Difference between revisions of "Main Page"
(→Recent Minor Changes: Added changes for 107.01 and new Prevailing Wage page) |
|||
(195 intermediate revisions by 3 users not shown) | |||
Line 23: | Line 23: | ||
=[[Current News|<font color="red">Current News</font>]]= | =[[Current News|<font color="red">Current News</font>]]= | ||
− | ==[[#New | + | ==[[#New AASHTOWare Project Construction & Materials Software Manual|AASHTOWare Project Construction & Materials Software Manual]]== |
− | + | Support for AASHTOware Construction and Materials can be found at the new [https://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page AASHTOWare Project Construction & Materials Software Manual] | |
+ | |||
+ | For any additional support please contact the AASHTOWare Helpdesk email [mailto:MDOT-ConstructionSoftware@michigan.gov MDOT-ConstructionSoftware@michigan.gov] or the FieldManager Helpdesk email [mailto:FieldManager-Admin@michigan.gov FieldManager-Admin@michigan.gov]. | ||
+ | |||
[[File:MI MDOT Software Support.png|center|200px]] | [[File:MI MDOT Software Support.png|center|200px]] | ||
Line 31: | Line 34: | ||
==[[#Recent Major Changes|Recent Major Changes]]== | ==[[#Recent Major Changes|Recent Major Changes]]== | ||
The table below is a list of Major changes. | The table below is a list of Major changes. | ||
− | <div style="overflow:auto; height: | + | <div style="overflow:auto; height:250px; width:800px"> |
{| class="wikitable" style="background:orange; color:black" | {| class="wikitable" style="background:orange; color:black" | ||
!Updated!! Division !! Section !! Summary !! What Changed | !Updated!! Division !! Section !! Summary !! What Changed | ||
|- | |- | ||
− | |<center> | + | |<center>9/26/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[823_-_Water_Mains|823 - Water Mains]]</center>||Added new content to previously empty Section 823 with pictures, video, and re-format to new Construction Manual style.||[https://mdotwiki.state.mi.us/construction/index.php?title=823_-_Water_Mains&type=revision&diff=7654&oldid=6579 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>9/25/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10 - Mix Designs]</center>||Created entire New Division of Construction Manual for Division 10 - Mix Designs with links to Standard Specifications for 1001 - Concrete Production Equipment and Facilities, 1002 - Contractor Quality Control for Concrete, 1003 - Quality Assurance (Acceptance) for Concrete, 1004 - Portland Cement Concrete Mixtures, 1005 - Mortar and Grout Mixtures, and 1006 - Patching, Repair, & Overlay Mixtures.||[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>9/25/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/900_-_Materials Division 9]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/900_-_Materials Division 9 - Materials]</center>||Created entire New Division of Construction Manual for Division 9 Materials with links to Standard Specifications for each of the 23 Sections.||[https://mdotwiki.state.mi.us/construction/index.php/900_-_Materials Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>09/20/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]<center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/E-Signature#Transition_to_OneSpan E-Signature]</center>||Added clarification for Stamp approval of 0582B Moisture & Density Determination form. Also created [[E-Signature#Tranistion_to_OneSpan_.E2.80.93_Frequently_Asked_Signature_Questions|Frequently Asked Signature Questions]] Section on page with signature clarification on 1302, 0501, 1100A, 1165 and 0582B forms||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=7626&oldid=7574 View Here] |
|- | |- | ||
− | |<center> | + | |<center>9/11/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]<center>||<center>[[105.10_Buy_America_Source_of_Steel_and_Iron|105.10 - Buy America Source of Steel and Iron]]</center>||Removal of CFS maintained Buy America certification process.||[https://mdotwiki.state.mi.us/construction/index.php?title=105.10_Buy_America_Source_of_Steel_and_Iron&type=revision&diff=7496&oldid=7012 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>9/7/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501 - Plant Produced Hot Mix Asphalt]]</center>||Updated contents of entire section 501 with pictures, video, and re-format to new Construction Manual style.||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=7488&oldid=6529 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>9/5/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[810_-_Permanent_Traffic_Signs_and_Supports|810 - Permanent Traffic Signs and Supports]]</center>||Updated contents of entire section 810 with pictures, video, and re-format to new Construction Manual style.||[https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports&type=revision&diff=7449&oldid=6245 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>8/30/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[820_-_Traffic_Signals|820 - Traffic Signals]]</center>||Clarification on payment for signal work.||[https://mdotwiki.state.mi.us/construction/index.php?title=820_-_Traffic_Signals&type=revision&diff=7460&oldid=6807 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>8/9/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Construction_Progress_Pay_Estimate_Approval_Process|109.07 - Construction Progress Pay Estimate Approval Process]]</center>||Updated contents of entire section 109.07 to reflect removal of digital signature requirements on Pay Estimates and add examples of PDF approval stamps||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=7257&oldid=7211 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>7/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Structural_Fabrication_Quality_Manual|105 - Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual for 2023 version 3 release.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=7218&oldid=6595 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>07/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance|102.19 - Evaluation of Contractor Performance and Contract Non-Compliance]]</center>||New Section added for Evaluation of Contractor Performance and Contract Non-Compliance||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>07/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[102.01_Prequalification_of_Bidders|102.01 - Prequalification of Bidders]]</center>||Removal of Contractor Performance Evaluation (CPE) process and replacement with [https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance 1165 Notice of Non-Compliance Process] for trunkline projects.||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>06/06/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions|103.02 - Contract Revisions]]</center>||Updated guidance for electronic stamp approvals, AASHTOware software, Supporting Documentation for Extra work, & updated flow chart. Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=7339&oldid=6861 Compare Here] |
