.||[https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&type=revision&diff=6411&oldid=6385 Compare Here]
 +
|-
 +
|<center>10/12/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Current Certified Engineers]]</center>||Updated Certified Engineer List to October 2021||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>10/5/2021</center>||<center>E-Construction</center>||<center>[[E-Construction#Accessing_MDOT.27s_DataSource|E-Construction]]</center>||Updated information for Accessing MDOT's DataSource and Resource sections||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=6392&oldid=6359 Compare Here]
 +
|-
 +
|<center>9/29/2021</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811]]</center>||Updated Permanent Pavement Markings payment table to include 2021 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here]
 +
|-
 +
|<center>9/1/2021</center>||<center>1</center>||<center>[[Preconstruction_Meeting#LAP_Project_Considerations|102 Preconstruction]]</center>||Updated Meeting Minutes with August 2021 file.||[https://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&type=revision&diff=6362&oldid=5954 Compare Here]
 +
|-
 +
|<center>8/30/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Updated 102.02 Contents of Proposal-Progress Clause, Guardrail-Steel Lead Times.||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6353&oldid=6297 Compare Here]
 +
|-
 +
|<center>7/26/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Current Certified Engineers]]</center>||Added July 2021 Engineer Certification List.||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&type=revision&diff=6344&oldid=6342 Compare Here]
 +
|-
 +
|<center>7/26/2021</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt#Yield|501]]</center>||Minor Update to correct yield calculation example.||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=6336&oldid=6206 Compare Here]
 +
|-
 +
|<center>7/20/2021</center>||<center>103.02</center>||<center>[[103.02_Contract_Revisions#Revisions_to_the_Contract|103.02]]</center>||Minor text edits of 103.02 Revisions to the Contract and 2012 to 2020 Spec Book Reference updates.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6333&oldid=6332 Compare Here]
 +
|-
 +
|<center>7/14/2021</center>||<center>109.05C</center>||<center>[[109.05_Payment_for_Contract_Revisions#Negotiated_Prices_.28109.05.C.29|109.05C]]</center>||Updated information/language.||[https://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&type=revision&diff=6330&oldid=6317 Compare Here]
 +
|-
 +
|<center>7/13/2021</center>||<center>1</center>||<center>[[Prevailing_Wage|Prevailing Wage]]</center>||Created a new section Prevailing Wage and relocated information here from 107.01 Laws to be Observed.||[https://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage View Here]
 +
|-
 +
|<center>7/13/2021</center>||<center>1</center>||<center>[[107.01_Laws_to_be_Observed|107.01 Laws to be Observed]]</center>||Moved Prevailing Wage information to a new page.||[https://mdotwiki.state.mi.us/construction/index.php?title=107.01_Laws_to_be_Observed&type=revision&diff=6323&oldid=6277 Compare Here]
 +
|-
 +
|<center>7/13/2021</center>||<center>1</center>||<center>[[Force_Account_Work|Force Account Work]]</center>||Created a new section Force Account Work, which cross-references with Section 109.05 Payment for Contract Revisions.||[https://mdotwiki.state.mi.us/construction/index.php/Force_Account_Work View Here]
 +
|-
 +
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_.28DRB.29|Dispute Review Board (DRB)]]</center>||Made some text edits and added link to DRB webpage.||[https://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&type=revision&diff=6301&oldid=6169 Compare Here]
 +
|-
 +
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#MDOT_Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Certified Engineer Process section content||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&type=revision&diff=6288&oldid=6280 Compare Here]
 +
|-
 +
|<center>6/8/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations|102.02]]</center>||Updated Progress Clause Template for LAP Projects (May 2021) document||[https://mdotwiki.state.mi.us/images_construction/4/49/Progress_Clause_Template_LAP_projects_2020_Specs_FINAL_05192021_726007_7.pdf View Here]
 +
|-
 +
|<center>6/8/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Current Certified Engineers]]</center>||Updated certified engineer list to June 2021||[https://mdotwiki.state.mi.us/images_construction/1/11/Engineer_certification_list_-_JUNE_2021.pdf View Here]
