Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
(→‎Recent Major Changes: Replaced/Updated all content)
(208 intermediate revisions by 3 users not shown)
Line 23: Line 23:
 
=[[Current News|<font color="red">Current News</font>]]=
 
=[[Current News|<font color="red">Current News</font>]]=
  
==[[#Documentation Guide|Documentation Guide]]==
+
==[[#New AASHTOWare Project Construction & Materials Software Manual|AASHTOWare Project Construction & Materials Software Manual]]==
The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content (Updated July 2019). A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.
+
Support for AASHTOware Construction and Materials can be found at the new [https://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page AASHTOWare Project Construction & Materials Software Manual]
  
[[File:Documentation Guide Final Draft 07-29-19.pdf|thumb|center|200px|link=//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf]]
+
For any additional support please contact the AASHTOWare Helpdesk email [mailto:MDOT-ConstructionSoftware@michigan.gov MDOT-ConstructionSoftware@michigan.gov] or the FieldManager Helpdesk email [mailto:FieldManager-Admin@michigan.gov FieldManager-Admin@michigan.gov].
 +
 
 +
[[File:MI MDOT Software Support.png|center|200px]]
  
 
{{top}}
 
{{top}}
Line 34: Line 36:
 
<div style="overflow:auto; height:200px; width:700px">
 
<div style="overflow:auto; height:200px; width:700px">
 
{| class="wikitable" style="background:orange; color:black"
 
{| class="wikitable" style="background:orange; color:black"
 +
!Updated!! Division !! Section !! Summary !! What Changed
 +
|-
 +
https://mdotwiki.state.mi.us/construction/index.php/E-Signature#Guidance_for_Non-MDOT_Users
 +
|<center>03/20/2023</center>||<center>1 Supplemental</center>||<center>[[E-Signature]]</center>||Updated MDOT Digital Signatures Guidance for One-Span||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6909&oldid=6908 View Here]
 +
|-
 +
|<center>03/20/2023</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
 +
|-
 +
|<center>03/08/2023</center>||<center>1</center>||<center>[[108.09_Request_for_Time_Extensions_on_Work_Day,_Calendar_Day,_and_Calendar_Date_Contracts|108.09]]</center>||Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09.||[https://mdotwiki.state.mi.us/construction/index.php?title=108.07_Extension_of_Time_on_Work_Day_Contracts&type=revision&diff=6865&oldid=6510 Compare Here]
 +
|-
 +
|<center>10/17/2022</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use|Construction Field Services Indirect Testing Charges]]</center>||Updated content with FY2023 Program Numbers||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View Here]
 +
|-
 +
|<center>10/11/2022</center>||<center>1</center>||<center>[[Construction_Value_Engineering_Change_Proposal_(VECP)|104]]</center>||Updated content for Construction Value Engineering Change Proposal (VECP).||[https://mdotwiki.state.mi.us/construction/index.php?title=Construction_Value_Engineering_Change_Proposal_%28VECP%29&type=revision&diff=6808&oldid=6761 Compare Here]
 +
|-
 +
|<center>10/11/2022</center>||<center>8</center>||<center>[[820_-_Traffic_Signals|820]]</center>||Added new Acceptance of Traffic Signal Work content, including pay item list and form.||[https://mdotwiki.state.mi.us/construction/index.php/820_-_Traffic_Signals#Acceptance_of_Traffice_Signal_Work View Here]
 +
|-
 +
|<center>9/19/2022</center>||<center>1 Supplemental</center>||<center>[[FHWA’s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan)|FHWA Risk-Based Project Involvement]]</center>||Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI).  References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement.
 +
||[https://mdotwiki.state.mi.us/construction/index.php/FHWA%E2%80%99s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) View Here]
 +
|-
 +
|<center>7/21/2022</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General|104.10]]</center>||Updated Construction Claims Procedure document with July 2022 version.||[https://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General View Here]
 +
|-
 +
|<center>6/21/2022</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Temporary_Special_Markings_for_Cold_Weather|811]]</center>||Updated temporary special markings price negotiation costs||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6685&oldid=6666 Compare Here]
 +
|-
 +
|<center>5/18/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page AASHTOWare Project Construction & Materials Software Manual (Wiki)]</center>||Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki||[https://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page View Here]
 +
|-
 +
|<center>5/5/2022</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Durable_Pavement_Markings|811]]</center>||Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6666&oldid=6567 Compare Here]
 +
|-
 +
|<center>4/19/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf Documentation Guide 2022]</center>||Updated Documentation Guide 2022||[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf View Here]
 +
|-
 +
|<center>3/16/2022</center>||<center>1</center>||<center>[[Holiday_Traffic_Safety_Provisions|Holiday Traffic Safety Provisions]]</center>||Updated table to project Holiday Traffic Safety Provisions and Closures dates to 2030||[https://mdotwiki.state.mi.us/construction/index.php/Holiday_Traffic_Safety_Provisions View Here]
 +
|-
 +
|<center>1/4/2022</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Acceptance_of_Work|109.07]]</center>||Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6483&oldid=6380 Compare Here]
 
