Difference between revisions of "Main Page"

From MediaWiki
Jump to navigation Jump to search
m (→‎Recent Minor Changes: Updated Minor Change Table to reflect recent chance to Section 501 related to yield calculations.)
 
(233 intermediate revisions by 2 users not shown)
Line 23: Line 23:
 
=[[Current News|<font color="red">Current News</font>]]=
 
=[[Current News|<font color="red">Current News</font>]]=
  
==[[#New FieldManager Helpdesk Number|New FieldManager Helpdesk Number]]==
+
==[[#New AASHTOWare Project Construction & Materials Software Manual|AASHTOWare Project Construction & Materials Software Manual]]==
The FieldManager Helpdesk activated its new phone number, '''1-844-4MI-MDOT''' (1-844-464-6368). On the new phone menu, you can reach the FieldManager Helpdesk by selecting option 2 for AASHTOWare and then option 3 for FieldManager. The old number was deactivated on May 1st. The new number is part of the new unified help desk solution, MI MDOT Software Support, used to track and resolve software related issues from customers.
+
Support for AASHTOware Construction and Materials can be found at the new [https://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page AASHTOWare Project Construction & Materials Software Manual]
 +
 
 +
For any additional support please contact the AASHTOWare Helpdesk email [mailto:MDOT-ConstructionSoftware@michigan.gov MDOT-ConstructionSoftware@michigan.gov] or the FieldManager Helpdesk email [mailto:FieldManager-Admin@michigan.gov FieldManager-Admin@michigan.gov].
 +
 
 
[[File:MI MDOT Software Support.png|center|200px]]
 
[[File:MI MDOT Software Support.png|center|200px]]
  
Line 31: Line 34:
 
==[[#Recent Major Changes|Recent Major Changes]]==
 
==[[#Recent Major Changes|Recent Major Changes]]==
 
The table below is a list of Major changes.   
 
The table below is a list of Major changes.   
<div style="overflow:auto; height:200px; width:700px">
+
<div style="overflow:auto; height:350px; width:850px">
 
{| class="wikitable" style="background:orange; color:black"
 
{| class="wikitable" style="background:orange; color:black"
 
!Updated!! Division !! Section !! Summary !! What Changed
 
!Updated!! Division !! Section !! Summary !! What Changed
 
|-
 
|-
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated Boilerplate Progress Clause Template document link (revision June 2021)||[https://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause View Here]
+
|<center>04/08/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=Category:Division_8 Division 8]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=807_-_Guardrail,_Guardrail_Terminals,_and_Miscellaneous_Posts#Guardrail 807_-_Guardrail, Guardrail Terminals, and MiscellaneousPosts]</center>||Updated Section 807 to reflect new guidance on lapping guardrail for temporary traffic shifts. ||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=8222&oldid=6842 Compare Here]
 
|-
 
|-
|<center>6/16/2021</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105]]</center>||Added 2021 MQAP content||[https://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2021_Summary_of_Revisions_to_the_MQAP View Here]
+
|<center>04/02/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[810_-_Permanent_Traffic_Signs_and_Supports|810 - Permanent Traffic Signs and Supports]], [[819_-_Electrical_and_Lighting|819 - Electrical and Lighting]], [[820_-_Traffic_Signals|820 - Traffic Signals]], [[826_Intelligent_Transportation_Systems|826 - Intelligent Transportation Systems]]</center>||Updated contents of 810, 819, 820 & 826 to reflect changes in anchor bolt inspection procedures.||[https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports#INSPECTION_.26_TESTING View Here]
 
|-
 
|-
|<center>6/8/2021</center>||<center>1</center>||<center>[[107.01_Laws_to_be_Observed|107.01]]</center>||Created Section 107.01 Laws to be Observed||[https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed View Here]
+
|<center>04/01/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09 - Archeological and Historical Findings]]</center>||Updated Section 107.09 Archeological and Historical Findings to reflect new contact information for MDOT LAP Archaeologist||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=8222&oldid=6842 Compare Here]
 
|-
 
|-
|<center>5/11/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process#Office_Technician_Certification_Requirements|Certified Office Technician Process]]</center>||Clarification of Prerequisites for Office Tech Certification||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&type=revision&diff=6216&oldid=6167 Compare Here]
+
|<center>02/29/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[710_-_Foundation_Piling|710 - Waterproofing and Protective Covers]]</center>||Major revision to entire section content on Waterproofing and Protective Covers.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=710_-_Waterproofing_and_Protective_Covers View Here]
 
|-
 
|-
|<center>4/19/2021</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07]]</center>||Updated Final Estimates information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6151&oldid=5946 Compare Here]
+
|<center>02/29/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[704_-_Steel_Sheet_Piling_and_Cofferdams|704 - Steel Sheet Piling and Cofferdams]]</center>||Major revision to entire section content on Steel Sheet Piling and Cofferdams.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=704_-_Steel_Sheet_Piling_and_Cofferdams View Here]
 
|-
 
|-
|<center>3/15/2021</center>||<center>1</center>||<center>[[Digital_Calculations_for_Payment|104]]</center>||Created new Digital Calculations for Payment section under Division 1, Section 104||[https://mdotwiki.state.mi.us/construction/index.php/Digital_Calculations_for_Payment View Here]
+
|<center>02/29/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[705_-_Foundation_Piling|705 - Foundation Piling]]</center>||Major revision to entire section content on Foundation Piling.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=705_-_Foundation_Piling#CONSTRUCTION View Here]
 
|-
 
|-
|<center>2/9/2021</center>||<center>7</center>||<center>[[712_-_Bridge_Rehabilitation,_Concrete#Hydrodemolition|712]]</center>||Added the Site Activation/Deactivation information||[http://mdotwiki.state.mi.us/construction/index.php?title=712_-_Bridge_Rehabilitation%2C_Concrete&diff=6115&oldid=5606 Compare Here]
+
|<center>02/13/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[706_-_Structural_Concrete|706 - Structural Concrete]]</center>||Major revision to entire section content on Structural Concrete.  New content, additional pictures/figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=706_-_Structural_Concrete View Here]
 
|-
 
|-
|<center>2/9/2021</center>||<center>7</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Other_Documentation|715]]</center>||Updated information under Item #6, Site Activation/Deactivation||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=6118&oldid=5598 Compare Here]
+
|<center>01/18/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[709_-_Timber_Sturctures|709 - Timber Sturctures]]</center>||Major revision to section content on Timber Bridge Structures.  Addition of pictures, figures, and re-format to new [https://mdotwiki.state.mi.us/construction/index.php?title=CONSTRUCTION_MANUAL_CONTENT_TEMPLATE Construction Manual format].||[https://mdotwiki.state.mi.us/construction/index.php?title=709_-_Timber_Sturctures View Here]
 
|-
 
|-
|<center>10/19/2020</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated Construction Field Services Indirect Testing codes||[http://mdotwiki.state.mi.us/construction/index.php?title=Construction_Field_Services_Indirect_Testing_Charges&diff=6059&oldid=5659 Compare Here]
+
|<center>01/03/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[FHWA’s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan)|FHWA Risk-Based Project Involvement]]</center>||Updated content to include link to 2024 RBPI project list.
 +
||[https://mdotwiki.state.mi.us/construction/index.php?title=FHWA%E2%80%99s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) View Here]
 
