Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
m (→‎Recent Minor Changes: Updated Minor Change Table to reflect update to heading of Column 2 for Typical Long-Lead Items in Section 102.02 Contents of Proposal)
 
(223 intermediate revisions by 4 users not shown)
Line 2: Line 2:
  
  
<center><span STYLE="font: 40pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
+
<center><span STYLE="font: 25pt arial;">'''CONSTRUCTION MANUAL'''</span></center>
  
  
<center>[[File:logo.jpg|400px]]</center>
+
<center>[[File:logo.jpg|250px]]</center>
  
  
  
<center><span STYLE="font: 30pt arial;">'''Bureau of Field Services'''</span></center>
+
<center><span STYLE="font: 20pt arial;">'''Bureau of Field Services'''</span></center>
  
<center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center>
+
<center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center>
  
 
<span style="float: right;">
 
<span style="float: right;">
<center><span style="float: right;">[[File:DI-06711-091.jpg|550px|thumb|right|M-20 bridge project in Midland. Opening of westbound structure to traffic.]]</span></center>
+
<center><span style="float: right;">[[File:DI-06801-092.jpg|450px|thumb|right|Box culvert construction on M-10 in Clare County.]]</span></center>
 
</span>
 
</span>
  
Line 23: Line 23:
 
=[[Current News|<font color="red">Current News</font>]]=
 
=[[Current News|<font color="red">Current News</font>]]=
  
==[[#Documentation Guide|Documentation Guide]]==
+
==[[#New AASHTOWare Project Construction & Materials Software Manual|AASHTOWare Project Construction & Materials Software Manual]]==
The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content. A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.
+
Support for AASHTOware Construction and Materials can be found at the new [https://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page AASHTOWare Project Construction & Materials Software Manual]
  
[[File:Documentation Guide Final Draft 02-25-19.pdf|thumb|center|200px|link=//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf]]
+
For any additional support please contact the AASHTOWare Helpdesk email [mailto:MDOT-ConstructionSoftware@michigan.gov MDOT-ConstructionSoftware@michigan.gov] or the FieldManager Helpdesk email [mailto:FieldManager-Admin@michigan.gov FieldManager-Admin@michigan.gov].
 +
 
 +
[[File:MI MDOT Software Support.png|center|200px]]
  
 
{{top}}
 
{{top}}
Line 34: Line 36:
 
<div style="overflow:auto; height:200px; width:700px">
 
<div style="overflow:auto; height:200px; width:700px">
 
{| class="wikitable" style="background:orange; color:black"
 
{| class="wikitable" style="background:orange; color:black"
|-
 
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>4/9/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|103.02]]</center>||Updates and clarifications related to [[103.02_Contract_Revisions#Detailed_Contract_Modification_Information|Detailed Contract Modification Information]] area as well as the [[103.02_Contract_Revisions#Design_Issues.2FPremium_Costs|Design Issue/Premium Costs]] area related to Contract Revisions||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5534&oldid=5521 Compare It]
+
|<center>10/17/2022</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use|Construction Field Services Indirect Testing Charges]]</center>||Updated content with FY2023 Program Numbers||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View Here]
 
|-
 
|-
|<center>3/19/2019</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Local_Agency_Projects|103.02]]</center>||[https://www.michigan.gov/documents/mdot_federal_Guidelines_99105_7.pdf Provided link to current Local Agency Programs Section Federal Guidelines]||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5521&oldid=5256 Compare It]
+
|<center>10/11/2022</center>||<center>1</center>||<center>[[Construction_Value_Engineering_Change_Proposal_(VECP)|104]]</center>||Updated content for Construction Value Engineering Change Proposal (VECP).||[https://mdotwiki.state.mi.us/construction/index.php?title=Construction_Value_Engineering_Change_Proposal_%28VECP%29&type=revision&diff=6808&oldid=6761 Compare Here]
 
|-
 
|-
|<center>3/19/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||[http://mdotwiki.state.mi.us/construction/index.php/File:LOCAL_AGENCY_Boilerplate_Preconstruction_Meeting_Minutes_-_March_2019.docx Preconstruction Meeting Minutes Boilerplate - Local Agency]||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5519&oldid=5406 Compare It]
+
|<center>10/11/2022</center>||<center>8</center>||<center>[[820_-_Traffic_Signals|820]]</center>||Added new Acceptance of Traffic Signal Work content, including pay item list and form.||[https://mdotwiki.state.mi.us/construction/index.php/820_-_Traffic_Signals#Acceptance_of_Traffice_Signal_Work View Here]
 