|-
 
|-
!Updated!! Division !! Section !! Summary !! What Changed
+
|<center>12/21/2021</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Updated contents of entire section 107.09 Archeological and Historical Findings||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=6466&oldid=5618 Compare Here]
 +
|-
 +
|<center>11/23/2021</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan|208]]</center>||Created new subsection "Sediment Discharge into Waters of the State of Michigan"||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan View Here]
 +
|-
 +
|<center>11/17/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Design_Errors|103.02]]</center>||Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6440&oldid=6436 Compare Here]
 +
|-
 +
|<center>10/27/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#top|103.02]]</center>||Updated content in Section 103.02 Construction Contract Modification Process Overview||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6436&oldid=6403 Compare Here]
 +
|-
 +
|<center>10/18/2021</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY 2022||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here]
 
|-
 
|-
|<center>9/26/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Field_Inspection_and_Processing_of_Progress_Payments|811]]</center>||Permanent Pavement Markings Field Inspection and Processing of Progress Payments: Updated new content ||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5640&oldid=5632 Compare It]
+
|<center>10/7/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Construction_Contract_and_Construction_Engineering_Phase_Funding_Revisions|103.02]]</center>||Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6403&oldid=6351 Compare Here]
 
|-
 
|-
|<center>9/18/2019</center>||<center>6</center>||<center>[[602_-_Concrete_Pavement_Construction#Load_Transfer_Assemblies|602]]</center>||Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections||[http://mdotwiki.state.mi.us/construction/index.php?title=602_-_Concrete_Pavement_Construction&diff=5629&oldid=5556 Compare It]
+
|<center>9/28/2021</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work|108.01]]</center>||Updated information in section 108.01 Subcontracting of Contract Work||[https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&type=revision&diff=6385&oldid=6292 Compare Here]
 
|-
 
|-
|<center>9/18/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2019||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
+
|<center>9/16/2021</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
 
|-
 
|-
|<center>8/30/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019||[//{{SERVERNAME}}/images_construction/5/5e/TRUNKLINE_Boilerplate_Preconstruction_Meeting_Minutes_2019_Final.docx View Here]
+
|<center>9/8/2021</center>||<center>1</center>||<center>[[108.05_Progress_Schedule|108.05]]</center>||Replaced all information for 108.05 Progress Schedule section ||[https://mdotwiki.state.mi.us/construction/index.php?title=108.05_Progress_Schedule&type=revision&diff=6369&oldid=5269 Compare Here]
 
|-
 
|-
|<center>8/20/2019</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Standard_Rounding_Convention_Guidance|FieldManager]]</center>||New guidance related to the Standard Rounding Convention ||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5615&oldid=5386 Compare It]
+
|<center>9/2/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>|| Updated Final Estimates information and replaced Figure 109-1 ||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6367&oldid=6151 Compare Here]
 
|-
 
|-
|<center>7/31/2019</center>||<center>Main Page</center>||<center>Main Page</center>||July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the [//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf#page=3 "e-Final Project Review Procedures"]||[//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf View Here]
+
|<center>9/1/2021</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Removed table and updated Standard Naming Convention Alpha/Numeric lists||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=6359&oldid=6293 Compare Here]
 
|-
 
|-
|<center>6/26/2019</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109]]</center>||Updated: Final Project Review Procedures to the new [[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#e-Final_Project_Review_Procedures|"e-Final Project Review Procedures"]]||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5578&oldid=5538 Compare It]
+
|<center>8/25/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Requirements_for_FHWA_Review_on_Projects_of_Division_Interest_.28PoDI.29|103.02]]</center>||Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6351&oldid=6350 Compare Here]
 