|-
 
|-
|<center>9/28/2020</center>||<center>7</center>||<center>[[700_-_Closure_of_Unsafe_Structures|700]]</center>||Created new section 700-Closure of Unsafe Structures under Division 7.||[http://mdotwiki.state.mi.us/construction/index.php/700_-_Closure_of_Unsafe_Structures View Here]
+
|<center>12/05/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=1004_-_Portland_Cement_Concrete_Mixtures 1004 Portland Cement Concrete Mixtures]</center>||Relocated former content in 601 to 1004.  Updates and new content added.||[https://mdotwiki.state.mi.us/construction/index.php?title=1004_-_Portland_Cement_Concrete_Mixtures&type=revision&diff=7745&oldid=7516 Compare Here]
 
|-
 
|-
|<center>9/24/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager#top|FieldManager]]</center>||Added new item Bi-Annual FieldManager User Account Verification Process||[http://mdotwiki.state.mi.us/construction/index.php/FieldManager#Bi-Annual_FieldManager_User_Account_Verification_Process View Here]
+
|<center>11/23/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=1003_-_Quality_Assurance_(Acceptance)_for_Concrete 1003 Quality Assurance for Concrete]</center>||Relocated former content in 605 to 1003.  Updates and new content added.||[https://mdotwiki.state.mi.us/construction/index.php?title=1003_-_Quality_Assurance_%28Acceptance%29_for_Concrete&type=revision&diff=7783&oldid=7739 Compare Here]
 
|-
 
|-
|<center>9/21/2020</center>||<center>1 Supplemental</center>||<center>[[E-Construction#General_Procedures_for_Construction_Records_Retention|E-Construction General Procedures for Construction Records Retention]]</center>||Updated Records Retention content and Training Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=6038&oldid=5982 Compare Here]
+
|<center>11/22/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=1002_-_Contractor_Quality_Control_for_Concrete 1002 Contractor Quality Control for Concrete]</center>||Relocated former content in 604 to 1002.  Updates and new content added.||[https://mdotwiki.state.mi.us/construction/index.php?title=1002_-_Contractor_Quality_Control_for_Concrete&type=revision&diff=7853&oldid=7514 Compare Here]
 
|-
 
|-
|<center>8/12/2020</center>||<center>4</center>||<center>[[Mandrel_Testing_of_Plastic_Pipe|Mandrel Testing of Plastic Pipe]]</center>||A new Mandrel Testing of Plastic Pipe page was created to provide all-inclusive, in-depth descriptions with images. In sections 401 and 402, under Mandrel Testing, there is a link to the new page.||[http://mdotwiki.state.mi.us/construction/index.php/Mandrel_Testing_of_Plastic_Pipe View Here]
+
|<center>10/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY24||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[Local_Agency_Program_(LAP)|Local Agency Program (LAP)]]</center>||Updated Local Agency Program (LAP) guidance including an index for program specific project administration instructions labeled as 'LAP Project Considerations' within various sections of the manual||[http://mdotwiki.state.mi.us/construction/index.php?title=Local_Agency_Program_%28LAP%29&diff=5987&oldid=5715 Compare Here]
+
|<center>10/11/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811 Permanent Pavement Markings]]</center>||Updated Permanent Pavement Markings payment table to include 2023 price adjustments||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&action=historysubmit&type=revision&diff=7717&oldid=7461 Compare Here]
 
|-
 
|-
|<center>8/3/2020</center>||<center>1</center>||<center>[[109.08_Prompt_Payment#Prompt_Payment|109.08]]</center>||Updated MERS User Guide||[http://mdotwiki.state.mi.us/construction/index.php?title=109.08_Prompt_Payment&diff=5997&oldid=5782 Compare Here]
+
|<center>9/26/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[823_-_Water_Mains|823 - Water Mains]]</center>||Added new content to previously empty Section 823 with pictures, video, and re-format to new Construction Manual style.||[https://mdotwiki.state.mi.us/construction/index.php?title=823_-_Water_Mains&type=revision&diff=7654&oldid=6579 Compare Here]
 
|-
 
|-
|<center>7/30/2020</center>||<center>1</center>||<center>[[Structural_Fabrication_Quality_Manual|105]]</center>||Created new Structural Fabrication Quality Manual page under Section 105||[http://mdotwiki.state.mi.us/construction/index.php/Structural_Fabrication_Quality_Manual View Here]
+
|<center>9/25/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10 - Mix Designs]</center>||Created entire New Division of Construction Manual for Division 10 - Mix Designs with links to Standard Specifications for 1001 - Concrete Production Equipment and Facilities, 1002 - Contractor Quality Control for Concrete, 1003 - Quality Assurance (Acceptance) for Concrete, 1004 - Portland Cement Concrete Mixtures, 1005 - Mortar and Grout Mixtures, and 1006 - Patching, Repair, & Overlay Mixtures.||[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Compare Here]
 
|-
 
|-
|<center>7/28/2020</center>||<center>8</center>||<center>[[812_-_Temporary_Traffic_Control_for_Construction_Zone_Operations#top|812]]</center>||Added new subsection "Overhead Sign Covers" with examples||[http://mdotwiki.state.mi.us/construction/index.php/812_-_Temporary_Traffic_Control_for_Construction_Zone_Operations#OVERHEAD_SIGN_COVERS View Here]
+
|<center>9/25/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/900_-_Materials Division 9]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/900_-_Materials Division 9 - Materials]</center>||Created entire New Division of Construction Manual for Division 9 Materials with links to Standard Specifications for each of the 23 Sections.||[https://mdotwiki.state.mi.us/construction/index.php/900_-_Materials Compare Here]
 
|-
 
|-
|<center>7/22/2020</center>||<center>1</center>||<center>[[109.05_Payment_for_Contract_Revisions#Materials|109.05]]</center>||Removed Proof of Payment Requirement for Materials in Force Account||[http://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&diff=5915&oldid=5620 Compare Here]
+
|<center>09/20/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]<center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/E-Signature#Transition_to_OneSpan E-Signature]</center>||Added clarification for Stamp approval of 0582B Moisture & Density Determination form.  Also created [[E-Signature#Tranistion_to_OneSpan_.E2.80.93_Frequently_Asked_Signature_Questions|Frequently Asked Signature Questions]] Section on page with signature clarification on 1302, 0501, 1100A, 1165 and 0582B forms||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=7626&oldid=7574 View Here]
 
|-
 
|-
|<center>7/22/2020</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105]]</center>||Added 2020 MQAP content||[http://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2020_Summary_of_Revision_to_the_MQAP View Here]
+
|<center>9/11/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]<center>||<center>[[105.10_Buy_America_Source_of_Steel_and_Iron|105.10 - Buy America Source of Steel and Iron]]</center>||Removal of CFS maintained Buy America certification process.||[https://mdotwiki.state.mi.us/construction/index.php?title=105.10_Buy_America_Source_of_Steel_and_Iron&type=revision&diff=7496&oldid=7012 Compare Here]
 
|-
 
|-
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[104.07_Contractor_Obligations#Project_.26_Worksite_Safety|104.07]]</center>||Updated content for the Project & Worksite Safety subsection||[http://mdotwiki.state.mi.us/construction/index.php?title=104.07_Contractor_Obligations&action=historysubmit&diff=5871&oldid=5826 Compare Here]
+
|<center>9/7/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501 - Plant Produced Hot Mix Asphalt]]</center>||Updated contents of entire section 501 with pictures, video, and re-format to new Construction Manual style.||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=7488&oldid=6529 Compare Here]
 