|-
 
|-
|<center>3/6/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Removed old production rate information and replaced with [http://mdotwiki.state.mi.us/construction/index.php/File:MDOT_Production_Rates_.xlsx new .xlsx file containing updated production rate information]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5510&oldid=5439 Compare It]
+
|<center>9/19/2022</center>||<center>1 Supplemental</center>||<center>[[FHWA’s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan)|FHWA Risk-Based Project Involvement]]</center>||Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI). References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement.
 +
||[https://mdotwiki.state.mi.us/construction/index.php/FHWA%E2%80%99s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) View Here]
 
|-
 
|-
|<center>2/28/2019</center>||<center>Main Page</center>||<center>Main Page</center>||New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. ||[//{{SERVERNAME}}/images_construction/0/0d/Documentation_Guide_Final_Draft_02-25-19.pdf View Here]
+
|<center>7/21/2022</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General|104.10]]</center>||Updated Construction Claims Procedure document with July 2022 version.||[https://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General View Here]
 
|-
 
|-
|<center>1/10/2019</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension|104.10]]</center>||Updated Contractor Claims Procedure for 2019||[http://mdotwiki.state.mi.us/construction/index.php?title=File:MDOT_Construction_Contractor_Claims_Procedure_January_2019.pdf&page=1 View Here]
+
|<center>6/21/2022</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Temporary_Special_Markings_for_Cold_Weather|811]]</center>||Updated temporary special markings price negotiation costs||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6685&oldid=6666 Compare Here]
 
|-
 
|-
|<center>12/12/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal|102.02]]</center>||Updated Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php/File:Boilerplate_Progress_Clause_Template_12-12-18.docx View Here]
+
|<center>5/18/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page AASHTOWare Project Construction & Materials Software Manual (Wiki)]</center>||Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki||[https://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page View Here]
 
|-
 
|-
|<center>11/7/2018</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Preconstruction Meeting Minutes Boilerplate - Trunkline||[http://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&diff=5406&oldid=5265 Compare It]
+
|<center>5/5/2022</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Durable_Pavement_Markings|811]]</center>||Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6666&oldid=6567 Compare Here]
 
|-
 
|-
|<center>10/26/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2018||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
+
|<center>4/19/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf Documentation Guide 2022]</center>||Updated Documentation Guide 2022||[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf View Here]
 
|-
 
|-
|<center>9/13/2018</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|Materials Quality Assurance Procedures Manual]]</center>||2018 Summary of Revisions to the manual||[http://mdotwiki.state.mi.us/construction/index.php?title=Materials_Quality_Assurance_Procedures_Manual&diff=5394&oldid=5025 Compare It]
+
|<center>3/16/2022</center>||<center>1</center>||<center>[[Holiday_Traffic_Safety_Provisions|Holiday Traffic Safety Provisions]]</center>||Updated table to project Holiday Traffic Safety Provisions and Closures dates to 2030||[https://mdotwiki.state.mi.us/construction/index.php/Holiday_Traffic_Safety_Provisions View Here]
 
|-
 
|-
|<center>6/4/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102]]</center>||Provided New Table for "Typical Long Lead Time Items" along with updating to the latest "Boilerplate Progress Clause Template 5-30-15"||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5353&oldid=5201 Compare It]
+
|<center>1/4/2022</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Acceptance_of_Work|109.07]]</center>||Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6483&oldid=6380 Compare Here]
 
|-
 
|-
|<center>4/26/2018</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109]]</center>||Update to Purpose of Review.||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection,_Acceptance,_and_Final_Payment&diff=5280&oldid=4987 Compare It]
+
|<center>12/21/2021</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Updated contents of entire section 107.09 Archeological and Historical Findings||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=6466&oldid=5618 Compare Here]
 
|-
 
|-
|<center>1/19/2018</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Addition of Notice of termination section.||[http://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Submittal_of_Notice_of_Termination view here]
+
|<center>11/23/2021</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan|208]]</center>||Created new subsection "Sediment Discharge into Waters of the State of Michigan"||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan View Here]
 
|-
 
|-
|<center>1/17/2018</center>||<center>7</center>||<center>[[708_-_Prestressed_Concrete|708]]</center>||Overhaul of information for section 708||[http://mdotwiki.state.mi.us/construction/index.php?title=708_-_Prestressed_Concrete&diff=5238&oldid=5233 compare]
+
|<center>11/17/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Design_Errors|103.02]]</center>||Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6440&oldid=6436 Compare Here]
 
|-
 
|-
|<center>1/16/2018</center>||<center>7</center>||<center>[[707_-_Structural_Steel|707]]||Overhaul of information for section 707||[http://mdotwiki.state.mi.us/construction/index.php?title=707_-_Structural_Steel&diff=5230&oldid=5186 compare]
+
|<center>10/27/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#top|103.02]]</center>||Updated content in Section 103.02 Construction Contract Modification Process Overview||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6436&oldid=6403 Compare Here]
 