|-
 
|-
|<center>5/28/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated to Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5567&oldid=5553 Compare It]
+
|<center>8/3/2021</center>||<center>1</center>||<center>[[Structural_Fabrication_Quality_Manual|105 Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual page.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=6347&oldid=6006 Compare Here]
 
|-
 
|-
|<center>4/9/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|103.02]]</center>||Updates and clarifications related to [[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|Detailed Contract Modification Information]] area as well as the [[103.02_Contract_Revisions#Design_Issues.2FPremium_Costs|Design Issue/Premium Costs]] area related to Contract Revisions||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5534&oldid=5521 Compare It]
+
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated Boilerplate Progress Clause Template document link (revision June 2021)||[https://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause View Here]
 
|-
 
|-
|<center>3/19/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Local_Agency_Projects|103.02]]</center>||[https://www.michigan.gov/documents/mdot_federal_Guidelines_99105_7.pdf Provided link to current Local Agency Programs Section Federal Guidelines]||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5521&oldid=5256 Compare It]
+
|<center>6/16/2021</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105]]</center>||Added 2021 MQAP content||[https://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2021_Summary_of_Revisions_to_the_MQAP View Here]
 
|-
 
|-
|<center>3/19/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||[http://mdotwiki.state.mi.us/construction/index.php/File:LOCAL_AGENCY_Boilerplate_Preconstruction_Meeting_Minutes_-_March_2019.docx Preconstruction Meeting Minutes Boilerplate - Local Agency]||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5519&oldid=5406 Compare It]
+
|<center>6/8/2021</center>||<center>1</center>||<center>[[107.01_Laws_to_be_Observed|107.01]]</center>||Created Section 107.01 Laws to be Observed||[https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed View Here]
 
|-
 
|-
|<center>3/6/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Removed old production rate information and replaced with [http://mdotwiki.state.mi.us/construction/index.php/File:MDOT_Production_Rates_.xlsx new .xlsx file containing updated production rate information]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5510&oldid=5439 Compare It]
+
|<center>5/11/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process#Office_Technician_Certification_Requirements|Certified Office Technician Process]]</center>||Clarification of Prerequisites for Office Tech Certification||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&type=revision&diff=6216&oldid=6167 Compare Here]
 
|-
 
|-
|<center>2/28/2019</center>||<center>Main Page</center>||<center>Main Page</center>||New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. ||[//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf View Here]
+
|<center>4/19/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>||Updated Final Estimates information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6151&oldid=5946 Compare Here]
 
|-
 
|-
|<center>1/10/2019</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension|104.10]]</center>||Updated Contractor Claims Procedure for 2019||[http://mdotwiki.state.mi.us/construction/index.php?title=File:MDOT_Construction_Contractor_Claims_Procedure_January_2019.pdf&page=1 View Here]
+
|<center>3/15/2021</center>||<center>1</center>||<center>[[Digital_Calculations_for_Payment|104]]</center>||Created new Digital Calculations for Payment section under Division 1, Section 104||[https://mdotwiki.state.mi.us/construction/index.php/Digital_Calculations_for_Payment View Here]
 
|-
 
|-
|<center>12/12/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal|102.02]]</center>||Updated Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php/File:Boilerplate_Progress_Clause_Template_12-12-18.docx View Here]
+
|<center>2/9/2021</center>||<center>7</center>||<center>[[712_-_Bridge_Rehabilitation,_Concrete#Hydrodemolition|712]]</center>||Added the Site Activation/Deactivation information||[http://mdotwiki.state.mi.us/construction/index.php?title=712_-_Bridge_Rehabilitation%2C_Concrete&diff=6115&oldid=5606 Compare Here]
 
|-
 
|-
|<center>11/7/2018</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Preconstruction Meeting Minutes Boilerplate - Trunkline||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5406&oldid=5265 Compare It]
+
|<center>2/9/2021</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Other_Documentation|715]]</center>||Updated information under Item #6, Site Activation/Deactivation||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=6118&oldid=5598 Compare Here]
 
|-
 
|-
|<center>10/26/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2018||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
 