 +
|-
 +
|<center>5/24/2021</center>||<center>1 Supplemental</center>||<center>[[E-Signature|E-Signature]]</center>||Edited FHWA Electronic Signature information.||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6262&oldid=6260 Compare Here]
 +
|-
 +
|<center>5/20/2021</center>||<center>1 Supplemental</center>||<center>[[E-Signature|E-Signature]]</center>||Added E-Signature Guidance for FHWA staff as non-MDOT users.||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6260&oldid=6171 Compare Here]
 +
|-
 +
|<center>4/28/2021</center>||<center>1 Supplemental</center>||<center>[[Local_Agency_Program_(LAP)#Local_Agency_Program_Assistance.2FResources|Local Agency Program]]</center>||Updated FieldManager contact info (web address and e-mail).||[https://mdotwiki.state.mi.us/construction/index.php?title=Local_Agency_Program_%28LAP%29&type=revision&diff=6153&oldid=5987 Compare Here]
 +
|-
 +
|<center>3/17/2021</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Material_Documentation|811]]</center>||Updated information on the Permanent Pavement Markings, Material Documentation section.||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6141&oldid=6047 Compare Here]
 +
|-
 +
|<center>3/3/2021</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Contractor_Obligation|208]]</center>||Revised to add requirement to notify CFS resource specialist when Form 1568 for Project Staging or Excess Material Location on MDOT ROW is approved||[https://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&type=revision&diff=6130&oldid=5694 Compare Here]
 +
|-
 +
|<center>2/8/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated the Certified Engineer List as of February 2021.||[http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>2/2/2021</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General|104.10]]</center>||Updated the MDOT Claims Procedure with a revised version.||[http://mdotwiki.state.mi.us/construction/index.php?title=104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension&diff=6107&oldid=5896 Compare Here]
 +
|-
 +
|<center>1/6/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Replace the two current subsections; Determination of Work Days and Critical Path Networks, with single section titled [[102.02_Contents_of_Proposal_-_Progress_Clause#Contract_Time_Determination_.28CTD.29|“Contract Time Determination”]]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=6096&oldid=6094 Compare Here]
 +
|-
 +
|<center>1/5/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Added Controller Cabinet and Detection Equipment to Typical Long-Lead Items Table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=6094&oldid=6045 Compare Here]
 +
|-
 +
|<center>1/5/2021</center>||<center>4</center>||<center>[[402_-_Storm_Sewers#Illicit_Connections|402]]</center>||Update related to Illicit Connections||[http://mdotwiki.state.mi.us/construction/index.php?title=402_-_Storm_Sewers&diff=6092&oldid=6020 Compare Here]
 +
|-
 +
|<center>11/30/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Inspector.27s_Daily_Report_.28IDR.29|Inspector's Daily Report]]</center>||Updated instructions||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=6084&oldid=6043 Compare Here]
 +
|-
 +
|<center>10/29/2020</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes. Also included updated [//{{SERVERNAME}}/images_construction/0/08/Standard_Naming_Convention_Revised_10-29-2020.pdf PDF] and [//{{SERVERNAME}}/images_construction/8/8a/Standard_Naming_Convention_Revised_10-29-2020.xlsx XLSX] files (Rev 10-29-20)||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=6063&oldid=6058 Compare It]
 +
|-
 +
|<center>9/24/2020</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811]]</center>||Updated Permanent Pavement Markings payment table to include 2020 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here]
 +
|-
 +
|<center>9/24/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Added Guardrail-Steel to the Long-Lead item table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=6045&oldid=5947 Compare Here]
 +
|-
 +
|<center>9/15/2020</center>||<center>Disadvantaged Business Enterprises (DBE)</center>||<center>[[Disadvantaged_Business_Enterprises_(DBE)#Title_VI_Coordinator|Disadvantaged Business Enterprises (DBE)]]</center>||Updated contact information for MDOT's Title VI Coordinator to [mailto:CurryO@michigan.gov Orlando Curry]  517-241-7462||[http://mdotwiki.state.mi.us/construction/index.php?title=Disadvantaged_Business_Enterprises_%28DBE%29&diff=6034&oldid=5825 View Here]