|-
 
|-
|12/19/2017</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs#Engineer_Certification_Program| Engineer Certification]]</center>||Updated Engineer Certification List||[//{{SERVERNAME}}/images_construction/a/ac/Eng_Record_Cert_list_12-19-17.pdf Linked Here]
+
|<center>10/18/2021</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY 2022||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here]
 
|-
 
|-
|<center>12/12/2017</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation|Plans, Proposal, Imput, Review and Evaluation]]</center>||Update about Post Construction Information||[http://mdotwiki.state.mi.us/construction/index.php/Other#Post-Construction_Reviews View Here]
+
|<center>10/7/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Construction_Contract_and_Construction_Engineering_Phase_Funding_Revisions|103.02]]</center>||Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6403&oldid=6351 Compare Here]
 
|-
 
|-
|<center>12/7/2017</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal|102.02]]</center>||Updated Boilerplate Progress Clause Template||[http://mdotwiki.state.mi.us/construction/index.php/File:Boilerplate_Progress_Clause_Template_12-6-17.docx View Here]
+
|<center>9/28/2021</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work|108.01]]</center>||Updated information in section 108.01 Subcontracting of Contract Work||[https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&type=revision&diff=6385&oldid=6292 Compare Here]
 
|-
 
|-
|<center>11/27/2017</center>||<center>Main Page</center>||<center>Main Page</center>||New Preamble for Construction Manual||
+
|<center>9/16/2021</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
 
|-
 
|-
|<center>11/27/2017</center>||<center>1 Supplemental</center>||<center>[[e-Construction#Standard_Naming_Convention_for_Documents|Standard Naming Convention]]</center>||New format for Standard Naming Convention||
+
|<center>9/8/2021</center>||<center>1</center>||<center>[[108.05_Progress_Schedule|108.05]]</center>||Replaced all information for 108.05 Progress Schedule section ||[https://mdotwiki.state.mi.us/construction/index.php?title=108.05_Progress_Schedule&type=revision&diff=6369&oldid=5269 Compare Here]
 
|-
 
|-
|<center>11/3/2017</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Testing Charges]]</center>||Updated LDPR coding||[http://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View here]
+
|<center>9/2/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>|| Updated Final Estimates information and replaced Figure 109-1 ||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6367&oldid=6151 Compare Here]
 
|-
 
|-
|<center>11/2/2017</center>||<center>1 Supplemental</center>||<center>[[E-Construction|E-Construction]]</center>||Updated table for file naming||[http://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View table here]
+
|<center>9/1/2021</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Removed table and updated Standard Naming Convention Alpha/Numeric lists||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=6359&oldid=6293 Compare Here]
 
|-
 
|-
|<center>11/1/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency|Local Agency]]</center>||Updated coding information for SIGMA||[http://mdotwiki.state.mi.us/construction/index.php/Local_Agency#CHARGING_TIME_TO_LOCAL_AGENCY_PROJECTS View Here]
+
|<center>8/25/2021</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#Requirements_for_FHWA_Review_on_Projects_of_Division_Interest_.28PoDI.29|103.02]]</center>||Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6351&oldid=6350 Compare Here]
 
|-
 
|-
|<center>10/26/2017</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Added new section for Special Markings for Cold Weather||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#Temporary_Special_Markings_for_Cold_Weather View Here]
+
|<center>8/3/2021</center>||<center>1</center>||<center>[[Structural_Fabrication_Quality_Manual|105 Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual page.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=6347&oldid=6006 Compare Here]
 
|-
 
|-
|<center>10/19/2017</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2017||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
+
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated Boilerplate Progress Clause Template document link (revision June 2021)||[https://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause View Here]
 
|-
 
|-
|<center>9/21/2017</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|Materials Quality Assurance Procedures Manual]]</center>||2017 Summary of Revision to the manual||
+
|<center>6/16/2021</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105]]</center>||Added 2021 MQAP content||[https://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2021_Summary_of_Revisions_to_the_MQAP View Here]
 
|-
 
|-
|<center>9/14/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency#Project_Administration:_MDOT_Oversight_Folder|Local Agency]]</center>||Guidance on new folder in ProjectWise||
+
|<center>6/8/2021</center>||<center>1</center>||<center>[[107.01_Laws_to_be_Observed|107.01]]</center>||Created Section 107.01 Laws to be Observed||[https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed View Here]
 