+ | |- | ||
+ | |<center>05/24/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Prevailing_Wage|Prevailing Wage]]</center>||Updated Jobsite Posters||[https://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage View Here] | ||
|- | |- | ||
− | |<center> | + | |<center>05/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.06_Furnishing_Right-of-Way|107.06 - Furnishing Right-of-Way]]</center>||New Content added for Contractor Requests to break Limited Access Right-of-Way (LAROW) on Interstates||[https://mdotwiki.state.mi.us/construction/index.php?title=107.06_Furnishing_Right-of-Way&type=revision&diff=7045&oldid=4510 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>05/17/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[204_-_Removing_Miscellaneous_Structures_and_Materials#Vertical_Exploratory_Investigation_for_Relocation|204 - Removing Miscellaneous Structures and Materials]]</center>||Updated language for Vertical Exploratory Investigation for Relocation section||[https://mdotwiki.state.mi.us/construction/index.php?title=204_-_Removing_Miscellaneous_Structures_and_Materials&type=revision&diff=7032&oldid=6942 Compare Here] |
|- | |- | ||
− | |<center> | + | |
+ | |<center>04/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>||Added link to MDOT SESC Pocket Guide||[https://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&type=revision&diff=7008&oldid=6945 Compare Here] | ||
|- | |- | ||
− | |<center> | + | |<center>04/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[FieldManager]]</center>||Updated IDR requirements to replace digital signature with PDF stamp||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6999&oldid=6952 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>04/14/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#MDOT_Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Certified Engineer Process||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&type=revision&diff=6976&oldid=6969 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>03/20/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Signature]]</center>||Updated MDOT Digital Signatures Guidance for One-Span||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6909&oldid=6908 View Here] |
|- | |- | ||
− | |<center> | + | |<center>03/20/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Preconstruction_Meeting|Preconstruction Meeting]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here] |
|- | |- | ||
− | |<center> | + | |<center>03/08/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[108.09_Request_for_Time_Extensions_on_Work_Day,_Calendar_Day,_and_Calendar_Date_Contracts|108.09 - Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts]]</center>||Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09.||[https://mdotwiki.state.mi.us/construction/index.php?title=108.07_Extension_of_Time_on_Work_Day_Contracts&type=revision&diff=6865&oldid=6510 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>10/17/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use|Construction Field Services Indirect Testing Charges]]</center>||Updated content with FY2023 Program Numbers||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View Here] |
|- | |- | ||
− | |<center> | + | |<center>10/11/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Construction_Value_Engineering_Change_Proposal_(VECP)|104 - Construction Value Engineering Change Proposal (VECP)]]</center>||Updated content for Construction Value Engineering Change Proposal (VECP).||[https://mdotwiki.state.mi.us/construction/index.php?title=Construction_Value_Engineering_Change_Proposal_%28VECP%29&type=revision&diff=6808&oldid=6761 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>10/11/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[820_-_Traffic_Signals|820 - Traffic Signals]]</center>||Added new Acceptance of Traffic Signal Work content, including pay item list and form.||[https://mdotwiki.state.mi.us/construction/index.php/820_-_Traffic_Signals#Acceptance_of_Traffice_Signal_Work View Here] |
|- | |- | ||
− | |<center> | + | |<center>9/19/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[FHWA’s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan)|FHWA Risk-Based Project Involvement]]</center>||Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI). References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement. |
+ | ||[https://mdotwiki.state.mi.us/construction/index.php/FHWA%E2%80%99s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) View Here] | ||
|- | |- | ||
− | |<center> | + | |<center>7/21/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General|104.10 - Contractor Claim for Extra Compensation or Time Extension]]</center>||Updated Construction Claims Procedure document with July 2022 version.||[https://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General View Here] |
|- | |- | ||
− | |<center> | + | |<center>6/21/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Temporary_Special_Markings_for_Cold_Weather|811 - Temporary Special Markings for Cold Weather]]</center>||Updated temporary special markings price negotiation costs||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6685&oldid=6666 Compare Here] |
|- | |- | ||
− | |<center>5/ | + | |<center>5/18/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page AASHTOWare Project Construction & Materials Software Manual (Wiki)]</center>||Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki||[https://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page View Here] |
|- | |- | ||