 +
|-
 +
|<center>8/11/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Record Certification List with added Consultants||[http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager#LAP_Project_Considerations|FieldManager]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/FieldManager#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations|Plans, Proposal, Input, Review and Evaluation]]</center>||Added 'LAP Project Considerations' to the section under Design/Construction Package Evaluation||[http://mdotwiki.state.mi.us/construction/index.php/Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations_2|Plans, Proposal, Input, Review and Evaluation]]</center>||Added 'LAP Project Considerations' to the section under Post-Construction Reviews||[http://mdotwiki.state.mi.us/construction/index.php/Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations_2 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[Preconstruction_Meeting#LAP_Project_Considerations|102]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[102.01_Prequalification_of_Bidders#LAP_Project_Considerations|102.01]]</center>||Added 'LAP Project Considerations' to the section under Processing of Contractor Performance Evaluations||[http://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations|102.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[Extending_Project_Limits#LAP_Project_Considerations|103]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Extending_Project_Limits#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#LAP_Project_Considerations|103.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#LAP_Project_Considerations|103.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#LAP_Project_Considerations|104.10]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[108.07_Extension_of_Time_on_Work_Day_Contracts|108.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/108.07_Extension_of_Time_on_Work_Day_Contracts View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[Project_Delays_Due_to_a_Utility_Company#LAP_Project_Considerations|108]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Project_Delays_Due_to_a_Utility_Company#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Acceptance of work||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_2|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Pay Estimate and Inactive Project Notification||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_2 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_3|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Estimates||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_3 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_4|109.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_4 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_5|109.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_5 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_6|109.07]]</center>||Added 'LAP Project Considerations' to the section under Required Signature on Construction Pay Estimates||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_6 View Here]
 +
|-
 +
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[E-Construction#LAP_Project_Considerations|e-Construction]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/E-Construction#LAP_Project_Considerations View Here]
 +
|-
 +
|<center>7/27/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Updated MDOT Production Rates link. Old link did not work properly.||[http://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Construction_Time_Estimates_-_Production_Rates View Here]
 +
|-
 +
|<center>7/22/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager|FieldManager]]</center>||Updated Content for Showing Detail Calculations on Inspector’s Daily Report and Added Rounding Convention Example||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5938&oldid=5875 Compare Here]
 +
|-
 +
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[FPR_Frequently_Asked_Questions#How_is_the_Final_Project_Review_Report_updated.3F|FPR Frequently Asked Questions]]</center>||Added FPR Report User Guide link to FPR FAQ page||[http://mdotwiki.state.mi.us/construction/index.php?title=FPR_Frequently_Asked_Questions&diff=5868&oldid=5867 Compare Here]
 +
|-
 +
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Added FAQs link for Final Project Review to page||[http://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review&diff=5859&oldid=5849 Compare Here]
 +
|-
 +