|-
 
|-
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[FPR_Frequently_Asked_Questions|FPR Frequently Asked Questions]]</center>||Created a new FPR Frequently Asked Questions page||[http://mdotwiki.state.mi.us/construction/index.php/FPR_Frequently_Asked_Questions View Here]
+
|<center>9/5/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[810_-_Permanent_Traffic_Signs_and_Supports|810 - Permanent Traffic Signs and Supports]]</center>||Updated contents of entire section 810 with pictures, video, and re-format to new Construction Manual style.||[https://mdotwiki.state.mi.us/construction/index.php?title=810_-_Permanent_Traffic_Signs_and_Supports&type=revision&diff=7449&oldid=6245 Compare Here]
 
|-
 
|-
|<center>6/25/2020</center>||<center>1 Supplemental</center>||<center>[[FHWA_CAP_Action_Plans|FHWA CAP Action Plans]]</center>||Created a new FHWA CAP Action Plans page to address IDR issues||[http://mdotwiki.state.mi.us/construction/index.php/FHWA_CAP_Action_Plans View Here]
+
|<center>8/30/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[820_-_Traffic_Signals|820 - Traffic Signals]]</center>||Clarification on payment for signal work.||[https://mdotwiki.state.mi.us/construction/index.php?title=820_-_Traffic_Signals&type=revision&diff=7460&oldid=6807 Compare Here]
 
|-
 
|-
|<center>6/24/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review_Report|Final Project Review Report]]</center>||Created a new Final Project Review Report page||[http://mdotwiki.state.mi.us/construction/index.php/Final_Project_Review_Report View Here]
+
|<center>8/9/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Construction_Progress_Pay_Estimate_Approval_Process|109.07 - Construction Progress Pay Estimate Approval Process]]</center>||Updated contents of entire section 109.07 to reflect removal of digital signature requirements on Pay Estimates and add examples of PDF approval stamps||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=7257&oldid=7211 Compare Here]
 
|-
 
|-
|<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Interim_File_Review|Interim File Review]]</center>||Created a new Interim File Review page||[http://mdotwiki.state.mi.us/construction/index.php/Interim_File_Review View Here]
+
|<center>7/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Structural_Fabrication_Quality_Manual|105 - Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual for 2023 version 3 release.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=7218&oldid=6595 Compare Here]
 
|-
 
|-
|<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109.07]]</center>||Removed the e-File Project Review Procedures from Section 109.07||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5812&oldid=5776 Compare Here]
+
|<center>07/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance|102.19 - Evaluation of Contractor Performance and Contract Non-Compliance]]</center>||New Section added for Evaluation of Contractor Performance and Contract Non-Compliance||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here]
 
|-
 
|-
|<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[Letter_to_File|Letter to File]]</center>||Created a new Letter to File page||[http://mdotwiki.state.mi.us/construction/index.php/Letter_to_File View Here]
+
|<center>07/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[102.01_Prequalification_of_Bidders|102.01 - Prequalification of Bidders]]</center>||Removal of Contractor Performance Evaluation (CPE) process and replacement with [https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance 1165 Notice of Non-Compliance Process] for trunkline projects.||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here]
 
|-
 
|-
|<center>5/13/2020</center>||<center>1 Supplemental</center>||<center>[[Project_Closeout_Escalation_of_Accountability|Project Closeout Escalation of Accountability]]</center>||Created a new Project Closeout Escalation of Accountability page||[http://mdotwiki.state.mi.us/construction/index.php/Project_Closeout_Escalation_of_Accountability View Here]
+
|<center>06/06/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions|103.02 - Contract Revisions]]</center>||Updated guidance for electronic stamp approvals, AASHTOware software, Supporting Documentation for Extra work, & updated flow chart.  Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=7339&oldid=6861 Compare Here]
 +
|-
 +
|<center>05/24/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Prevailing_Wage|Prevailing Wage]]</center>||Updated Jobsite Posters||[https://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage View Here]
 
|-
 
|-
|<center>5/12/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Created a new Final Project Review page||[http://mdotwiki.state.mi.us/construction/index.php/Final_Project_Review View Here]
+
|<center>05/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.06_Furnishing_Right-of-Way|107.06 - Furnishing Right-of-Way]]</center>||New Content added for Contractor Requests to break Limited Access Right-of-Way (LAROW) on Interstates||[https://mdotwiki.state.mi.us/construction/index.php?title=107.06_Furnishing_Right-of-Way&type=revision&diff=7045&oldid=4510 Compare Here]
 
|-
 
|-
|<center>4/28/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Created new Certified Engineer Process page||[http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process View Here]
+
|<center>05/17/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[204_-_Removing_Miscellaneous_Structures_and_Materials#Vertical_Exploratory_Investigation_for_Relocation|204 - Removing Miscellaneous Structures and Materials]]</center>||Updated language for Vertical Exploratory Investigation for Relocation section||[https://mdotwiki.state.mi.us/construction/index.php?title=204_-_Removing_Miscellaneous_Structures_and_Materials&type=revision&diff=7032&oldid=6942 Compare Here]
 
|-
 
|-
|<center>4/21/2020</center>||<center>1</center>||<center>[[109.08_Prompt_Payment|109.08]]</center>||Created new Prompt Payment section with flow chart ||[http://mdotwiki.state.mi.us/construction/index.php/109.08_Prompt_Payment View Here]
+
 
 +
|<center>04/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>||Added link to MDOT SESC Pocket Guide||[https://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&type=revision&diff=7008&oldid=6945 Compare Here]
 
|-
 
|-
|<center>2/12/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02]]</center>||Updated to Boilerplate Progress Clause Template [//{{SERVERNAME}}/images_construction/4/40/Boilerplate_Progress_Clause_Template_2-10-20.docx (Revision 2/10/2020)]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5717&oldid=5567 Compare It]
+
|<center>04/18/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[FieldManager]]</center>||Updated IDR requirements to replace digital signature with PDF stamp||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6999&oldid=6952 Compare Here]
 
|-
 
|-
|<center>01/23/2020</center>||<center>1</center>||<center>[[104.07_Contractor_Obligations#Worker_Visibility|104.07]]</center>||Update to Worker Visibility information and photos||[http://mdotwiki.state.mi.us/construction/index.php?title=104.07_Contractor_Obligations&diff=5710&oldid=4920 Compare It]
+
|<center>04/14/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#MDOT_Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Certified Engineer Process||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&type=revision&diff=6976&oldid=6969 Compare Here]
 
|-
 
|-
|<center>01/21/2020</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Update to Local Agency Boilerplate Preconstruction Meeting Minutes - January 2020||[//{{SERVERNAME}}/images_construction/5/5d/LOCAL_AGENCY_Boilerplate_Preconstruction_Meeting_Minutes_-_January_2020.docx View Here]
+
|<center>03/20/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Signature]]</center>||Updated MDOT Digital Signatures Guidance for One-Span||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6909&oldid=6908 View Here]
 
|-
 
|-
|<center>01/21/2020</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Update for entire Soil Erosion and Sedimentation Control (NPDES) section||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5694&oldid=5664 Compare It]
+
|<center>03/20/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Preconstruction_Meeting|Preconstruction Meeting]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
 
|-
 
|-
|<center>10/22/2019</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use|Construction Field Services Indirect Testing Charges]]</center>||Update for FY 2020 Indirect Testing Coding||[http://mdotwiki.state.mi.us/construction/index.php?title=Construction_Field_Services_Indirect_Testing_Charges&action=historysubmit&diff=5654&oldid=5400 Compare It]
+
|<center>03/08/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[108.09_Request_for_Time_Extensions_on_Work_Day,_Calendar_Day,_and_Calendar_Date_Contracts|108.09 - Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts]]</center>||Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09.||[https://mdotwiki.state.mi.us/construction/index.php?title=108.07_Extension_of_Time_on_Work_Day_Contracts&type=revision&diff=6865&oldid=6510 Compare Here]
 