 
|}
 
|}
 
</div>
 
</div>
Line 83: Line 123:
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>8/22/2019</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Update related to the process for archeological findings||[http://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&diff=5618&oldid=4933 Compare It]
+
|<center>03/08/2023</center>||<center>1</center>||<center>[[104.10_Claim_for_Extra_Compensation_or_Extension_of_Time|104.10]]</center>||Updated contact info for MDOT Construction Contracts Engineer.||[https://mdotwiki.state.mi.us/construction/index.php?title=104.10_Claim_for_Extra_Compensation_or_Extension_of_Time&type=revision&diff=6873&oldid=6834 Compare Here]
 +
|-
 +
|<center>03/07/2023</center>||<center>1</center>||<center>[[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions|103.02 Contract Revisions]]</center>||Updated Flow Chart for Contract Modifications approval for FHWA RBPI process.||[https://mdotwiki.state.mi.us/images_construction/8/84/Appendix_A_-_Approval_Path_Flow_Chart_UPDATED_3-7-23_Final.pdf View Here]
 +
|-
 +
|<center>02/16/2023</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer list to February 2023.||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>02/07/2023</center>||<center>1 Supplemental</center>||<center>[[Project_with_Consultant_Oversight|Project with Consultant Oversight]]</center>||Updated language used.||[https://mdotwiki.state.mi.us/construction/index.php?title=Project_with_Consultant_Oversight&type=revision&diff=6854&oldid=5171 Compare Here]
 +
|-
 +
|<center>12/01/2022</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 11/30/2022||[https://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View Here]
 +
|-
 +
|<center>11/10/2022</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions|109.05]]</center>||Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages.||[https://mdotwiki.state.mi.us/construction/index.php/109.05_Payment_for_Contract_Revisions#Labor Compare Here]
 
|-
 
|-
|<center>7/11/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)"||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5586&oldid=5241 Compare It]
+
|<center>10/18/2022</center>||<center>1</center>||<center>[[Preconstruction_Meeting#Preconstruction_Meeting_Minutes|Preconstruction Meeting]]</center>||Added verbiage stating preconstruction meetings must not be conducted prior to award of the project.||[https://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&type=revision&diff=6815&oldid=6590 Compare Here]
 
|-
 
|-
|<center>6/25/2019</center>||<center>1</center>||<center>[[107.19_Hauling_on_Local_Roads_and_Streets#Hauling_on_Local_Roads_and_Streets|107.19]]</center>||Removed Hauling Route Permit Guidance||[http://mdotwiki.state.mi.us/construction/index.php?title=107.19_Hauling_on_Local_Roads_and_Streets&diff=5577&oldid=4936 Compare It]
+
|<center>10/05/2022</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811]]</center>||Updated Permanent Pavement Markings payment table to include 2022 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here]
 
|-
 
|-
|<center>6/20/2019</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes.||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=5574&oldid=5563 Compare It]
+
|<center>7/20/2022</center>||<center>307</center>||<center>[[307_-_Aggregate_Shoulders_and_Approaches#MEASUREMENT_AND_PAYMENT|Aggregate Shoulders and Approaches, Measurement and Payment]]</center>||Updated moisture content change information under Measurement and Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=307_-_Aggregate_Shoulders_and_Approaches&type=revision&diff=6699&oldid=6620 Compare Here]
 
|-
 
|-
|<center>6/17/2019</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/a/af/Eng_Record_Cert_list_06-17-19.pdf View Here]
+
|<center>7/5/2022</center>||<center>1 supplemental</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_.28DRB.29|Dispute Review Board]]</center>||Updated link to public-facing website for DRB and updated pdf file as of July 2022||[https://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&type=revision&diff=6696&oldid=6695 Compare Here]
 
|-
 
|-
|<center>5/20/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Barrier Gates and Work Zone Speed Trailers to "Typical Long-Lead Items" table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5553&oldid=5539 Compare It]
+
|<center>7/5/2022</center>||<center>1 supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List to June 2022||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>4/17/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Minor update to heading of Column 2 for Typical Long-Lead Items||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5539&oldid=5526 Compare It]
+
|<center>6/30/2022</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Updated lead times for Steel Pipe pile in excess of 14 inches diameter..., Concrete Beams, and added Precast Box Culverts and Ductile Iron Watermain||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6687&oldid=6675 Compare Here]
 