|<center>6/24/2020</center>||<center>1 Supplemental</center>||<center>[[Project_Closeout_Escalation_of_Accountability|Project Closeout Escalation of Accountability]]</center>||Added links to the new Final Project Review Report page||[http://mdotwiki.state.mi.us/construction/index.php?title=Project_Closeout_Escalation_of_Accountability&diff=5845&oldid=5815 Compare Here]
 +
|-
 +
|<center>6/17/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Reformatted the Certified Engineer Renewal Process for clarity||[http://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&diff=5841&oldid=5840 Compare Here]
 +
|-
 +
|<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Updated Final Project Review page with Interim File Review link||[http://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review&diff=5831&oldid=5813 Compare Here]
 +
|-
 +
|<center>06/01/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/e/e7/Eng_Record_Cert_list_06-01-2020.pdf View Here]
 +
|-
 +
|<center>5/1/2020</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)| Dispute Review Board (DRB)]]</center>||Added updated DRB Procedures to include those let on and after 6-5-2020/Removed older links||[http://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&diff=5792&oldid=5137 Compare Here]
 +
|-
 +
|<center>4/30/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process| Certified Office Technician Process]]</center>||Edited page to reflect only Certified Technician Process information||[http://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&diff=5787&oldid=5720 Compare Here]
 +
|-
 +
|<center>4/29/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Non-Payment_Claims| 109.07]]</center>||Removed "Review of Prompt Payment Complaints" section as it's now its own page||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5776&oldid=5730 Compare Here]
 +
|-
 +
|<center>4/27/2020</center>||<center>1</center>||<center>[[101.04_-_Inspector%27s_Daily_Reports|101.04 Inspector Daily Reports]]<hr>[[FieldManager|FieldManager]]</center>||Updated Helpdesk number from 517-322-1556 to '''1-844-4MI-MDOT''' (1-844-464-6368) in these sections along with the Main page [http://mdotwiki.state.mi.us/construction/index.php/Main_Page#New_FieldManager_Helpdesk_Number Current News] area above
 +
||[http://mdotwiki.state.mi.us/construction/index.php?title=101.04_-_Inspector%27s_Daily_Reports&diff=5765&oldid=1534 Compare Here]<hr>[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5764&oldid=5713 Compare Here]
 +
|-
 +
|<center>4/22/2020</center>||<center>1</center>||<center>[[102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#Prompt_Payment| 102.18]]</center>||Added the newly created Prompt Payment link to Section 102.18||[http://mdotwiki.state.mi.us/construction/index.php?title=102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_%28DBEs%29&diff=5757&oldid=5164 Compare Here]
 +
|-
 +
|<center>4/15/2020</center>||<center>1</center>||<center>[[105.01_Quality_and_Scope_of_Supply| 105.01]]</center>||Changed Density Control Manual to Density Testing and Inspection Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=105.01_Quality_and_Scope_of_Supply&diff=5747&oldid=5745 Compare Here]
 +
|-
 +
|<center>4/14/2020</center>||<center>1</center>||<center>[[105.01_Quality_and_Scope_of_Supply| 105.01]]</center>||Changed Density Control Handbook to Density Control Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=105.01_Quality_and_Scope_of_Supply&diff=5745&oldid=4928 Compare Here]
 +
|-
 +
|<center>3/30/2020</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING| 107]]</center>||Updated Jobsite Poster||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING View Here]
 +
|-
 +
|<center>3/20/2020</center>||<center>1</center>||<center>[[Process_for_Documenting_Certified_Materials_in_FieldManager| 105]]</center>||Deleted information no longer applicable, or is covered in other documents/Renamed section due to changes||[http://mdotwiki.state.mi.us/construction/index.php?title=Process_for_Documenting_Certified_Materials_in_FieldManager&diff=5737&oldid=4931 Compare It]
 +
|-
 +
|<center>3/18/2020</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work| 108.01]]</center>||Updated links to the new 1302-Fed form.||[http://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&diff=5734&oldid=4975 Compare Here]
 +
|-
 +
|<center>2/21/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#General_Contract_Modification_Information| 103.02]]</center>||General Contract Modification Information Format Revision||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5728&oldid=5714 Compare It]
 