|-
 
|-
|<center>9/26/2019</center>||<center>1</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual| 105]]</center>||2019 Summary of revisions to the Materials Quality Assurance Procedures Manual ||[http://mdotwiki.state.mi.us/construction/index.php?title=Materials_Quality_Assurance_Procedures_Manual&diff=5642&oldid=5497 Compare It]
+
|<center>10/17/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use|Construction Field Services Indirect Testing Charges]]</center>||Updated content with FY2023 Program Numbers||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges#Inappropriate_Use View Here]
 
|-
 
|-
|<center>9/26/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Field_Inspection_and_Processing_of_Progress_Payments|811]]</center>||Permanent Pavement Markings Field Inspection and Processing of Progress Payments: Updated new content ||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5640&oldid=5632 Compare It]
+
|<center>10/11/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Construction_Value_Engineering_Change_Proposal_(VECP)|104 - Construction Value Engineering Change Proposal (VECP)]]</center>||Updated content for Construction Value Engineering Change Proposal (VECP).||[https://mdotwiki.state.mi.us/construction/index.php?title=Construction_Value_Engineering_Change_Proposal_%28VECP%29&type=revision&diff=6808&oldid=6761 Compare Here]
 
|-
 
|-
|<center>9/18/2019</center>||<center>6</center>||<center>[[602_-_Concrete_Pavement_Construction#Load_Transfer_Assemblies|602]]</center>||Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections||[http://mdotwiki.state.mi.us/construction/index.php?title=602_-_Concrete_Pavement_Construction&diff=5629&oldid=5556 Compare It]
+
|<center>10/11/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[820_-_Traffic_Signals|820 - Traffic Signals]]</center>||Added new Acceptance of Traffic Signal Work content, including pay item list and form.||[https://mdotwiki.state.mi.us/construction/index.php/820_-_Traffic_Signals#Acceptance_of_Traffice_Signal_Work View Here]
 
|-
 
|-
|<center>9/18/2018</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings|811]]</center>||Updated Paint pricing for 2019||[http://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT View Updated Table Here]
+
|<center>9/19/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[FHWA’s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan)|FHWA Risk-Based Project Involvement]]</center>||Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI).  References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement.
 +
||[https://mdotwiki.state.mi.us/construction/index.php/FHWA%E2%80%99s_Risk-Based_Project_Involvement_(RBPI)_Stewardship_%26_Oversight_Plan_(S%26O_Plan) View Here]
 
|-
 
|-
|<center>8/30/2019</center>||<center>1</center>||<center>[[Preconstruction_Meeting|102]]</center>||Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019||[//{{SERVERNAME}}/images_construction/5/5e/TRUNKLINE_Boilerplate_Preconstruction_Meeting_Minutes_2019_Final.docx View Here]
+
|<center>7/21/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General|104.10 - Contractor Claim for Extra Compensation or Time Extension]]</center>||Updated Construction Claims Procedure document with July 2022 version.||[https://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General View Here]
 
|-
 
|-
|<center>8/20/2019</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Standard_Rounding_Convention_Guidance|FieldManager]]</center>||New guidance related to the Standard Rounding Convention ||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5615&oldid=5386 Compare It]
+
|<center>6/21/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Temporary_Special_Markings_for_Cold_Weather|811 - Temporary Special Markings for Cold Weather]]</center>||Updated temporary special markings price negotiation costs||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6685&oldid=6666 Compare Here]
 
|-
 
|-
|<center>7/31/2019</center>||<center>Main Page</center>||<center>Main Page</center>||July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the [//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf#page=3 "e-Final Project Review Procedures"]||[//{{SERVERNAME}}/images_construction/6/6a/Documentation_Guide_Final_Draft_07-29-19.pdf View Here]
+
|<center>5/18/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page AASHTOWare Project Construction & Materials Software Manual (Wiki)]</center>||Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki||[https://mdotwiki.state.mi.us/aashtoware/index.php/Main_Page View Here]
 
|-
 
|-
|}
+
|<center>5/5/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Durable_Pavement_Markings|811 - Permanent Pavement Markings]]</center>||Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6666&oldid=6567 Compare Here]
</div>
+
|-
A definition to the types of changes that you might see in the Construction Manual can be found under [[Content_Revision_Procedures#Types_of_Changes|Content Revision Procedures, Types of Changes]].
+
|<center>4/19/2022</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf Documentation Guide 2022]</center>||Updated Documentation Guide 2022||[https://mdotwiki.state.mi.us/images_construction/5/56/Documentation_Guide_2022_Final_04062022.pdf View Here]
 
+
|-
{{top}}
+
|<center>3/16/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Holiday_Traffic_Safety_Provisions|Holiday Traffic Safety Provisions]]</center>||Updated table to project Holiday Traffic Safety Provisions and Closures dates to 2030||[https://mdotwiki.state.mi.us/construction/index.php/Holiday_Traffic_Safety_Provisions View Here]
 
+
|-
==[[#Recent Minor Changes|Recent Minor Changes]]==
+
|<center>1/4/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Acceptance_of_Work|109.07 - Final Inspection, Acceptance, and Final Payment]]</center>||Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6483&oldid=6380 Compare Here]
The table below is a list of Minor changes.
+
|-
<div style="overflow:auto; height:200px; width:700px">
+
|<center>12/21/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09 - Archeological and Historical Findings]]</center>||Updated contents of entire section 107.09 Archeological and Historical Findings||[https://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&type=revision&diff=6466&oldid=5618 Compare Here]
{| class="wikitable" style="background:yellow; color:black"
+
|-
 +
|<center>11/23/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan|208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>||Created new subsection "Sediment Discharge into Waters of the State of Michigan"||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Sediment_Discharge_into_Waters_of_the_State_of_Michigan View Here]
 +
|-
 +
|<center>11/17/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#Design_Errors|103.02 - Contract Revisions]]</center>||Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6440&oldid=6436 Compare Here]
 +
|-
 +
|<center>10/27/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#top|103.02 - Contract Revisions]]</center>||Updated content in Section 103.02 Construction Contract Modification Process Overview||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6436&oldid=6403 Compare Here]
 
|-
 
|-
!Updated!! Division !! Section !! Summary !! What Changed
+
|<center>10/18/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges|Construction Field Services Indirect Testing Charges]]</center>||Updated the Indirect Testing coding for FY 2022||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Field_Services_Indirect_Testing_Charges View Here]
 
|-
 
|-
|<center>7/26/2021</center>||<center>5</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt#Yield|501]]</center>||Minor Update to correct yield calculation example.||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=6336&oldid=6206 Compare Here]
+
|<center>10/7/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#Construction_Contract_and_Construction_Engineering_Phase_Funding_Revisions|103.02 - Contract Revisions]]</center>||Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6403&oldid=6351 Compare Here]
 
|-
 
|-
|<center>7/20/2021</center>||<center>103.02</center>||<center>[[103.02_Contract_Revisions#Revisions_to_the_Contract|103.02]]</center>||Minor text edits of 103.02 Revisions to the Contract and 2012 to 2020 Spec Book Reference updates.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6333&oldid=6332 Compare Here]
+
|<center>9/28/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[108.01_Subcontracting_of_Contract_Work|108.01 - Subcontracting of Contract Work]]</center>||Updated information in section 108.01 Subcontracting of Contract Work||[https://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&type=revision&diff=6385&oldid=6292 Compare Here]
 