− | |<center> | + | |<center>5/5/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Durable_Pavement_Markings|811 - Permanent Pavement Markings]]</center>||Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6666&oldid=6567 Compare Here] |
|- | |- | ||
− | |<center>4/ | + | |<center>4/19/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf Documentation Guide 2022]</center>||Updated Documentation Guide 2022||[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf View Here] |
|- | |- | ||
− | |<center> | + | |<center>3/16/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Holiday_Traffic_Safety_Provisions|Holiday Traffic Safety Provisions]]</center>||Updated table to project Holiday Traffic Safety Provisions and Closures dates to 2030||[https://mdotwiki.state.mi.us/construction/index.php/Holiday_Traffic_Safety_Provisions View Here] |
|- | |- | ||
− | |<center> | + | |<center>1/4/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Acceptance_of_Work|109.07 - Final Inspection, Acceptance, and Final Payment]]</center>||Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6483&oldid=6380 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>12/21/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09 - Archeological and Historical Findings]]</center>||Updated contents of entire section 107.09 Archeological and Historical Findings||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=6466&oldid=5618 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>11/23/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan|208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>||Created new subsection "Sediment Discharge into Waters of the State of Michigan"||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan View Here] |
|- | |- | ||
− | |<center> | + | |<center>11/17/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#Design_Errors|103.02 - Contract Revisions]]</center>||Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6440&oldid=6436 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>10/27/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#top|103.02 - Contract Revisions]]</center>||Updated content in Section 103.02 Construction Contract Modification Process Overview||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6436&oldid=6403 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>10/18/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY 2022||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here] |
|- | |- | ||
− | |<center> | + | |<center>10/7/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#Construction_Contract_and_Construction_Engineering_Phase_Funding_Revisions|103.02 - Contract Revisions]]</center>||Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6403&oldid=6351 Compare Here] |
|- | |- | ||
− | |<center>9/ | + | |<center>9/28/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[108.01_Subcontracting_of_Contract_Work|108.01 - Subcontracting of Contract Work]]</center>||Updated information in section 108.01 Subcontracting of Contract Work||[https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&type=revision&diff=6385&oldid=6292 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>9/16/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Preconstruction_Meeting|102 - Preconstruction Meeting]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here] |
|- | |- | ||
− | |<center>8/ | + | |<center>9/8/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[108.05_Progress_Schedule|108.05 - Progress Schedule]]</center>||Replaced all information for 108.05 Progress Schedule section ||[https://mdotwiki.state.mi.us/construction/index.php?title=108.05_Progress_Schedule&type=revision&diff=6369&oldid=5269 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>9/2/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07 - Final Inspection, Acceptance, and Final Payment]]</center>|| Updated Final Estimates information and replaced Figure 109-1 ||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6367&oldid=6151 Compare Here] |
|- | |- | ||
− | | | + | |<center>9/1/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Removed table and updated Standard Naming Convention Alpha/Numeric lists||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=6359&oldid=6293 Compare Here] |
− | </ | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | + | |<center>8/25/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#Requirements_for_FHWA_Review_on_Projects_of_Division_Interest_.28PoDI.29|103.02 - Contract Revisions]]</center>||Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6351&oldid=6350 Compare Here] | |
|- | |- | ||
− | |<center> | + | |<center>8/3/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Structural_Fabrication_Quality_Manual|105 - Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual page.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=6347&oldid=6006 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>6/16/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02 - Progress Clause]]</center>||Updated Boilerplate Progress Clause Template document link (revision June 2021)||[https://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause View Here] |
|- | |- | ||
− | |<center> | + | |<center>6/16/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105 - Materials Quality Assurance Procedures Manual]]</center>||Added 2021 MQAP content||[https://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2021_Summary_of_Revisions_to_the_MQAP View Here] |
|- | |- | ||
− | |<center>6/ | + | |<center>6/8/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.01_Laws_to_be_Observed|107.01 - Laws to be Observed]]</center>||Created Section 107.01 Laws to be Observed||[https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed View Here] |
|- | |- | ||