|-
 
|-
|<center>5/20/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Barrier Gates and Work Zone Speed Trailers to "Typical Long-Lead Items" table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5553&oldid=5539 Compare It]
+
|<center>2/13/2020</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes. Also included updated [//{{SERVERNAME}}/images_construction/d/d5/Standard_Naming_Convention_Revised_2-13-20.pdf PDF] and [//{{SERVERNAME}}/images_construction/a/a1/Standard_Naming_Convention_Revised_2-13-20.xlsx XLSX] files (Rev 2-13-20)||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=5726&oldid=5576 Compare It]
 
|-
 
|-
|<center>4/17/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Minor update to heading of Column 2 for Typical Long-Lead Items||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5539&oldid=5526 Compare It]
+
|<center>02/13/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/7/7a/Eng_Record_Cert_list_02-13-2020.pdf View Here]
 
|-
 
|-
|<center>4/1/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Delineator and 3# U-Channel Posts to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5526&oldid=5523 Compare It]
+
|<center>01/22/2020</center>||<center>Prevailing Wage Oversight Procedures</center>||<center>[[Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING| Jobsite Posting]]</center>||Updated contact information on the Title VI Poster and Coordinator site information||[http://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage_Oversight_Procedures&diff=5703&oldid=5036 Compare It]
 
|-
 
|-
|<center>3/14/2019</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Health_and_Safety|715]]</center>||Updated content related to: Health and Safety, Respiratory Protection and Protective Equipment, Medical Surveillance, Exposure Monitoring, Hygiene Facilities, and Lead Awareness Training||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=5516&oldid=5480 Compare It]
+
|<center>11/12/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Notification_2| 208]]</center>||Soil Erosion and Sedimentation Control Notifications: Updated Notice of Coverage (NOC) and Notice of Termination (NOT) charts||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5663&oldid=5586 Compare It]
 
|-
 
|-
|<center>3/13/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Strain Poles to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5514&oldid=5510 Compare It]
+
|<center>10/29/2019</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Eligibility_and_Use|Indirect Testing Charges - Eligibility and Use]]</center>||Updated first bullet information for clarity and to include examples||[http://mdotwiki.state.mi.us/construction/index.php?title=Construction_Field_Services_Indirect_Testing_Charges&diff=5659&oldid=5654 Compare It]
 
|-
 
|-
|<center>1/22/2019</center>||<center>7</center>||<center>[[718_-_Drilled_Shafts|718]]</center>||Provided clarification relating to [[718_-_Drilled_Shafts#Tremie_Tube_Concrete_Placement|Tremie Tube Concrete Placement]] along with inspection of shaft after [[718_-_Drilled_Shafts#Placing_Steel_Reinforcement|Placing Steel Reinforcement]] cage||[http://mdotwiki.state.mi.us/construction/index.php?title=718_-_Drilled_Shafts&diff=5487&oldid=4248 Compare It]
+
|<center>10/28/2019</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/4/45/Eng_Record_Cert_list_10-23-19.pdf View Here]
 
|-
 
|-
|<center>1/16/2019</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Small_Tools|109.05]]</center>||Clarification related to small tools for Force Account Work||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=5453&oldid=4945 Compare It]
+
|<center>10/3/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Pavement_Marking_Turn_Arrows|811]]</center>||Removal of references to outdated paint marking turn arrows||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5647&oldid=5640 Compare It]
 
|-
 
|-
|<center>12/3/2018</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[http://mdotwiki.state.mi.us/construction/index.php/File:Eng_Record_Cert_list_12-03-18.pdf View Here]
+
|<center>8/22/2019</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Update related to the process for archeological findings||[http://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&diff=5618&oldid=4933 Compare It]
 
|-
 
|-
|<center>8/30/2018</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[http://mdotwiki.state.mi.us/construction/index.php/File:Eng_Record_Cert_list_08-30-18.pdf View Here]
+
|<center>7/11/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)"||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5586&oldid=5241 Compare It]
 
|-
 
|-
|<center>8/29/2018</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Inspector.27s_Daily_Report_.28IDR.29|FieldManager]]</center>||Updated content related to Inspector Daily Reports and noting visual acceptance of material||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5386&oldid=4953 Compare It]
 
 
|}
 
|}
 
</div>
 
</div>

Revision as of 16:03, 24 January 2022

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

New FieldManager Helpdesk Number

The FieldManager Helpdesk activated its new phone number, 1-844-4MI-MDOT (1-844-464-6368). On the new phone menu, you can reach the FieldManager Helpdesk by selecting option 2 for AASHTOWare and then option 3 for FieldManager. The old number was deactivated on May 1st. The new number is part of the new unified help desk solution, MI MDOT Software Support, used to track and resolve software related issues from customers.