|-
 
|-
|<center>7/14/2021</center>||<center>109.05C</center>||<center>[[109.05_Payment_for_Contract_Revisions#Negotiated_Prices_.28109.05.C.29|109.05C]]</center>||Updated information/language.||[https://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&type=revision&diff=6330&oldid=6317 Compare Here]
+
|<center>9/16/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Preconstruction_Meeting|102 - Preconstruction Meeting]]</center>||Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021||[https://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting View Here]
 
|-
 
|-
|<center>7/13/2021</center>||<center>1</center>||<center>[[Prevailing_Wage|Prevailing Wage]]</center>||Created a new section Prevailing Wage and relocated information here from 107.01 Laws to be Observed.||[https://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage View Here]
+
|<center>9/8/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[108.05_Progress_Schedule|108.05 - Progress Schedule]]</center>||Replaced all information for 108.05 Progress Schedule section ||[https://mdotwiki.state.mi.us/construction/index.php?title=108.05_Progress_Schedule&type=revision&diff=6369&oldid=5269 Compare Here]
 
|-
 
|-
|<center>7/13/2021</center>||<center>1</center>||<center>[[107.01_Laws_to_be_Observed|107.01 Laws to be Observed]]</center>||Moved Prevailing Wage information to a new page.||[https://mdotwiki.state.mi.us/construction/index.php?title=107.01_Laws_to_be_Observed&type=revision&diff=6323&oldid=6277 Compare Here]
+
|<center>9/2/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07 - Final Inspection, Acceptance, and Final Payment]]</center>|| Updated Final Estimates information and replaced Figure 109-1 ||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6367&oldid=6151 Compare Here]
 
|-
 
|-
|<center>7/13/2021</center>||<center>1</center>||<center>[[Force_Account_Work|Force Account Work]]</center>||Created a new section Force Account Work, which cross-references with Section 109.05 Payment for Contract Revisions.||[https://mdotwiki.state.mi.us/construction/index.php/Force_Account_Work View Here]
+
|<center>9/1/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Removed table and updated Standard Naming Convention Alpha/Numeric lists||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=6359&oldid=6293 Compare Here]
 
|-
 
|-
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_.28DRB.29|Dispute Review Board (DRB)]]</center>||Made some text edits and added link to DRB webpage.||[https://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&type=revision&diff=6301&oldid=6169 Compare Here]
+
|<center>8/25/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[103.02_Contract_Revisions#Requirements_for_FHWA_Review_on_Projects_of_Division_Interest_.28PoDI.29|103.02 - Contract Revisions]]</center>||Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity.||[https://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&type=revision&diff=6351&oldid=6350 Compare Here]
 
|-
 
|-
|<center>6/16/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#MDOT_Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Certified Engineer Process section content||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&type=revision&diff=6288&oldid=6280 Compare Here]
+
|<center>8/3/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Structural_Fabrication_Quality_Manual|105 - Structural Fabrication Quality Manual]]</center>||Updated content on Structural Fabrication Quality Manual page.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual&type=revision&diff=6347&oldid=6006 Compare Here]
 
|-
 
|-
|<center>6/8/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations|102.02]]</center>||Updated Progress Clause Template for LAP Projects (May 2021) document||[https://mdotwiki.state.mi.us/images_construction/4/49/Progress_Clause_Template_LAP_projects_2020_Specs_FINAL_05192021_726007_7.pdf View Here]
+
|<center>6/16/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause|102.02 - Progress Clause]]</center>||Updated Boilerplate Progress Clause Template document link (revision June 2021)||[https://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Boilerplate_Progress_Clause View Here]
 
|-
 
|-
|<center>6/8/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Current Certified Engineers]]</center>||Updated certified engineer list to June 2021||[https://mdotwiki.state.mi.us/images_construction/1/11/Engineer_certification_list_-_JUNE_2021.pdf View Here]
+
|<center>6/16/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Materials_Quality_Assurance_Procedures_Manual|105 - Materials Quality Assurance Procedures Manual]]</center>||Added 2021 MQAP content||[https://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual#2021_Summary_of_Revisions_to_the_MQAP View Here]
 
|-
 
|-
|<center>5/24/2021</center>||<center>1 Supplemental</center>||<center>[[E-Signature|E-Signature]]</center>||Edited FHWA Electronic Signature information.||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6262&oldid=6260 Compare Here]
+
|<center>6/8/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[107.01_Laws_to_be_Observed|107.01 - Laws to be Observed]]</center>||Created Section 107.01 Laws to be Observed||[https://mdotwiki.state.mi.us/construction/index.php/107.01_Laws_to_be_Observed View Here]
 
|-
 
|-
|<center>5/20/2021</center>||<center>1 Supplemental</center>||<center>[[E-Signature|E-Signature]]</center>||Added E-Signature Guidance for FHWA staff as non-MDOT users.||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=6260&oldid=6171 Compare Here]
+
|<center>5/11/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Office_Technician_Process#Office_Technician_Certification_Requirements|Certified Office Technician Process]]</center>||Clarification of Prerequisites for Office Tech Certification||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&type=revision&diff=6216&oldid=6167 Compare Here]
 
|-
 
|-
|<center>4/28/2021</center>||<center>1 Supplemental</center>||<center>[[Local_Agency_Program_(LAP)#Local_Agency_Program_Assistance.2FResources|Local Agency Program]]</center>||Updated FieldManager contact info (web address and e-mail).||[https://mdotwiki.state.mi.us/construction/index.php?title=Local_Agency_Program_%28LAP%29&type=revision&diff=6153&oldid=5987 Compare Here]
+
|<center>4/19/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Estimates|109.07 - Final Inspection, Acceptance, and Final Payment]]</center>||Updated Final Estimates information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6151&oldid=5946 Compare Here]
 
|-
 
|-
|<center>3/17/2021</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Material_Documentation|811]]</center>||Updated information on the Permanent Pavement Markings, Material Documentation section.||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=6141&oldid=6047 Compare Here]
+
|<center>3/15/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[Digital_Calculations_for_Payment|104 - Digital Calculations for Payment]]</center>||Created new Digital Calculations for Payment section under Division 1, Section 104||[https://mdotwiki.state.mi.us/construction/index.php/Digital_Calculations_for_Payment View Here]
 
|-
 
|-
|<center>3/3/2021</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Contractor_Obligation|208]]</center>||Revised to add requirement to notify CFS resource specialist when Form 1568 for Project Staging or Excess Material Location on MDOT ROW is approved||[https://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&type=revision&diff=6130&oldid=5694 Compare Here]
+
|<center>2/9/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[712_-_Bridge_Rehabilitation,_Concrete#Hydrodemolition|712 - Bridge Rehabilitation, Concrete]]</center>||Added the Site Activation/Deactivation information||[http://mdotwiki.state.mi.us/construction/index.php?title=712_-_Bridge_Rehabilitation%2C_Concrete&diff=6115&oldid=5606 Compare Here]
 
|-
 
|-
|<center>2/8/2021</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated the Certified Engineer List as of February 2021.||[http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
+
|<center>2/9/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_7 Division 7]</center>||<center>[[715_-_Cleaning_and_Coating_Existing_Structural_Steel#Other_Documentation|715 - Cleaning and Coating Existing Structural Steel]]</center>||Updated information under Item #6, Site Activation/Deactivation||[http://mdotwiki.state.mi.us/construction/index.php?title=715_-_Cleaning_and_Coating_Existing_Structural_Steel&diff=6118&oldid=5598 Compare Here]
 
|-
 
|-
|<center>2/2/2021</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#General|104.10]]</center>||Updated the MDOT Claims Procedure with a revised version.||[http://mdotwiki.state.mi.us/construction/index.php?title=104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension&diff=6107&oldid=5896 Compare Here]
+
|}
 +
</div>
 +
A definition to the types of changes that you might see in the Construction Manual can be found under [[Content_Revision_Procedures#Types_of_Changes|Content Revision Procedures, Types of Changes]].
 +
 