|-
 
|-
|<center>4/1/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Delineator and 3# U-Channel Posts to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5526&oldid=5523 Compare It]
+
|<center>6/7/2022</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Turbidity_Curtain|208]]</center>||Added new Turbidity Curtain section||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Turbidity_Curtain View Here]
 
|-
 
|-
|<center>3/14/2019</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Health_and_Safety|715]]</center>||Updated content related to: Health and Safety, Respiratory Protection and Protective Equipment, Medical Surveillance, Exposure Monitoring, Hygiene Facilities, and Lead Awareness Training||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=5516&oldid=5480 Compare It]
+
|<center>5/26/2022</center>||<center>1</center>||<center>[[Process_for_Documenting_Certified_Materials_in_FieldManager|Process for Documenting Certified Materials in FieldManager]]</center>||Updated content and added samples||[https://mdotwiki.state.mi.us/construction/index.php?title=Process_for_Documenting_Certified_Materials_in_FieldManager&type=revision&diff=6682&oldid=6591 Compare Here]
 
|-
 
|-
|<center>3/13/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Strain Poles to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5514&oldid=5510 Compare It]
+
|<center>4/14/2022</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List to April 2022||[https://mdotwiki.state.mi.us/images_construction/e/ec/Engineer_certification_list_-_April_2022.pdf View Here]
 
|-
 
|-
|<center>1/22/2019</center>||<center>7</center>||<center>[[718_-_Drilled_Shafts|718]]</center>||Provided clarification relating to [[718_-_Drilled_Shafts#Tremie_Tube_Concrete_Placement|Tremie Tube Concrete Placement]] along with inspection of shaft after [[718_-_Drilled_Shafts#Placing_Steel_Reinforcement|Placing Steel Reinforcement]] cage||[http://mdotwiki.state.mi.us/construction/index.php?title=718_-_Drilled_Shafts&diff=5487&oldid=4248 Compare It]
+
|<center>4/14/2022</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_Process_Flowchart|Dispute Review Board Process Flowchart]]</center>||Updated DRB Process Flowchart to 2022||[https://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)#Dispute_Review_Board_Process_Flowchart View Here]
 
|-
 
|-
|<center>1/16/2019</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Small_Tools|109.05]]</center>||Clarification related to small tools for Force Account Work||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=5453&oldid=4945 Compare It]
+
|<center>3/15/2022</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109.07]]</center>||Updated and reorganized section to clarifying information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6637&oldid=6483 Compare Here]
 +
|-
 +
|<center>2/17/2022</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 2/17/2022||[https://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View Here]
 +
|-
 +
|<center>2/3/2022</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for February 2022||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>1/18/2022</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6530&oldid=6485 Compare Here]
 +
|-
 +
|<center>1/5/2022</center>||<center>1</center>||<center>[[Final_Project_Review_Report|Final Project Review Report]]</center>||Updated Final Project Review Report User Guide to September 2020 version||[https://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review_Report&type=revision&diff=6488&oldid=6174 Compare Here]
 +
|-
 +
|<center>1/4/2022</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Updated/added Typical Long-Lead Items times for Guardrail-Steel||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6485&oldid=6353 Compare Here]
 +
|-
 +
|<center>1/4/2022</center>||<center>1 Supplemental</center>||<center>[[Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99|Local Agency Program]]</center>||Added Archeological and Historical Findings resource||[https://mdotwiki.state.mi.us/construction/index.php/Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99 View Here]
 +
|-
 +
|<center>12/14/2021</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Updated 2012 to 2020 Spec Book reference||[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt View Here]
 +
|-
 +
|<center>12/13/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for December 2021||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 +
|-
 +
|<center>11/17/2021</center>||<center>1</center>||<center>[[FieldManager#Bi-Annual_FieldManager_User_Account_Verification_Process|Bi-Annual FieldManager User Account Verification Process]]</center>||Updated all content.||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6438&oldid=6103 Compare Here]
 
|-
 
|-
|<center>12/3/2018</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[http://mdotwiki.state.mi.us/construction/index.php/File:Eng_Record_Cert_list_12-03-18.pdf View Here]
 
 
|}
 
|}
 
</div>
 
</div>
  
 
{{top}}
 
{{top}}
 +
 +
==Sign Up for Updates==
 +
To learn about how to sign up to receive updates related to MDOT's Construction Manual Wiki along with other State of Michigan content check out the video provided below.
 +
 +
<div style="float: center; padding-left: 1px; padding-right: 1px;">{{#ev:youtube|y1g5KLud_uc|300|center|Click here to learn how to sign up for MDOT notifications}}</div>
 +
 +
[[File:ListServ Red Envelope2.PNG|300px|link=https://public.govdelivery.com/accounts/MIDOT/subscriber/new]]
  