MI MDOT Software Support.png

[top of page]


Recent Major Changes

The table below is a list of Major changes.

Updated Division Section Summary What Changed
1/4/2022
1
109.07
Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment Compare Here
12/21/2021
1
107.09
Updated contents of entire section 107.09 Archeological and Historical Findings Compare Here
11/23/2021
2
208
Created new subsection "Sediment Discharge into Waters of the State of Michigan" View Here
11/17/2021
1
103.02
Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues Compare Here
10/27/2021
1
103.02
Updated content in Section 103.02 Construction Contract Modification Process Overview Compare Here
10/18/2021
1 Supplemental
Construction Field Services Indirect Testing Charges
Updated the Indirect Testing coding for FY 2022 View Here
10/7/2021
1
103.02
Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same Compare Here
9/28/2021
1
108.01
Updated information in section 108.01 Subcontracting of Contract Work Compare Here
9/16/2021
1
102
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021 View Here
9/8/2021
1
108.05
Replaced all information for 108.05 Progress Schedule section Compare Here
9/2/2021
1
109.07
Updated Final Estimates information and replaced Figure 109-1 Compare Here
9/1/2021
1 Supplemental
e-Construction
Removed table and updated Standard Naming Convention Alpha/Numeric lists Compare Here
8/25/2021
1
103.02
Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity. Compare Here
8/3/2021
1
105 Structural Fabrication Quality Manual
Updated content on Structural Fabrication Quality Manual page. Compare Here
6/16/2021
1 Supplemental
102.02
Updated Boilerplate Progress Clause Template document link (revision June 2021) View Here
6/16/2021
1
105
Added 2021 MQAP content View Here
6/8/2021
1
107.01
Created Section 107.01 Laws to be Observed View Here
5/11/2021
1 Supplemental
Certified Office Technician Process
Clarification of Prerequisites for Office Tech Certification Compare Here
4/19/2021
1
109.07
Updated Final Estimates information Compare Here
3/15/2021
1
104
Created new Digital Calculations for Payment section under Division 1, Section 104 View Here
2/9/2021
7
712
Added the Site Activation/Deactivation information Compare Here
2/9/2021
7
715
Updated information under Item #6, Site Activation/Deactivation Compare Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
1/18/2022
1 Supplemental
102.02
Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts Compare Here
1/5/2022
1
Final Project Review Report
Updated Final Project Review Report User Guide to September 2020 version Compare Here
1/4/2022
1
102.02
Updated/added Typical Long-Lead Items times for Guardrail-Steel Compare Here
1/4/2022
1 Supplemental
Local Agency Program
Added Archeological and Historical Findings resource View Here
12/14/2021
5
501
Updated 2012 to 2020 Spec Book reference View Here
12/13/2021
1 Supplemental
Certified Engineer List
Updated Certified Engineer List for December 2021 View Here
11/17/2021
1
Bi-Annual FieldManager User Account Verification Process
Updated all content. Compare Here
10/20/2021
1 Supplemental
108.01
Removed text about engineer's responsibility to check subcontractors are prequalified prior to start of work. Compare Here
10/12/2021
1 Supplemental
Current Certified Engineers
Updated Certified Engineer List to October 2021 View Here
10/5/2021
E-Construction
E-Construction
Updated information for Accessing MDOT's DataSource and Resource sections Compare Here
9/29/2021
8
811
Updated Permanent Pavement Markings payment table to include 2021 prices Compare Here
9/1/2021
1
102 Preconstruction
Updated Meeting Minutes with August 2021 file. Compare Here
8/30/2021
1
102.02
Updated 102.02 Contents of Proposal-Progress Clause, Guardrail-Steel Lead Times. Compare Here
7/26/2021
1 Supplemental
Current Certified Engineers
Added July 2021 Engineer Certification List. Compare Here
7/26/2021
5