− | |<center> | + | |<center>5/11/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Office_Technician_Process#Office_Technician_Certification_Requirements|Certified Office Technician Process]]</center>||Clarification of Prerequisites for Office Tech Certification||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&type=revision&diff=6216&oldid=6167 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>4/19/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07 - Final Inspection, Acceptance, and Final Payment]]</center>||Updated Final Estimates information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6151&oldid=5946 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>3/15/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Digital_Calculations_for_Payment|104 - Digital Calculations for Payment]]</center>||Created new Digital Calculations for Payment section under Division 1, Section 104||[https://mdotwiki.state.mi.us/construction/index.php/Digital_Calculations_for_Payment View Here] |
|- | |- | ||
− | |<center> | + | |<center>2/9/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[712_-_Bridge_Rehabilitation,_Concrete#Hydrodemolition|712 - Bridge Rehabilitation, Concrete]]</center>||Added the Site Activation/Deactivation information||[http://mdotwiki.state.mi.us/construction/index.php?title=712_-_Bridge_Rehabilitation%2C_Concrete&diff=6115&oldid=5606 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>2/9/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Other_Documentation|715 - Cleaning and Coating Existing Structural Steel]]</center>||Updated information under Item #6, Site Activation/Deactivation||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=6118&oldid=5598 Compare Here] |
|- | |- | ||
− | | | + | |} |
+ | </div> | ||
+ | A definition to the types of changes that you might see in the Construction Manual can be found under [[Content_Revision_Procedures#Types_of_Changes|Content Revision Procedures, Types of Changes]]. | ||
+ | |||
+ | {{top}} | ||
+ | |||
+ | ==[[#Recent Minor Changes|Recent Minor Changes]]== | ||
+ | The table below is a list of Minor changes. | ||
+ | <div style="overflow:auto; height:250px; width:800px"> | ||
+ | {| class="wikitable" style="background:yellow; color:black" | ||
|- | |- | ||
− | + | !Updated!! Division !! Section !! Summary !! What Changed | |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | |<center> | + | |<center>09/21/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/MDOT_DENSITY_TESTING_AND_INSPECTION_MANUAL MDOT Density Testing and Inspection Manual]</center>||Updated links to the [https://www.michigan.gov/mdot/-/media/Project/Websites/MDOT/Business/Construction/Standard-Specifications-Construction/CFS-Manuals/Density-Testing-Inspection-Manual.pdf?rev=6ea61069b3b649e5bbd9362f000a4e0b&hash=44138356CA520616DF23E2E1D8E49AE0 MDOT Density Testing and Inspection Manual]||[https://mdotwiki.state.mi.us/construction/index.php?title=MDOT_DENSITY_TESTING_AND_INSPECTION_MANUAL&type=revision&diff=7659&oldid=7228 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>09/14/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page Main Page]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page#Recent_Major_Changes Recent Major Change Table]</center>||Updated Recent Major Change Table to make all Division and Section Category Items Hyperlinks||[https://mdotwiki.state.mi.us/construction/index.php?title=Main_Page&type=revision&diff=7594&oldid=7584 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>09/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page Main Page]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page#Recent_Minor_Changes Recent Minor Change Table]</center>||Updated Recent Minor Change Table to make all Division and Section Category Items Hyperlinks||[https://mdotwiki.state.mi.us/construction/index.php?title=Main_Page&type=revision&diff=7580&oldid=7497 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>09/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt#Mix_Designs_.26_Job_Mix_Formulas|501 - Mix Designs & Job Mix Formulas]]</center>||Updated example form 1931 SUPERPAVE HMA Design Mix Formula and form 1911 Job Mix Formula (JMF) forms.||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=7559&oldid=7488 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>08/30/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[819_-_Electrical_and_Lighting|819 - Electrical and Lighting]]</center>||Removed outdated language on 2015 Bid Letting.||[https://mdotwiki.state.mi.us/construction/index.php?title=819_-_Electrical_and_Lighting&type=revision&diff=7450&oldid=6575 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>08/30/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT 811 Uniform Price Adjustment]</center>||Added Wet Reflective Paint to Uniform Price Adjustments||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=7461&oldid=6747 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>08/30/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/820_-_Traffic_Signals#Acceptance_of_Traffic_Signal_Work 820 Acceptance of Traffic Signal Work]</center>||Clarified Acceptance Criteria for Traffic Signal Work||[https://mdotwiki.state.mi.us/construction/index.php?title=820_-_Traffic_Signals&type=revision&diff=7452&oldid=6807 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>08/22/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Technology_Support_Resources|Construction Technology Support Resources]]</center>||Updated Construction Technology Support Contacts & Help Desk info.||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Technology_Support_Resources Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>08/22/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance|102.19 Evaluation of Contractor Performance and Contract Non-Compliance]]</center>||Additional info on transition from CPEs to Notice of Non-Compliance added with link to 20SP-102D-01||[https://mdotwiki.state.mi.us/construction/index.php?title=102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance&type=revision&diff=7329&oldid=7222 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>08/21/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt#Surface_Preperation 501 Plant Produced Hot Mix Asphalt - Base Preparation]</center>||Updated Base preparation, Bond Coat Structure Adjustments, Yield Calcs and Milling Sections to include photos & examples||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=7322&oldid=6529 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>07/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Project_Closeout_Escalation_of_Accountability Project Closeout Escalation of Accountability], [[Local_Agency_Program_(LAP)|Local Agency Program (LAP)]], [http://mdotwiki.state.mi.us/construction/index.php/FieldManager FieldManager] [https://mdotwiki.state.mi.us/construction/index.php/104.07_Contractor_Obligations 104.07 Contractor Obligations], [https://mdotwiki.state.mi.us/construction/index.php/102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#Construction_Guidance 102.18 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)], [https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Non-Compliance_of_SESC 208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>||Revised to reflect removal of CPE process and reference Notice of Non-Compliance Process.