 +
{{top}}
 +
 
 +
==[[#Recent Minor Changes|Recent Minor Changes]]==
 +
The table below is a list of Minor changes. 
 +
<div style="overflow:auto; height:350px; width:850px">
 +
{| class="wikitable" style="background:yellow; color:black"
 
|-
 
|-
|<center>1/6/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Replace the two current subsections; Determination of Work Days and Critical Path Networks, with single section titled [[102.02_Contents_of_Proposal_-_Progress_Clause#Contract_Time_Determination_.28CTD.29|“Contract Time Determination”]]||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=6096&oldid=6094 Compare Here]
+
!Updated!! Division !! Section !! Summary !! What Changed
 +
|-
 +
|<center>04/01/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Prevailing_Wage|Prevailing Wage]]</center>||Updated Fraud and Abuse Card Information||[https://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage&type=revision&diff=8228&oldid=7876 Compare Here]
 
|-
 
|-
|<center>1/5/2021</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Added Controller Cabinet and Detection Equipment to Typical Long-Lead Items Table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=6094&oldid=6045 Compare Here]
+
|<center>02/29/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[108.05_Progress_Schedule|108.05 - Progress Schedule]]</center>||Updated 108.05 Progress Schedule Approval Section and LAP Project Considerations||[https://mdotwiki.state.mi.us/construction/index.php?title=108.05_Progress_Schedule&type=revision&diff=8069&oldid=6734 Compare Here]
 
|-
 
|-
|<center>1/5/2021</center>||<center>4</center>||<center>[[402_-_Storm_Sewers#Illicit_Connections|402]]</center>||Update related to Illicit Connections||[http://mdotwiki.state.mi.us/construction/index.php?title=402_-_Storm_Sewers&diff=6092&oldid=6020 Compare Here]
+
|<center>02/15/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#National_Pollutant_Discharge_Elimination_System_Guidlines|208 Soil Erosion and Sedimentation Control (NPDES)]]</center>||Minor Text update and re-size of Notice of Coverage (NOC) and Notice of Termination (NOT) decision flow charts||[https://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&type=revision&diff=7988&oldid=7526 Compare Changes Here]
 
|-
 
|-
|<center>11/30/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager#Inspector.27s_Daily_Report_.28IDR.29|Inspector's Daily Report]]</center>||Updated instructions||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=6084&oldid=6043 Compare Here]
+
|<center>02/07/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=102.17_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#DBE_Performance_Indicators 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)#DBE Performance Indicators]</center>||Minor revision to DBE CUF violation procedures and Form 4109 ProjectWise workflows.||[https://mdotwiki.state.mi.us/construction/index.php?title=102.17_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_%28DBEs%29&type=revision&diff=7984&oldid=7204 Compare Changes Here]
 
|-
 
|-
|<center>10/29/2020</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes. Also included updated [//{{SERVERNAME}}/images_construction/0/08/Standard_Naming_Convention_Revised_10-29-2020.pdf PDF] and [//{{SERVERNAME}}/images_construction/8/8a/Standard_Naming_Convention_Revised_10-29-2020.xlsx XLSX] files (Rev 10-29-20)||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=6063&oldid=6058 Compare It]
+
|<center>01/31/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt#Segregation 501 Plant Produced Hot Mix Asphalt - Segregation]</center>||Added link to the Michigan Segregation Test Method||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt#Segregation_Testing_Tools View Here]
 
|-
 
|-
|<center>9/24/2020</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811]]</center>||Updated Permanent Pavement Markings payment table to include 2020 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here]
+
|<center>01/11/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Final_Marked_Plans|109.07 Final Inspection, Acceptance, and Final Payment - Final Marked Plans]]</center>||Updated information on As-Built Plan Submittal in ProjectWise for jobs let by e-Proposal||[https://mdotwiki.state.mi.us/images_construction/a/a6/As_Built_Plans_ProjectWise_Submittal_Procedures_2020.pdf View Here]
 +
|-
 +
|<center>01/11/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Prevailing_Wage|Prevailing Wage]]</center>||Updated Jobsite Poster Information - FHWA Contacts||[https://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage#Jobsite_Postings View Here]
 
|-
 
|-
|<center>9/24/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02]]</center>||Added Guardrail-Steel to the Long-Lead item table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=6045&oldid=5947 Compare Here]
+
|<center>01/11/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[Structural_Fabrication_Quality_Manual|105 Structural Fabrication Quality Manual (SFQM)]]</center>||Updated link to newest version of SFQM effective August 2023.||[https://mdotwiki.state.mi.us/construction/index.php?title=Structural_Fabrication_Quality_Manual Compare Here]
 
|-
 
|-
|<center>9/15/2020</center>||<center>Disadvantaged Business Enterprises (DBE)</center>||<center>[[Disadvantaged_Business_Enterprises_(DBE)#Title_VI_Coordinator|Disadvantaged Business Enterprises (DBE)]]</center>||Updated contact information for MDOT's Title VI Coordinator to [mailto:CurryO@michigan.gov Orlando Curry]  517-241-7462||[http://mdotwiki.state.mi.us/construction/index.php?title=Disadvantaged_Business_Enterprises_%28DBE%29&diff=6034&oldid=5825 View Here]
+
|<center>01/10/2024</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=1003_-_Quality_Assurance_(Acceptance)_for_Concrete 1003 Quality Assurance for Concrete]</center>||Added Links to Mix Design Review Tools.||[https://mdotwiki.state.mi.us/construction/index.php?title=1003_-_Quality_Assurance_(Acceptance)_for_Concrete#Mix_Design_Review_Tools Compare Here]
 