501
Minor Update to correct yield calculation example. Compare Here
7/20/2021
103.02
103.02
Minor text edits of 103.02 Revisions to the Contract and 2012 to 2020 Spec Book Reference updates. Compare Here
7/14/2021
109.05C
109.05C
Updated information/language. Compare Here
7/13/2021
1
Prevailing Wage
Created a new section Prevailing Wage and relocated information here from 107.01 Laws to be Observed. View Here
7/13/2021
1
107.01 Laws to be Observed
Moved Prevailing Wage information to a new page. Compare Here
7/13/2021
1
Force Account Work
Created a new section Force Account Work, which cross-references with Section 109.05 Payment for Contract Revisions. View Here
6/16/2021
1 Supplemental
Dispute Review Board (DRB)
Made some text edits and added link to DRB webpage. Compare Here
6/16/2021
1 Supplemental
Certified Engineer Process
Updated Certified Engineer Process section content Compare Here
6/8/2021
1
102.02
Updated Progress Clause Template for LAP Projects (May 2021) document View Here
6/8/2021
1 Supplemental
Current Certified Engineers
Updated certified engineer list to June 2021 View Here
5/24/2021
1 Supplemental
E-Signature
Edited FHWA Electronic Signature information. Compare Here
5/20/2021
1 Supplemental
E-Signature
Added E-Signature Guidance for FHWA staff as non-MDOT users. Compare Here
4/28/2021
1 Supplemental
Local Agency Program
Updated FieldManager contact info (web address and e-mail). Compare Here
3/17/2021
8
811
Updated information on the Permanent Pavement Markings, Material Documentation section. Compare Here
3/3/2021
2
208
Revised to add requirement to notify CFS resource specialist when Form 1568 for Project Staging or Excess Material Location on MDOT ROW is approved Compare Here
2/8/2021
1 Supplemental
Certified Engineer List
Updated the Certified Engineer List as of February 2021. View Here
2/2/2021
1
104.10
Updated the MDOT Claims Procedure with a revised version. Compare Here
1/6/2021
1
102.02
Replace the two current subsections; Determination of Work Days and Critical Path Networks, with single section titled “Contract Time Determination” Compare Here
1/5/2021
1
102.02
Added Controller Cabinet and Detection Equipment to Typical Long-Lead Items Table Compare Here
1/5/2021
4
402
Update related to Illicit Connections Compare Here
11/30/2020
1 Supplemental
Inspector's Daily Report
Updated instructions Compare Here
10/29/2020
E-Construction
Standard Naming Convention for Documents
Updated Naming Convention Table to reflect recent changes. Also included updated PDF and XLSX files (Rev 10-29-20) Compare It
9/24/2020
8
811
Updated Permanent Pavement Markings payment table to include 2020 prices Compare Here
9/24/2020
1
102.02
Added Guardrail-Steel to the Long-Lead item table Compare Here
9/15/2020
Disadvantaged Business Enterprises (DBE)
Disadvantaged Business Enterprises (DBE)
Updated contact information for MDOT's Title VI Coordinator to Orlando Curry 517-241-7462 View Here
8/11/2020
1 Supplemental
Certified Engineer Process
Updated Record Certification List with added Consultants View Here
8/4/2020
1 Supplemental
FieldManager
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1 Supplemental
Plans, Proposal, Input, Review and Evaluation
Added 'LAP Project Considerations' to the section under Design/Construction Package Evaluation View Here
8/4/2020
1 Supplemental
Plans, Proposal, Input, Review and Evaluation
Added 'LAP Project Considerations' to the section under Post-Construction Reviews View Here
8/4/2020
1
102
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
102.01
Added 'LAP Project Considerations' to the section under Processing of Contractor Performance Evaluations View Here
8/4/2020
1
102.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
104.10
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
108.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
108