||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>07/10/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_3 Division 3]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Division_3_Supplemental_Information Division 3 Supplemental Information]</center>||Removed outdated information on MICHIGAN CERTIFIED AGGREGATE TECHICIAN PROGRAM TRANSITION.||[https://mdotwiki.state.mi.us/construction/index.php?title=Division_3_Supplemental_Information&type=revision&diff=7155&oldid=4286 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>07/10/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[102.01_Prequalification_of_Bidders#Processing_of_Contractor_Performance_Evaluations|102.01 Contractor Performance Evaluations]]</center>||Added examples of PDF approval stamps.||[https://mdotwiki.state.mi.us/construction/index.php?title=102.01_Prequalification_of_Bidders&type=revision&diff=7151&oldid=7149 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>07/10/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Prevailing_Wage#Wage_Rate_Interviews|Wage Rate Interviews]]</center>||Added example pdf stamp approval.||[https://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage&type=revision&diff=6960&oldid=6954 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>07/10/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]<center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/E-Signature#Transition_to_OneSpan E-Signature]</center>||Added clarification on Pay Estimate Signature process||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=7141&oldid=7140 View Here] |
|- | |- | ||
− | |<center> | + | |<center>6/20/2023</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/images_construction/1/1c/Documentation_Guide_June_2023.pdf Documentation Guide 2023]</center>||Updated Documentation Guide June 2023||[https://mdotwiki.state.mi.us/images_construction/1/1c/Documentation_Guide_June_2023.pdf View Here] |
|- | |- | ||
− | |<center> | + | |<center>06/06/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[109.05_Payment_for_Contract_Revisions|DOCUMENTING_PRICE_NEGOTIATIONS]]</center>||Updated for FHWA Risk Based Project Involvement.||[https://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&type=revision&diff=7099&oldid=6957 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>04/06/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Prevailing_Wage#Wage_Rate_Interviews|Wage Rate Interviews]]</center>||Added/clarified pdf stamp approval directive and not the use of OneSpan.||[https://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage&type=revision&diff=6960&oldid=6954 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>03/08/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[104.10_Claim_for_Extra_Compensation_or_Extension_of_Time|104.10 Claim for Extra Compensation or Extension of Time]]</center>||Updated contact info for MDOT Construction Contracts Engineer.||[https://mdotwiki.state.mi.us/construction/index.php?title=104.10_Claim_for_Extra_Compensation_or_Extension_of_Time&type=revision&diff=6873&oldid=6834 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>03/07/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions 103.02 Contract Revisions]</center>||Updated Flow Chart for Contract Modifications approval for FHWA RBPI process.||[https://mdotwiki.state.mi.us/images_construction/8/84/Appendix_A_-_Approval_Path_Flow_Chart_UPDATED_3-7-23_Final.pdf View Here] |
|- | |- | ||
− | |<center> | + | |<center>02/16/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer list to February 2023.||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here] |
|- | |- | ||
− | |<center> | + | |<center>02/07/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Project_with_Consultant_Oversight|Project with Consultant Oversight]]</center>||Updated language used.||[https://mdotwiki.state.mi.us/construction/index.php?title=Project_with_Consultant_Oversight&type=revision&diff=6854&oldid=5171 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>12/01/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 11/30/2022||[https://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View Here] |
|- | |- | ||
− | |<center> | + | |<center>11/10/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[109.05_Payment_for_Contract_Revisions|109.05 Payment for Contract Revisions]]</center>||Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages.||[https://mdotwiki.state.mi.us/construction/index.php/109.05_Payment_for_Contract_Revisions#Labor Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>10/18/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[Preconstruction_Meeting#Preconstruction_Meeting_Minutes|Preconstruction Meeting]]</center>||Added verbiage stating preconstruction meetings must not be conducted prior to award of the project.||[https://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&type=revision&diff=6815&oldid=6590 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>10/05/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811 Permanent Pavement Markings]]</center>||Updated Permanent Pavement Markings payment table to include 2022 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>7/20/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_3 Division 3]</center>||<center>[[307_-_Aggregate_Shoulders_and_Approaches#MEASUREMENT_AND_PAYMENT|Aggregate Shoulders and Approaches, Measurement and Payment]]</center>||Updated moisture content change information under Measurement and Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=307_-_Aggregate_Shoulders_and_Approaches&type=revision&diff=6699&oldid=6620 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>7/5/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_.28DRB.29|Dispute Review Board]]</center>||Updated link to public-facing website for DRB and updated pdf file as of July 2022||[https://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&type=revision&diff=6696&oldid=6695 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>7/5/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List to June 2022||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here] |