 
=[[#Preamble|Preamble]]=
 
=[[#Preamble|Preamble]]=
Line 126: Line 200:
  
  
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
+
This manual has been formatted and organized to follow the MDOT Standard Specifications outline with divisions and sections set up to facilitate easy cross referencing.
 
 
  
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [[Help:Contents]] page.
+
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [https://mdotwikiqa.state.mi.us/construction/index.php/MDOT_Construction_Manual_Content_Revision_Procedures MDOT Construction Manual Content Revision Procedures] page.
  
  
 
{{top}}
 
{{top}}
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]

Revision as of 14:44, 20 March 2023

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

AASHTOWare Project Construction & Materials Software Manual

Support for AASHTOware Construction and Materials can be found at the new AASHTOWare Project Construction & Materials Software Manual

For any additional support please contact the AASHTOWare Helpdesk email MDOT-ConstructionSoftware@michigan.gov or the FieldManager Helpdesk email FieldManager-Admin@michigan.gov.

MI MDOT Software Support.png

[top of page]


Recent Major Changes

The table below is a list of Major changes.

https://mdotwiki.state.mi.us/construction/index.php/E-Signature#Guidance_for_Non-MDOT_Users
Updated Division Section Summary What Changed
03/20/2023
1 Supplemental
E-Signature
Updated MDOT Digital Signatures Guidance for One-Span View Here
03/20/2023
1
102
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023 View Here
03/08/2023
1
108.09
Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09. Compare Here
10/17/2022
1 Supplemental
Construction Field Services Indirect Testing Charges
Updated content with FY2023 Program Numbers View Here
10/11/2022
1
104
Updated content for Construction Value Engineering Change Proposal (VECP). Compare Here
10/11/2022
8
820
Added new Acceptance of Traffic Signal Work content, including pay item list and form. View Here
9/19/2022
1 Supplemental
FHWA Risk-Based Project Involvement
Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI). References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement. View Here
7/21/2022
1
104.10
Updated Construction Claims Procedure document with July 2022 version. View Here
6/21/2022
8
811
Updated temporary special markings price negotiation costs Compare Here
5/18/2022
Sidebar
AASHTOWare Project Construction & Materials Software Manual (Wiki)
Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki View Here
5/5/2022
8
811
Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections Compare Here
4/19/2022
Sidebar
Documentation Guide 2022
Updated Documentation Guide 2022 View Here
3/16/2022
1
Holiday Traffic Safety Provisions
Updated table to project Holiday Traffic Safety Provisions and Closures dates to 2030 View Here
1/4/2022
1
109.07
Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment Compare Here
12/21/2021
1
107.09
Updated contents of entire section 107.09 Archeological and Historical Findings Compare Here
11/23/2021
2
208
Created new subsection "Sediment Discharge into Waters of the State of Michigan" View Here
11/17/2021
1
103.02
Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues Compare Here
10/27/2021
1
103.02
Updated content in Section 103.02 Construction Contract Modification Process Overview Compare Here
10/18/2021
1 Supplemental
Construction Field Services Indirect Testing Charges
Updated the Indirect Testing coding for FY 2022 View Here
10/7/2021
1
103.02
Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same Compare Here
9/28/2021
1
108.01
Updated information in section 108.01 Subcontracting of Contract Work Compare Here
9/16/2021
1
102
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021 View Here
9/8/2021
1
108.05
Replaced all information for 108.05 Progress Schedule section Compare Here
9/2/2021
1
109.07
Updated Final Estimates information and replaced Figure 109-1 Compare Here
9/1/2021
1 Supplemental
e-Construction
Removed table and updated Standard Naming Convention Alpha/Numeric lists Compare Here
8/25/2021
1
103.02
Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity. Compare Here
8/3/2021
1
105 Structural Fabrication Quality Manual
Updated content on Structural Fabrication Quality Manual page. Compare Here