|-
 
|-
|<center>9/6/2017</center>||<center>1</center>||<center>[[LCPtracker_Supplemental_Information|LCPtracker Tracker]]</center>||New Page specifically for LCPtracker||
+
|<center>5/11/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process#Office_Technician_Certification_Requirements|Certified Office Technician Process]]</center>||Clarification of Prerequisites for Office Tech Certification||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&type=revision&diff=6216&oldid=6167 Compare Here]
 
|-
 
|-
|<center>8/24/2017</center>||<center>1</center>||<center>[[102.14_Construction_Progress_Schedule|102.14]]</center>||Moved progress form 1130 to new section 102.14||
+
|<center>4/19/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>||Updated Final Estimates information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6151&oldid=5946 Compare Here]
 
|-
 
|-
|<center>7/11/2017</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work#Construction_Subcontract_Process|108.1]]</center>||Changed email for 1302A Forms||[mailto:MDOT-ConstructionSubcontracts@michigan.gov New email address here]
+
|<center>3/15/2021</center>||<center>1</center>||<center>[[Digital_Calculations_for_Payment|104]]</center>||Created new Digital Calculations for Payment section under Division 1, Section 104||[https://mdotwiki.state.mi.us/construction/index.php/Digital_Calculations_for_Payment View Here]
 
|-
 
|-
|<center>6/20/2017</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||New coding content||[http://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View Coding Guidelines here]
+
|<center>2/9/2021</center>||<center>7</center>||<center>[[712_-_Bridge_Rehabilitation,_Concrete#Hydrodemolition|712]]</center>||Added the Site Activation/Deactivation information||[http://mdotwiki.state.mi.us/construction/index.php?title=712_-_Bridge_Rehabilitation%2C_Concrete&diff=6115&oldid=5606 Compare Here]
 
|-
 
|-
|<center>6/16/2016</center>||<center>1 Supplemental</center>||<center>[[FieldManager|FieldManager]]</center>||Addition of CMU 2017-003, Electronic Read only Files||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=4895&oldid=4836 View Here]
+
|<center>2/9/2021</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Other_Documentation|715]]</center>||Updated information under Item #6, Site Activation/Deactivation||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=6118&oldid=5598 Compare Here]
 
|-
 
|-
|<center>4/25/2017</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal#Progress_Clause| 102.02]]</center>||Update according to CA 2015-11 with Boiler progress update.||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal&diff=4631&oldid=4454 Compare It]
 
|-
 
|<center>4/21/2017</center>||<center>1</center>||<center>[[Contract_Administration_and_Oversight_Guidelines_for_Projects_Containing_Warranty_Work|Contract Admin]]</center>||Added content according to CA 2015-13||[http://mdotwiki.state.mi.us/construction/index.php?title=Contract_Administration_and_Oversight_Guidelines_for_Projects_Containing_Warranty_Work&diff=4616&oldid=4544 Compare It]
 
|-
 
|<center>4/19/2017</center>||<center>2</center>||<center>[[205_-_Roadway_Earthwork#Cost_Over_Runs_From_Off_Site_Disposal_of_Soil|205]]</center>||Added content in accordance with CA 2008-01||[http://mdotwiki.state.mi.us/construction/index.php?title=205_-_Roadway_Earthwork&diff=4609&oldid=4268 Compare It]
 
|-
 
|<center>4/19/2017</center>||<center>1</center>||<center>[[104.07_Contractor_Obligations#Project_.26_Worksite_Safety|104.07]]</center>||Added Content according to CA 2013-12, Workers Safety||[http://mdotwiki.state.mi.us/construction/index.php?title=104.07_Contractor_Obligations&diff=4605&oldid=4570 Compare It]
 
|-
 
|<center>4/19/2017</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Force Account Work|109.05]]</center>||Made adjustments to implement form 1101-SP109||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=4603&oldid=4588 Compare It]
 
|-
 
|<center>4/5/2017</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures#Prevailing_Wage_Classifications|Prevailing Wage]]</center>||Added Section for Prevailing Wage Classification from CA 2007-15||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#Prevailing_Wage_Classifications View Here]
 
 
|}
 
|}
 
</div>
 
</div>
Line 125: Line 116:
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>4/17/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Minor update to heading of Column 2 for Typical Long-Lead Items||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5539&oldid=5526 Compare It]
+
|<center>12/01/2022</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 11/30/2022||[https://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View Here]
 
|-
 
|-
|<center>4/1/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Delineator and 3# U-Channel Posts to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5526&oldid=5523 Compare It]
+
 
|-
+
|<center>11/10/2022</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions|109.05]]</center>||Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages.||[https://mdotwiki.state.mi.us/construction/index.php/109.05_Payment_for_Contract_Revisions#Labor Compare Here]
|<center>3/14/2019</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Health_and_Safety|715]]</center>||Updated content related to: Health and Safety, Respiratory Protection and Protective Equipment, Medical Surveillance, Exposure Monitoring, Hygiene Facilities, and Lead Awareness Training||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=5516&oldid=5480 Compare It]
 