|- | |- | ||
− | |<center> | + | |<center>6/30/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02 Progress Clause]]</center>||Updated lead times for Steel Pipe pile in excess of 14 inches diameter..., Concrete Beams, and added Precast Box Culverts and Ductile Iron Watermain||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6687&oldid=6675 Compare Here] |
|- | |- | ||
− | |<center>7/ | + | |<center>6/7/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Turbidity_Curtain|208 Soil Erosion and Sedimentation Control (NPDES)]]</center>||Added new Turbidity Curtain section||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Turbidity_Curtain View Here] |
|- | |- | ||
− | |<center> | + | |<center>5/26/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[Process_for_Documenting_Certified_Materials_in_FieldManager|Process for Documenting Certified Materials in FieldManager]]</center>||Updated content and added samples||[https://mdotwiki.state.mi.us/construction/index.php?title=Process_for_Documenting_Certified_Materials_in_FieldManager&type=revision&diff=6682&oldid=6591 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>4/14/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List to April 2022||[https://mdotwiki.state.mi.us/images_construction/e/ec/Engineer_certification_list_-_April_2022.pdf View Here] |
|- | |- | ||
− | |<center> | + | |<center>4/14/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_Process_Flowchart|Dispute Review Board Process Flowchart]]</center>||Updated DRB Process Flowchart to 2022||[https://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)#Dispute_Review_Board_Process_Flowchart View Here] |
|- | |- | ||
− | |<center> | + | |<center>3/15/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109.07 Final Inspection, Acceptance, and Final Payment]]</center>||Updated and reorganized section to clarifying information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6637&oldid=6483 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>2/17/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 2/17/2022||[https://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View Here] |
|- | |- | ||
− | |<center> | + | |<center>2/3/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for February 2022||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here] |
|- | |- | ||
− | |<center> | + | |<center>1/18/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02 Progress Clause]]</center>||Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6530&oldid=6485 Compare Here] |
|- | |- | ||
− | |<center> | + | |<center>1/5/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[Final_Project_Review_Report|Final Project Review Report]]</center>||Updated Final Project Review Report User Guide to September 2020 version||[https://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review_Report&type=revision&diff=6488&oldid=6174 Compare Here] |
|- | |- | ||
− | |<center>4/ | + | |<center>1/4/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02 Progress Clause]]</center>||Updated/added Typical Long-Lead Items times for Guardrail-Steel||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6485&oldid=6353 Compare Here] |
|- | |- | ||
− | |<center>4/ | + | |<center>1/4/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99|Local Agency Program]]</center>||Added Archeological and Historical Findings resource||[https://mdotwiki.state.mi.us/construction/index.php/Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99 View Here] |
− | |||
|- | |- | ||
− | |<center> | + | |<center>12/14/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501 - Plant Produced Hot Mix Asphalt]]</center>||Updated 2012 to 2020 Spec Book reference||[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt View Here] |
|- | |- | ||
− | |<center> | + | |<center>12/13/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for December 2021||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here] |
|- | |- | ||
− | |<center> | + | |<center>11/17/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[FieldManager#Bi-Annual_FieldManager_User_Account_Verification_Process|Bi-Annual FieldManager User Account Verification Process]]</center>||Updated all content.||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6438&oldid=6103 Compare Here] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |- | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|} | |} | ||
Line 277: | Line 253: | ||
{{top}} | {{top}} | ||
+ | |||
+ | ==Sign Up for Updates== | ||
+ | To learn about how to sign up to receive updates related to MDOT's Construction Manual Wiki along with other State of Michigan content check out the video provided below. | ||
+ | |||
+ | <div style="float: center; padding-left: 1px; padding-right: 1px;">{{#ev:youtube|y1g5KLud_uc|300|center|Click here to learn how to sign up for MDOT notifications}}</div> | ||
+ | |||
+ | [[File:ListServ Red Envelope2.PNG|300px|link=https://public.govdelivery.com/accounts/MIDOT/subscriber/new]] | ||
=[[#Preamble|Preamble]]= | =[[#Preamble|Preamble]]= | ||
Line 291: | Line 274: | ||
− | This manual has been | + | This manual has been formatted and organized to follow the MDOT Standard Specifications outline with divisions and sections set up to facilitate easy cross referencing. |
− | |||
− | Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [ | + | Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [https://mdotwikiqa.state.mi.us/construction/index.php/MDOT_Construction_Manual_Content_Revision_Procedures MDOT Construction Manual Content Revision Procedures] page. |
{{top}} | {{top}} | ||
[[Category:Construction Manual]] | [[Category:Construction Manual]] |
Latest revision as of 13:59, 27 September 2023

MDOT Mission Statement
Providing the highest quality integrated transportation services for economic benefit and improved quality of life.