6/16/2021
1 Supplemental
102.02
Updated Boilerplate Progress Clause Template document link (revision June 2021) View Here
6/16/2021
1
105
Added 2021 MQAP content View Here
6/8/2021
1
107.01
Created Section 107.01 Laws to be Observed View Here
5/11/2021
1 Supplemental
Certified Office Technician Process
Clarification of Prerequisites for Office Tech Certification Compare Here
4/19/2021
1
109.07
Updated Final Estimates information Compare Here
3/15/2021
1
104
Created new Digital Calculations for Payment section under Division 1, Section 104 View Here
2/9/2021
7
712
Added the Site Activation/Deactivation information Compare Here
2/9/2021
7
715
Updated information under Item #6, Site Activation/Deactivation Compare Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
03/08/2023
1
104.10
Updated contact info for MDOT Construction Contracts Engineer. Compare Here
03/07/2023
1
[Contract Revisions]
Updated Flow Chart for Contract Modifications approval for FHWA RBPI process. View Here
02/16/2023
1 Supplemental
Certified Engineer List
Updated Certified Engineer list to February 2023. View Here
02/07/2023
1 Supplemental
Project with Consultant Oversight
Updated language used. Compare Here
12/01/2022
1 Supplemental
e-Construction
Updated alpha/numeric standard naming convention lists as of 11/30/2022 View Here
11/10/2022
1
109.05
Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages. Compare Here
10/18/2022
1
Preconstruction Meeting
Added verbiage stating preconstruction meetings must not be conducted prior to award of the project. Compare Here
10/05/2022
8
811
Updated Permanent Pavement Markings payment table to include 2022 prices Compare Here
7/20/2022
307
Aggregate Shoulders and Approaches, Measurement and Payment
Updated moisture content change information under Measurement and Payment Compare Here
7/5/2022
1 supplemental
Dispute Review Board
Updated link to public-facing website for DRB and updated pdf file as of July 2022 Compare Here
7/5/2022
1 supplemental
Certified Engineer List
Updated Certified Engineer List to June 2022 View Here
6/30/2022
1
102.02
Updated lead times for Steel Pipe pile in excess of 14 inches diameter..., Concrete Beams, and added Precast Box Culverts and Ductile Iron Watermain Compare Here
6/7/2022
2
208
Added new Turbidity Curtain section View Here
5/26/2022
1
Process for Documenting Certified Materials in FieldManager
Updated content and added samples Compare Here
4/14/2022
1 Supplemental
Certified Engineer List
Updated Certified Engineer List to April 2022 View Here
4/14/2022
1 Supplemental
Dispute Review Board Process Flowchart
Updated DRB Process Flowchart to 2022 View Here
3/15/2022
1
109.07
Updated and reorganized section to clarifying information Compare Here
2/17/2022
1 Supplemental
e-Construction
Updated alpha/numeric standard naming convention lists as of 2/17/2022 View Here
2/3/2022
1 Supplemental
Certified Engineer List
Updated Certified Engineer List for February 2022 View Here
1/18/2022
1 Supplemental
102.02
Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts Compare Here
1/5/2022
1
Final Project Review Report
Updated Final Project Review Report User Guide to September 2020 version Compare Here
1/4/2022
1
102.02
Updated/added Typical Long-Lead Items times for Guardrail-Steel Compare Here
1/4/2022
1 Supplemental
Local Agency Program
Added Archeological and Historical Findings resource View Here
12/14/2021
5
501
Updated 2012 to 2020 Spec Book reference View Here
12/13/2021
1 Supplemental
Certified Engineer List
Updated Certified Engineer List for December 2021 View Here
11/17/2021
1
Bi-Annual FieldManager User Account Verification Process
Updated all content. Compare Here

[top of page]


Sign Up for Updates

To learn about how to sign up to receive updates related to MDOT's Construction Manual Wiki along with other State of Michigan content check out the video provided below.

Click here to learn how to sign up for MDOT notifications

ListServ Red Envelope2.PNG

Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been formatted and organized to follow the MDOT Standard Specifications outline with divisions and sections set up to facilitate easy cross referencing.

Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the MDOT Construction Manual Content Revision Procedures page.


[top of page]