|-
 
|-
|<center>8/11/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Record Certification List with added Consultants||[http://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
+
|<center>11/28/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated [https://mdotwiki.state.mi.us/images_construction/0/04/010_Engineer_certification_list_-_NOVEMBER_2023-4.pdf Certified Engineer list] to November 2023.||[https://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&type=revision&diff=7778&oldid=7134 View Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager#LAP_Project_Considerations|FieldManager]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/FieldManager#LAP_Project_Considerations View Here]
+
|<center>11/28/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 11/28/2023||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=7780&oldid=7735 View Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations|Plans, Proposal, Input, Review and Evaluation]]</center>||Added 'LAP Project Considerations' to the section under Design/Construction Package Evaluation||[http://mdotwiki.state.mi.us/construction/index.php/Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations View Here]
+
|<center>11/08/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_10 Division 10]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php?title=1003_-_Quality_Assurance_(Acceptance)_for_Concrete 1003 Quality Assurance (Acceptance) for Concrete]</center>||Added link and information on CFS Concrete Resources Page (Concrete JMF Yield Calculator, Optimized Aggregate Gradation Spreadsheet and Portland Cement PWL worksheet)||[https://mdotwiki.state.mi.us/construction/index.php?title=1003_-_Quality_Assurance_(Acceptance)_for_Concrete4 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations_2|Plans, Proposal, Input, Review and Evaluation]]</center>||Added 'LAP Project Considerations' to the section under Post-Construction Reviews||[http://mdotwiki.state.mi.us/construction/index.php/Plans,_Proposal,_Input,_Review_and_Evaluation#LAP_Project_Considerations_2 View Here]
+
|<center>11/07/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 11/06/2023||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&type=revision&diff=7735&oldid=7665 View Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[Preconstruction_Meeting#LAP_Project_Considerations|102]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Preconstruction_Meeting#LAP_Project_Considerations View Here]
+
|<center>09/21/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/MDOT_DENSITY_TESTING_AND_INSPECTION_MANUAL MDOT Density Testing and Inspection Manual]</center>||Updated links to the [https://www.michigan.gov/mdot/-/media/Project/Websites/MDOT/Business/Construction/Standard-Specifications-Construction/CFS-Manuals/Density-Testing-Inspection-Manual.pdf?rev=6ea61069b3b649e5bbd9362f000a4e0b&hash=44138356CA520616DF23E2E1D8E49AE0 MDOT Density Testing and Inspection Manual]||[https://mdotwiki.state.mi.us/construction/index.php?title=MDOT_DENSITY_TESTING_AND_INSPECTION_MANUAL&type=revision&diff=7659&oldid=7228 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[102.01_Prequalification_of_Bidders#LAP_Project_Considerations|102.01]]</center>||Added 'LAP Project Considerations' to the section under Processing of Contractor Performance Evaluations||[http://mdotwiki.state.mi.us/construction/index.php/102.01_Prequalification_of_Bidders#LAP_Project_Considerations View Here]
+
|<center>09/14/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page Main Page]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page#Recent_Major_Changes Recent Major Change Table]</center>||Updated Recent Major Change Table to make all Division and Section Category Items Hyperlinks||[https://mdotwiki.state.mi.us/construction/index.php?title=Main_Page&type=revision&diff=7594&oldid=7584 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations|102.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#LAP_Project_Considerations View Here]
+
|<center>09/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page Main Page]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Main_Page#Recent_Minor_Changes Recent Minor Change Table]</center>||Updated Recent Minor Change Table to make all Division and Section Category Items Hyperlinks||[https://mdotwiki.state.mi.us/construction/index.php?title=Main_Page&type=revision&diff=7580&oldid=7497 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[Extending_Project_Limits#LAP_Project_Considerations|103]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Extending_Project_Limits#LAP_Project_Considerations View Here]
+
|<center>09/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt#Mix_Designs_.26_Job_Mix_Formulas|501 - Mix Designs & Job Mix Formulas]]</center>||Updated example form 1931 SUPERPAVE HMA Design Mix Formula and form 1911 Job Mix Formula (JMF) forms.||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=7559&oldid=7488 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#LAP_Project_Considerations|103.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions#LAP_Project_Considerations View Here]
+
|<center>08/30/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[819_-_Electrical_and_Lighting|819 - Electrical and Lighting]]</center>||Removed outdated language on 2015 Bid Letting.||[https://mdotwiki.state.mi.us/construction/index.php?title=819_-_Electrical_and_Lighting&type=revision&diff=7450&oldid=6575 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#LAP_Project_Considerations|103.02]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions#LAP_Project_Considerations View Here]
+
|<center>08/30/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/811_-_Permanent_Pavement_Markings#UNIFORM_PRICE_ADJUSTMENT.2C_REGULAR_DRY_PAINT_AND_LOW_TEMPERATURE_WATERBORNE_PAINT 811 Uniform Price Adjustment]</center>||Added Wet Reflective Paint to Uniform Price Adjustments||[https://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&type=revision&diff=7461&oldid=6747 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#LAP_Project_Considerations|104.10]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/104.10_Contractor_Claim_for_Extra_Compensation_or_Time_Extension#LAP_Project_Considerations View Here]
+
|<center>08/30/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/820_-_Traffic_Signals#Acceptance_of_Traffic_Signal_Work 820 Acceptance of Traffic Signal Work]</center>||Clarified Acceptance Criteria for Traffic Signal Work||[https://mdotwiki.state.mi.us/construction/index.php?title=820_-_Traffic_Signals&type=revision&diff=7452&oldid=6807 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[108.07_Extension_of_Time_on_Work_Day_Contracts|108.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/108.07_Extension_of_Time_on_Work_Day_Contracts View Here]
+
|<center>08/22/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Construction_Technology_Support_Resources|Construction Technology Support Resources]]</center>||Updated Construction Technology Support Contacts & Help Desk info.||[https://mdotwiki.state.mi.us/construction/index.php/Construction_Technology_Support_Resources Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[Project_Delays_Due_to_a_Utility_Company#LAP_Project_Considerations|108]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/Project_Delays_Due_to_a_Utility_Company#LAP_Project_Considerations View Here]
+
|<center>08/22/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance|102.19 Evaluation of Contractor Performance and Contract Non-Compliance]]</center>||Additional info on transition from CPEs to Notice of Non-Compliance added with link to 20SP-102D-01||[https://mdotwiki.state.mi.us/construction/index.php?title=102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance&type=revision&diff=7329&oldid=7222 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Acceptance of work||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations View Here]
+
|<center>08/21/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt#Surface_Preperation 501 Plant Produced Hot Mix Asphalt - Base Preparation]</center>||Updated Base preparation, Bond Coat Structure Adjustments, Yield Calcs and Milling Sections to include photos & examples||[https://mdotwiki.state.mi.us/construction/index.php?title=501_-_Plant_Produced_Hot_Mix_Asphalt&type=revision&diff=7322&oldid=6529 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_2|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Pay Estimate and Inactive Project Notification||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_2 View Here]
+
|<center>07/13/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Project_Closeout_Escalation_of_Accountability Project Closeout Escalation of Accountability], [[Local_Agency_Program_(LAP)|Local Agency Program (LAP)]], [http://mdotwiki.state.mi.us/construction/index.php/FieldManager FieldManager] [https://mdotwiki.state.mi.us/construction/index.php/104.07_Contractor_Obligations 104.07 Contractor Obligations], [https://mdotwiki.state.mi.us/construction/index.php/102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#Construction_Guidance 102.18 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)], [https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Non-Compliance_of_SESC 208 - Soil Erosion and Sedimentation Control (NPDES)]]</center>||Revised to reflect removal of CPE process and reference Notice of Non-Compliance Process.||[https://mdotwiki.state.mi.us/construction/index.php/102.19_Evaluation_of_Contractor_Performance_and_Contract_Non-Compliance Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_3|109.07]]</center>||Added 'LAP Project Considerations' to the section under Final Estimates||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_3 View Here]
+
|<center>07/10/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_3 Division 3]</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Division_3_Supplemental_Information Division 3 Supplemental Information]</center>||Removed outdated information on MICHIGAN CERTIFIED AGGREGATE TECHICIAN PROGRAM TRANSITION.||[https://mdotwiki.state.mi.us/construction/index.php?title=Division_3_Supplemental_Information&type=revision&diff=7155&oldid=4286 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_4|109.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_4 View Here]
+
|<center>07/10/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[102.01_Prequalification_of_Bidders#Processing_of_Contractor_Performance_Evaluations|102.01 Contractor Performance Evaluations]]</center>||Added examples of PDF approval stamps.||[https://mdotwiki.state.mi.us/construction/index.php?title=102.01_Prequalification_of_Bidders&type=revision&diff=7151&oldid=7149 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_5|109.07]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_5 View Here]
+
|<center>07/10/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Prevailing_Wage#Wage_Rate_Interviews|Wage Rate Interviews]]</center>||Added example pdf stamp approval.||[https://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage&type=revision&diff=6960&oldid=6954 Compare Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_6|109.07]]</center>||Added 'LAP Project Considerations' to the section under Required Signature on Construction Pay Estimates||[http://mdotwiki.state.mi.us/construction/index.php/109.07_Final_Inspection,_Acceptance,_and_Final_Payment#LAP_Project_Considerations_6 View Here]
+
|<center>07/10/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]<center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/E-Signature#Transition_to_OneSpan E-Signature]</center>||Added clarification on Pay Estimate Signature process||[https://mdotwiki.state.mi.us/construction/index.php?title=E-Signature&type=revision&diff=7141&oldid=7140 View Here]
 