Current News
AASHTOWare Project Construction & Materials Software Manual
Support for AASHTOware Construction and Materials can be found at the new AASHTOWare Project Construction & Materials Software Manual
For any additional support please contact the AASHTOWare Helpdesk email MDOT-ConstructionSoftware@michigan.gov or the FieldManager Helpdesk email FieldManager-Admin@michigan.gov.
Recent Major Changes
The table below is a list of Major changes.
Updated | Division | Section | Summary | What Changed |
---|---|---|---|---|
Added new content to previously empty Section 823 with pictures, video, and re-format to new Construction Manual style. | Compare Here | |||
Created entire New Division of Construction Manual for Division 10 - Mix Designs with links to Standard Specifications for 1001 - Concrete Production Equipment and Facilities, 1002 - Contractor Quality Control for Concrete, 1003 - Quality Assurance (Acceptance) for Concrete, 1004 - Portland Cement Concrete Mixtures, 1005 - Mortar and Grout Mixtures, and 1006 - Patching, Repair, & Overlay Mixtures. | Compare Here | |||
Created entire New Division of Construction Manual for Division 9 Materials with links to Standard Specifications for each of the 23 Sections. | Compare Here | |||
Added clarification for Stamp approval of 0582B Moisture & Density Determination form. Also created Frequently Asked Signature Questions Section on page with signature clarification on 1302, 0501, 1100A, 1165 and 0582B forms | View Here | |||
Removal of CFS maintained Buy America certification process. | Compare Here | |||
Updated contents of entire section 501 with pictures, video, and re-format to new Construction Manual style. | Compare Here | |||
Updated contents of entire section 810 with pictures, video, and re-format to new Construction Manual style. | Compare Here | |||
Clarification on payment for signal work. | Compare Here | |||
Updated contents of entire section 109.07 to reflect removal of digital signature requirements on Pay Estimates and add examples of PDF approval stamps | Compare Here | |||
Updated content on Structural Fabrication Quality Manual for 2023 version 3 release. | Compare Here | |||
New Section added for Evaluation of Contractor Performance and Contract Non-Compliance | Compare Here | |||
Removal of Contractor Performance Evaluation (CPE) process and replacement with 1165 Notice of Non-Compliance Process for trunkline projects. | Compare Here | |||
Updated guidance for electronic stamp approvals, AASHTOware software, Supporting Documentation for Extra work, & updated flow chart. Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k | Compare Here | |||
Updated Jobsite Posters | View Here | |||
New Content added for Contractor Requests to break Limited Access Right-of-Way (LAROW) on Interstates | Compare Here | |||
Updated language for Vertical Exploratory Investigation for Relocation section | Compare Here | |||
Added link to MDOT SESC Pocket Guide | Compare Here | |||
Updated IDR requirements to replace digital signature with PDF stamp | Compare Here | |||
Updated Certified Engineer Process | Compare Here | |||
Updated MDOT Digital Signatures Guidance for One-Span | View Here | |||
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023 | View Here | |||
Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09. | Compare Here | |||
Updated content with FY2023 Program Numbers | View Here | |||
Updated content for Construction Value Engineering Change Proposal (VECP). | Compare Here | |||
Added new Acceptance of Traffic Signal Work content, including pay item list and form. | View Here | |||
Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI). References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement. | View Here | |||
Updated Construction Claims Procedure document with July 2022 version. | View Here | |||
Updated temporary special markings price negotiation costs | Compare Here | |||
Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki | View Here | |||
Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections | Compare Here | |||
Updated Documentation Guide 2022 | View Here | |||
Updated table to project Holiday Traffic Safety Provisions and Closures dates to 2030 | View Here | |||
Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment | Compare Here | |||
Updated contents of entire section 107.09 Archeological and Historical Findings | Compare Here | |||
Created new subsection "Sediment Discharge into Waters of the State of Michigan" | View Here | |||
Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues | Compare Here | |||
Updated content in Section 103.02 Construction Contract Modification Process Overview | Compare Here | |||
Updated the Indirect Testing coding for FY 2022 | View Here | |||
Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same | Compare Here | |||
Updated information in section 108.01 Subcontracting of Contract Work | Compare Here | |||
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021 | View Here | |||
Replaced all information for 108.05 Progress Schedule section | Compare Here | |||
Updated Final Estimates information and replaced Figure 109-1 | Compare Here | |||
Removed table and updated Standard Naming Convention Alpha/Numeric lists | Compare Here | |||
Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity. | Compare Here | |||
Updated content on Structural Fabrication Quality Manual page. | Compare Here | |||
Updated Boilerplate Progress Clause Template document link (revision June 2021) | View Here | |||
Added 2021 MQAP content | View Here | |||
Created Section 107.01 Laws to be Observed | View Here | |||
Clarification of Prerequisites for Office Tech Certification | Compare Here | |||
Updated Final Estimates information | Compare Here | |||
Created new Digital Calculations for Payment section under Division 1, Section 104 | View Here | |||
Added the Site Activation/Deactivation information | Compare Here | |||
Updated information under Item #6, Site Activation/Deactivation | Compare Here |
A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.