|-
 
|<center>3/13/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Strain Poles to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5514&oldid=5510 Compare It]
 
 
|-
 
|-
|<center>1/22/2019</center>||<center>7</center>||<center>[[718_-_Drilled_Shafts|718]]</center>||Provided clarification relating to [[718_-_Drilled_Shafts#Tremie_Tube_Concrete_Placement|Tremie Tube Concrete Placement]] along with inspection of shaft after [[718_-_Drilled_Shafts#Placing_Steel_Reinforcement|Placing Steel Reinforcement]] cage||[http://mdotwiki.state.mi.us/construction/index.php?title=718_-_Drilled_Shafts&diff=5487&oldid=4248 Compare It]
+
|<center>10/18/2022</center>||<center>1</center>||<center>[[Preconstruction_Meeting#Preconstruction_Meeting_Minutes|Preconstruction Meeting]]</center>||Added verbiage stating preconstruction meetings must not be conducted prior to award of the project.||[https://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&type=revision&diff=6815&oldid=6590 Compare Here]
 
|-
 
|-
|<center>1/16/2019</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Small_Tools|109.05]]</center>||Clarification related to small tools for Force Account Work||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=5453&oldid=4945 Compare It]
+
|<center>10/05/2022</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811]]</center>||Updated Permanent Pavement Markings payment table to include 2022 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here]
 
|-
 
|-
|<center>12/3/2018</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[http://mdotwiki.state.mi.us/construction/index.php/File:Eng_Record_Cert_list_12-03-18.pdf View Here]
+
|<center>7/20/2022</center>||<center>307</center>||<center>[[307_-_Aggregate_Shoulders_and_Approaches#MEASUREMENT_AND_PAYMENT|Aggregate Shoulders and Approaches, Measurement and Payment]]</center>||Updated moisture content change information under Measurement and Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=307_-_Aggregate_Shoulders_and_Approaches&type=revision&diff=6699&oldid=6620 Compare Here]
 
|-
 
|-
|<center>8/30/2018</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs|Certification Programs]]</center>||Updated Engineer Record Certification List||[http://mdotwiki.state.mi.us/construction/index.php/File:Eng_Record_Cert_list_08-30-18.pdf View Here]
+
|<center>7/5/2022</center>||<center>1 supplemental</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_.28DRB.29|Dispute Review Board]]</center>||Updated link to public-facing website for DRB and updated pdf file as of July 2022||[https://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&type=revision&diff=6696&oldid=6695 Compare Here]
 
|-
 
|-
|<center>8/29/2018</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Inspector.27s_Daily_Report_.28IDR.29|FieldManager]]</center>||Updated content related to Inspector Daily Reports and noting visual acceptance of material||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5386&oldid=4953 Compare It]
+
|<center>7/5/2022</center>||<center>1 supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List to June 2022||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>2/20/2018</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures|Prevailing Wage Oversight]]</center>||Updated Title VI Poster||[http://mdotwiki.state.mi.us/construction/index.php/File:MDOT_TitleVI_englishposter.pdf View Here]
+
|<center>6/30/2022</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Updated lead times for Steel Pipe pile in excess of 14 inches diameter..., Concrete Beams, and added Precast Box Culverts and Ductile Iron Watermain||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6687&oldid=6675 Compare Here]
 
|-
 
|-
|<center>2/12/2018</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension|104.10]]</center>||Changed contact info to Mike Deboer and added direction to Claims Database in ProjectWise||[http://mdotwiki.state.mi.us/construction/index.php?title=104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension&diff=5251&oldid=4922 Compare It]
+
|<center>6/7/2022</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Turbidity_Curtain|208]]</center>||Added new Turbidity Curtain section||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Turbidity_Curtain View Here]
 
|-
 
|-
|<center>2/6/2018</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Changed roller speed calculation from 23.36 mph to 2.36 mph||[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt#Roller_Speed section here]
+
|<center>5/26/2022</center>||<center>1</center>||<center>[[Process_for_Documenting_Certified_Materials_in_FieldManager|Process for Documenting Certified Materials in FieldManager]]</center>||Updated content and added samples||[https://mdotwiki.state.mi.us/construction/index.php?title=Process_for_Documenting_Certified_Materials_in_FieldManager&type=revision&diff=6682&oldid=6591 Compare Here]
 