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Acceptance of work View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Pay Estimate and Inactive Project Notification View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Estimates View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Required Signature on Construction Pay Estimates View Here
8/4/2020
1 Supplemental
e-Construction
Added 'LAP Project Considerations' to the section View Here
7/27/2020
1
102.02
Updated MDOT Production Rates link. Old link did not work properly. View Here
7/22/2020
1 Supplemental
FieldManager
Updated Content for Showing Detail Calculations on Inspector’s Daily Report and Added Rounding Convention Example Compare Here
6/30/2020
1 Supplemental
FPR Frequently Asked Questions
Added FPR Report User Guide link to FPR FAQ page Compare Here
6/30/2020
1 Supplemental
Final Project Review
Added FAQs link for Final Project Review to page Compare Here
6/24/2020
1 Supplemental
Project Closeout Escalation of Accountability
Added links to the new Final Project Review Report page Compare Here
6/17/2020
1 Supplemental
Certified Engineer Process
Reformatted the Certified Engineer Renewal Process for clarity Compare Here
6/9/2020
1 Supplemental
Final Project Review
Updated Final Project Review page with Interim File Review link Compare Here
06/01/2020
1 Supplemental
Certification Programs
Updated Engineer Record Certification List View Here
5/1/2020
1 Supplemental
Dispute Review Board (DRB)
Added updated DRB Procedures to include those let on and after 6-5-2020/Removed older links Compare Here
4/30/2020
1 Supplemental
Certified Office Technician Process
Edited page to reflect only Certified Technician Process information Compare Here
4/29/2020
1
109.07
Removed "Review of Prompt Payment Complaints" section as it's now its own page Compare Here
4/27/2020
1
101.04 Inspector Daily Reports
FieldManager
Updated Helpdesk number from 517-322-1556 to 1-844-4MI-MDOT (1-844-464-6368) in these sections along with the Main page Current News area above Compare Here
Compare Here
4/22/2020
1
102.18
Added the newly created Prompt Payment link to Section 102.18 Compare Here
4/15/2020
1
105.01
Changed Density Control Manual to Density Testing and Inspection Manual Compare Here
4/14/2020
1
105.01
Changed Density Control Handbook to Density Control Manual Compare Here
3/30/2020
1
107
Updated Jobsite Poster View Here
3/20/2020
1
105
Deleted information no longer applicable, or is covered in other documents/Renamed section due to changes Compare It
3/18/2020
1
108.01
Updated links to the new 1302-Fed form. Compare Here
2/21/2020
1
103.02
General Contract Modification Information Format Revision Compare It
2/13/2020
E-Construction
Standard Naming Convention for Documents
Updated Naming Convention Table to reflect recent changes. Also included updated PDF and XLSX files (Rev 2-13-20) Compare It
02/13/2020
1 Supplemental
Certified Engineer Process
Updated Engineer Record Certification List View Here
01/22/2020
Prevailing Wage Oversight Procedures
Jobsite Posting
Updated contact information on the Title VI Poster and Coordinator site information Compare It
11/12/2019
2
208
Soil Erosion and Sedimentation Control Notifications: Updated Notice of Coverage (NOC) and Notice of Termination (NOT) charts Compare It
10/29/2019
1 Supplemental
Indirect Testing Charges - Eligibility and Use
Updated first bullet information for clarity and to include examples Compare It
10/28/2019
1 Supplemental
Certified Engineer Process
Updated Engineer Record Certification List View Here
10/3/2019
8
811
Removal of references to outdated paint marking turn arrows Compare It
8/22/2019
1
107.09
Update related to the process for archeological findings Compare It
7/11/2019
2
208
Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)" Compare It

[top of page]


Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.


Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the Help:Contents page.


[top of page]