Recent Minor Changes
The table below is a list of Minor changes.
Updated | Division | Section | Summary | What Changed |
---|---|---|---|---|
Updated links to the MDOT Density Testing and Inspection Manual | Compare Here | |||
Updated Recent Major Change Table to make all Division and Section Category Items Hyperlinks | Compare Here | |||
Updated Recent Minor Change Table to make all Division and Section Category Items Hyperlinks | Compare Here | |||
Updated example form 1931 SUPERPAVE HMA Design Mix Formula and form 1911 Job Mix Formula (JMF) forms. | Compare Here | |||
Removed outdated language on 2015 Bid Letting. | Compare Here | |||
Added Wet Reflective Paint to Uniform Price Adjustments | Compare Here | |||
Clarified Acceptance Criteria for Traffic Signal Work | Compare Here | |||
Updated Construction Technology Support Contacts & Help Desk info. | Compare Here | |||
Additional info on transition from CPEs to Notice of Non-Compliance added with link to 20SP-102D-01 | Compare Here | |||
Updated Base preparation, Bond Coat Structure Adjustments, Yield Calcs and Milling Sections to include photos & examples | Compare Here | |||
Revised to reflect removal of CPE process and reference Notice of Non-Compliance Process. | Compare Here | |||
Removed outdated information on MICHIGAN CERTIFIED AGGREGATE TECHICIAN PROGRAM TRANSITION. | Compare Here | |||
Added examples of PDF approval stamps. | Compare Here | |||
Added example pdf stamp approval. | Compare Here | |||
Added clarification on Pay Estimate Signature process | View Here | |||
Updated Documentation Guide June 2023 | View Here | |||
Updated for FHWA Risk Based Project Involvement. | Compare Here | |||
Added/clarified pdf stamp approval directive and not the use of OneSpan. | Compare Here | |||
Updated contact info for MDOT Construction Contracts Engineer. | Compare Here | |||
Updated Flow Chart for Contract Modifications approval for FHWA RBPI process. | View Here | |||
Updated Certified Engineer list to February 2023. | View Here | |||
Updated language used. | Compare Here | |||
Updated alpha/numeric standard naming convention lists as of 11/30/2022 | View Here | |||
Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages. | Compare Here | |||
Added verbiage stating preconstruction meetings must not be conducted prior to award of the project. | Compare Here | |||
Updated Permanent Pavement Markings payment table to include 2022 prices | Compare Here | |||
Updated moisture content change information under Measurement and Payment | Compare Here | |||
Updated link to public-facing website for DRB and updated pdf file as of July 2022 | Compare Here | |||
Updated Certified Engineer List to June 2022 | View Here | |||
Updated lead times for Steel Pipe pile in excess of 14 inches diameter..., Concrete Beams, and added Precast Box Culverts and Ductile Iron Watermain | Compare Here | |||
Added new Turbidity Curtain section | View Here | |||
Updated content and added samples | Compare Here | |||
Updated Certified Engineer List to April 2022 | View Here | |||
Updated DRB Process Flowchart to 2022 | View Here | |||
Updated and reorganized section to clarifying information | Compare Here | |||
Updated alpha/numeric standard naming convention lists as of 2/17/2022 | View Here | |||
Updated Certified Engineer List for February 2022 | View Here | |||
Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts | Compare Here | |||
Updated Final Project Review Report User Guide to September 2020 version | Compare Here | |||
Updated/added Typical Long-Lead Items times for Guardrail-Steel | Compare Here | |||
Added Archeological and Historical Findings resource | View Here | |||
Updated 2012 to 2020 Spec Book reference | View Here | |||
Updated Certified Engineer List for December 2021 | View Here | |||
Updated all content. | Compare Here |
Sign Up for Updates
To learn about how to sign up to receive updates related to MDOT's Construction Manual Wiki along with other State of Michigan content check out the video provided below.
Preamble
This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:
- Hold paramount the safety, health, and welfare of the public.
- Perform Services only in areas of their competence.
- Issue public statement only in an objective and truthful manner.
- Act for each employer or client as faithful agents or trustees.
- Avoid deceptive acts.
- Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.
This manual has been formatted and organized to follow the MDOT Standard Specifications outline with divisions and sections set up to facilitate easy cross referencing.
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the MDOT Construction Manual Content Revision Procedures page.