|-
 
|-
|<center>1/16/2018</center>||<center>1</center>||<center>[[108.05_Progress_of_the_Work|108.05]]</center>||Moved content from 102.14 to 108.05||
+
|<center>4/14/2022</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List to April 2022||[https://mdotwiki.state.mi.us/images_construction/e/ec/Engineer_certification_list_-_April_2022.pdf View Here]
 
|-
 
|-
|<center>1/10/2018</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|12.02]]</center>||Renamed page and moved structures progress clause to this section||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5189&oldid=5182 Compare It]
+
|<center>4/14/2022</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_Process_Flowchart|Dispute Review Board Process Flowchart]]</center>||Updated DRB Process Flowchart to 2022||[https://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)#Dispute_Review_Board_Process_Flowchart View Here]
 
|-
 
|-
|<center>1/4/2018</center>||<center>1 supplemental</center>||||Separated "other" page into separate pages||  
+
|<center>3/15/2022</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109.07]]</center>||Updated and reorganized section to clarifying information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6637&oldid=6483 Compare Here]
 
|-
 
|-
|<center>12/20/2017</center>||<center>1</center>||<center>[[102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#DBE_Performance_Indicators|102.18]]</center>||Updated content related to Commercially Useful Function (CUF). Part of CMU 2017-005||[http://mdotwiki.state.mi.us/construction/index.php?title=102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)&diff=5162&oldid=4910 Compare It]
+
|<center>2/17/2022</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 2/17/2022||[https://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View Here]
 
|-
 
|-
|<center>12/4/2017</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)|Dispute Review Board]]</center>||Update to page and ProjectWise directions||
+
|<center>2/3/2022</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for February 2022||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>11/28/2017</center>||<center>1 Supplemental</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated examples for Calc forms||
+
|<center>1/18/2022</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6530&oldid=6485 Compare Here]
 
|-
 
|-
|<center>11/2/2016</center>||<center>1</center>||<center>NA</center>||Removed 'Disincentive' from manual language||
+
|<center>1/5/2022</center>||<center>1</center>||<center>[[Final_Project_Review_Report|Final Project Review Report]]</center>||Updated Final Project Review Report User Guide to September 2020 version||[https://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review_Report&type=revision&diff=6488&oldid=6174 Compare Here]
 
|-
 
|-
|<center>10/26/2017</center>||<center>1</center>||<center>[[103.02_Contract_Revisions|103.02]]</center>||Moved ''Contract Modification Process Overview'' page to ''103.02 Contract Revisions||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions View Here]
+
|<center>1/4/2022</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Updated/added Typical Long-Lead Items times for Guardrail-Steel||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6485&oldid=6353 Compare Here]
 
|-
 
|-
|<center>10/25/2017</center>||<center>7 Supplemental</center>||<center>[[Division 7 Supplemental Information#Division_7_Supplemental_Information|Division 7 Supplemental Information]]</center>||Updated notification contact information for bridge deck pours and concrete deck overlays||[https://mdotwiki.state.mi.us/construction/index.php?title=Division_7_Supplemental_Information&diff=5064&oldid=4970 View Update]
+
|<center>1/4/2022</center>||<center>1 Supplemental</center>||<center>[[Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99|Local Agency Program]]</center>||Added Archeological and Historical Findings resource||[https://mdotwiki.state.mi.us/construction/index.php/Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99 View Here]
 
|-
 
|-
|<center>10/23/2017</center>||<center>1</center>||<center>NA</center>||Changed language from "Approved for Traffic" to "Open to traffic"||
+
|<center>12/14/2021</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Updated 2012 to 2020 Spec Book reference||[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt View Here]
 
|-
 
|-
|<center>10/11/2017</center>||<center>8</center>||<center>[[803_-_Concrete_Sidewalk,_Ramps,_and_Steps#MEASUREMENT_AND_PAYMENT|803]]</center>||Added illustration of sidewalk measurement and payment||[//{{SERVERNAME}}/images_construction/7/72/Road_Design_Manual_Chapter_6_-_ADA_Ramp_payment_items.pdf See Here]
+
|<center>12/13/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for December 2021||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>9/26/2017</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures|Prevailing Wage Oversight Procedures]]</center>||Updated Posters to add USERRA Poster||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING View Here]
+
|<center>11/17/2021</center>||<center>1</center>||<center>[[FieldManager#Bi-Annual_FieldManager_User_Account_Verification_Process|Bi-Annual FieldManager User Account Verification Process]]</center>||Updated all content.||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6438&oldid=6103 Compare Here]
 
|-
 
|-
|<center>4/24/2017</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Pay_Item_Selection|109.07]]</center>||Updated according CA 2015-06||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=4622&oldid=4591 Compare It]
 
|-
 
|<center>4/24/2017</center>||<center>1</center>||<center>[[Disadvantaged_Business_Enterprises_(DBE)#Disadvantages_Business_Enterprises_.28DBE.29|Disadvantaged Business]]</center>||Updated content according CA 2014-13||[http://mdotwiki.state.mi.us/construction/index.php?title=Disadvantaged_Business_Enterprises_%28DBE%29&diff=4620&oldid=4571 Compare It]
 
|-
 
|<center>4/21/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency#PROJECT_ADMINISTRATION_MDOT-LET_LOCAL_AGENCY_PROJECTS|Local Agency]]</center>||Updated content according to CA 2009-16||[http://mdotwiki.state.mi.us/construction/index.php?title=Local_Agency&diff=4618&oldid=4574 Compare It]
 
|-
 
|<center>4/20/2017</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501]]</center>||Updated content from CA 2006-07||[http://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&diff=4614&oldid=4250 Compare It]
 
|-
 
|<center>4/20/2017</center>||<center>5</center>||<center>[[502_-_HMA_Crack_Treatment#GENERAL|502]]</center>||Added update from CA 2009-03 to CM||[http://mdotwiki.state.mi.us/construction/index.php?title=502_-_HMA_Crack_Treatment&diff=4611&oldid=3361 Compare It]
 
|-
 
|<center>4/19/2017</center>||<center>1 Supplemental</center>||<center>[[Certification_Programs#Review_Procedure|Cert Programs]]</center>||Added text from CA 2014-03||[http://mdotwiki.state.mi.us/construction/index.php?title=Certification_Programs&diff=4607&oldid=4311 Compare It]
 
|-
 
|<center>4/5/2017</center>||<center>6</center>||<center>[[603_-_Concrete_Pavement_Restoration#Removing Old Concrete|603]]</center>||Added text update from CA 2013-09||[http://mdotwiki.state.mi.us/construction/index.php?title=603_-_Concrete_Pavement_Restoration&diff=4429&oldid=4017 Compare It]
 
|-
 
|<center>3/28/2017</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Marked_Plans|109.07]]</center>||Added links from CA 2009-20||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Marked_Plans View Here]
 
|-
 
|<center>3/27/2017</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#DOCUMENTING_PRICE_NEGOTIATIONS|109.05]]</center>||Updated reference to CFR and included link||[http://mdotwiki.state.mi.us/construction/index.php/109.05_Payment_for_Contract_Revisions#DOCUMENTING_PRICE_NEGOTIATIONS View Here]
 
 
|}
 
|}
 
</div>
 
</div>
Line 208: Line 179:
  
  
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
+
This manual has been formatted and organized to follow the MDOT Standard Specifications outline with divisions and sections set up to facilitate easy cross referencing.
 
 
  
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [[Help:Contents]] page.
+
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [https://mdotwikiqa.state.mi.us/construction/index.php/MDOT_Construction_Manual_Content_Revision_Procedures MDOT Construction Manual Content Revision Procedures] page.
  
  
 
{{top}}
 
{{top}}
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]

Latest revision as of 10:03, 1 December 2022

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

AASHTOWare Project Construction & Materials Software Manual

Support for AASHTOware Construction and Materials can be found at the new AASHTOWare Project Construction & Materials Software Manual

For any additional support please contact the AASHTOWare Helpdesk email MDOT-ConstructionSoftware@michigan.gov or the FieldManager Helpdesk email FieldManager-Admin@michigan.gov.

MI MDOT Software Support.png

[top of page]


Recent Major Changes

The table below is a list of Major changes.

Updated Division Section Summary What Changed
10/17/2022
1 Supplemental
Construction Field Services Indirect Testing Charges
Updated content with FY2023 Program Numbers View Here
10/11/2022
1
104
Updated content for Construction Value Engineering Change Proposal (VECP). Compare Here
10/11/2022
8
820
Added new Acceptance of Traffic Signal Work content, including pay item list and form. View Here
9/19/2022
1 Supplemental
FHWA Risk-Based Project Involvement
Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI). References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement. View Here
7/21/2022
1
104.10
Updated Construction Claims Procedure document with July 2022 version. View Here
6/21/2022
8
811
Updated temporary special markings price negotiation costs Compare Here
5/18/2022
Sidebar
AASHTOWare Project Construction & Materials Software Manual (Wiki)
Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki View Here
5/5/2022
8
811
Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections Compare Here
4/19/2022
Sidebar
Documentation Guide 2022
Updated Documentation Guide 2022 View Here
3/16/2022
1
Holiday Traffic Safety Provisions
Updated table to project Holiday Traffic Safety Provisions and Closures dates to 2030 View Here
1/4/2022
1
109.07
Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment Compare Here
12/21/2021
1
107.09
Updated contents of entire section 107.09 Archeological and Historical Findings Compare Here
11/23/2021
2
208
Created new subsection "Sediment Discharge into Waters of the State of Michigan" View Here
11/17/2021
1
103.02
Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues Compare Here
10/27/2021
1
103.02
Updated content in Section 103.02 Construction Contract Modification Process Overview Compare Here
10/18/2021
1 Supplemental
Construction Field Services Indirect Testing Charges
Updated the Indirect Testing coding for FY 2022 View Here
10/7/2021
1
103.02
Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same Compare Here
9/28/2021
1
108.01
Updated information in section 108.01 Subcontracting of Contract Work Compare Here
9/16/2021
1
102
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021 View Here
9/8/2021
1
108.05
Replaced all information for 108.05 Progress Schedule section Compare Here
9/2/2021
1
109.07
Updated Final Estimates information and replaced Figure 109-1 Compare Here
9/1/2021
1 Supplemental
e-Construction
Removed table and updated Standard Naming Convention Alpha/Numeric lists Compare Here
8/25/2021
1
103.02
Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity. Compare Here
8/3/2021
1
105 Structural Fabrication Quality Manual
Updated content on Structural Fabrication Quality Manual page. Compare Here
6/16/2021
1 Supplemental
102.02
Updated Boilerplate Progress Clause Template document link (revision June 2021) View Here
6/16/2021
1
105
Added 2021 MQAP content View Here
6/8/2021
1
107.01
Created Section 107.01 Laws to be Observed View Here
5/11/2021
1 Supplemental
Certified Office Technician Process
Clarification of Prerequisites for Office Tech Certification Compare Here
4/19/2021
1
109.07
Updated Final Estimates information Compare Here
3/15/2021
1
104
Created new Digital Calculations for Payment section under Division 1, Section 104 View Here
2/9/2021
7
712
Added the Site Activation/Deactivation information Compare Here
2/9/2021
7
715
Updated information under Item #6, Site Activation/Deactivation Compare Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
12/01/2022
1 Supplemental
e-Construction
Updated alpha/numeric standard naming convention lists as of 11/30/2022 View Here
11/10/2022
1
109.05
Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages. Compare Here
10/18/2022
1
Preconstruction Meeting
Added verbiage stating preconstruction meetings must not be conducted prior to award of the project. Compare Here
10/05/2022
8
811
Updated Permanent Pavement Markings payment table to include 2022 prices Compare Here
7/20/2022
307
Aggregate Shoulders and Approaches, Measurement and Payment
Updated moisture content change information under Measurement and Payment Compare Here
7/5/2022
1 supplemental
Dispute Review Board
Updated link to public-facing website for DRB and updated pdf file as of July 2022 Compare Here
7/5/2022
1 supplemental
Certified Engineer List
Updated Certified Engineer List to June 2022 View Here
6/30/2022
1
102.02
Updated lead times for Steel Pipe pile in excess of 14 inches diameter..., Concrete Beams, and added Precast Box Culverts and Ductile Iron Watermain Compare Here
6/7/2022
2
208
Added new Turbidity Curtain section View Here
5/26/2022
1
Process for Documenting Certified Materials in FieldManager
Updated content and added samples Compare Here
4/14/2022
1 Supplemental
Certified Engineer List
Updated Certified Engineer List to April 2022 View Here
4/14/2022
1 Supplemental
Dispute Review Board Process Flowchart
Updated DRB Process Flowchart to 2022 View Here
3/15/2022
1
109.07
Updated and reorganized section to clarifying information Compare Here
2/17/2022
1 Supplemental
e-Construction
Updated alpha/numeric standard naming convention lists as of 2/17/2022 View Here
2/3/2022
1 Supplemental
Certified Engineer List
Updated Certified Engineer List for February 2022 View Here
1/18/2022
1 Supplemental
102.02
Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts Compare Here
1/5/2022
1
Final Project Review Report
Updated Final Project Review Report User Guide to September 2020 version Compare Here
1/4/2022
1
102.02
Updated/added Typical Long-Lead Items times for Guardrail-Steel Compare Here
1/4/2022
1 Supplemental
Local Agency Program
Added Archeological and Historical Findings resource View Here
12/14/2021
5
501
Updated 2012 to 2020 Spec Book reference View Here
12/13/2021
1 Supplemental
Certified Engineer List
Updated Certified Engineer List for December 2021 View Here
11/17/2021
1
Bi-Annual FieldManager User Account Verification Process
Updated all content. Compare Here

[top of page]


Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been formatted and organized to follow the MDOT Standard Specifications outline with divisions and sections set up to facilitate easy cross referencing.

Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the MDOT Construction Manual Content Revision Procedures page.


[top of page]