|-
 
|-
|<center>8/4/2020</center>||<center>1 Supplemental</center>||<center>[[E-Construction#LAP_Project_Considerations|e-Construction]]</center>||Added 'LAP Project Considerations' to the section||[http://mdotwiki.state.mi.us/construction/index.php/E-Construction#LAP_Project_Considerations View Here]
+
|<center>6/20/2023</center>||<center>Sidebar</center>||<center>[https://mdotwiki.state.mi.us/images_construction/1/1c/Documentation_Guide_June_2023.pdf Documentation Guide 2023]</center>||Updated Documentation Guide June 2023||[https://mdotwiki.state.mi.us/images_construction/1/1c/Documentation_Guide_June_2023.pdf View Here]
 
|-
 
|-
|<center>7/27/2020</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Construction_Time_Estimates_-_Production_Rates|102.02]]</center>||Updated MDOT Production Rates link. Old link did not work properly.||[http://mdotwiki.state.mi.us/construction/index.php/102.02_Contents_of_Proposal_-_Progress_Clause#Construction_Time_Estimates_-_Production_Rates View Here]
+
|<center>06/06/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[109.05_Payment_for_Contract_Revisions|DOCUMENTING_PRICE_NEGOTIATIONS]]</center>||Updated for FHWA Risk Based Project Involvement.||[https://mdotwiki.state.mi.us/construction/index.php?title=109.05_Payment_for_Contract_Revisions&type=revision&diff=7099&oldid=6957 Compare Here]
 
|-
 
|-
|<center>7/22/2020</center>||<center>1 Supplemental</center>||<center>[[FieldManager|FieldManager]]</center>||Updated Content for Showing Detail Calculations on Inspector’s Daily Report and Added Rounding Convention Example||[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5938&oldid=5875 Compare Here]
+
|<center>04/06/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Prevailing_Wage#Wage_Rate_Interviews|Wage Rate Interviews]]</center>||Added/clarified pdf stamp approval directive and not the use of OneSpan.||[https://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage&type=revision&diff=6960&oldid=6954 Compare Here]
 
|-
 
|-
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[FPR_Frequently_Asked_Questions#How_is_the_Final_Project_Review_Report_updated.3F|FPR Frequently Asked Questions]]</center>||Added FPR Report User Guide link to FPR FAQ page||[http://mdotwiki.state.mi.us/construction/index.php?title=FPR_Frequently_Asked_Questions&diff=5868&oldid=5867 Compare Here]
+
|<center>03/08/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[104.10_Claim_for_Extra_Compensation_or_Extension_of_Time|104.10 Claim for Extra Compensation or Extension of Time]]</center>||Updated contact info for MDOT Construction Contracts Engineer.||[https://mdotwiki.state.mi.us/construction/index.php?title=104.10_Claim_for_Extra_Compensation_or_Extension_of_Time&type=revision&diff=6873&oldid=6834 Compare Here]
 
|-
 
|-
|<center>6/30/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Added FAQs link for Final Project Review to page||[http://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review&diff=5859&oldid=5849 Compare Here]
+
|<center>03/07/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[http://mdotwiki.state.mi.us/construction/index.php/103.02_Contract_Revisions 103.02 Contract Revisions]</center>||Updated Flow Chart for Contract Modifications approval for FHWA RBPI process.||[https://mdotwiki.state.mi.us/images_construction/8/84/Appendix_A_-_Approval_Path_Flow_Chart_UPDATED_3-7-23_Final.pdf View Here]
 
|-
 
|-
|<center>6/24/2020</center>||<center>1 Supplemental</center>||<center>[[Project_Closeout_Escalation_of_Accountability|Project Closeout Escalation of Accountability]]</center>||Added links to the new Final Project Review Report page||[http://mdotwiki.state.mi.us/construction/index.php?title=Project_Closeout_Escalation_of_Accountability&diff=5845&oldid=5815 Compare Here]
+
|<center>02/16/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer list to February 2023.||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>6/17/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Reformatted the Certified Engineer Renewal Process for clarity||[http://mdotwiki.state.mi.us/construction/index.php?title=Certified_Engineer_Process&diff=5841&oldid=5840 Compare Here]
+
|<center>02/07/2023</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Project_with_Consultant_Oversight|Project with Consultant Oversight]]</center>||Updated language used.||[https://mdotwiki.state.mi.us/construction/index.php?title=Project_with_Consultant_Oversight&type=revision&diff=6854&oldid=5171 Compare Here]
 
|-
 
|-
|<center>6/9/2020</center>||<center>1 Supplemental</center>||<center>[[Final_Project_Review|Final Project Review]]</center>||Updated Final Project Review page with Interim File Review link||[http://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review&diff=5831&oldid=5813 Compare Here]
+
|<center>12/01/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 11/30/2022||[https://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View Here]
 
|-
 
|-
|<center>06/01/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certification Programs]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/e/e7/Eng_Record_Cert_list_06-01-2020.pdf View Here]
+
|<center>11/10/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[109.05_Payment_for_Contract_Revisions|109.05 Payment for Contract Revisions]]</center>||Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages.||[https://mdotwiki.state.mi.us/construction/index.php/109.05_Payment_for_Contract_Revisions#Labor Compare Here]
 
|-
 
|-
|<center>5/1/2020</center>||<center>1 Supplemental</center>||<center>[[Dispute_Review_Board_(DRB)| Dispute Review Board (DRB)]]</center>||Added updated DRB Procedures to include those let on and after 6-5-2020/Removed older links||[http://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&diff=5792&oldid=5137 Compare Here]
+
|<center>10/18/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[Preconstruction_Meeting#Preconstruction_Meeting_Minutes|Preconstruction Meeting]]</center>||Added verbiage stating preconstruction meetings must not be conducted prior to award of the project.||[https://mdotwiki.state.mi.us/construction/index.php?title=Preconstruction_Meeting&type=revision&diff=6815&oldid=6590 Compare Here]
 
|-
 
|-
|<center>4/30/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Office_Technician_Process| Certified Office Technician Process]]</center>||Edited page to reflect only Certified Technician Process information||[http://mdotwiki.state.mi.us/construction/index.php?title=Certified_Office_Technician_Process&diff=5787&oldid=5720 Compare Here]
+
|<center>10/05/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_8 Division 8]</center>||<center>[[811_-_Permanent_Pavement_Markings#Uniform_Price_Adjustment.2C_Regular_Dry_Paint_and_Low_Temperature_Waterborne_Paint|811 Permanent Pavement Markings]]</center>||Updated Permanent Pavement Markings payment table to include 2022 prices||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=6047&oldid=5647 Compare Here]
 
|-
 
|-
|<center>4/29/2020</center>||<center>1</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment#Non-Payment_Claims| 109.07]]</center>||Removed "Review of Prompt Payment Complaints" section as it's now its own page||[http://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&diff=5776&oldid=5730 Compare Here]
+
|<center>7/20/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_3 Division 3]</center>||<center>[[307_-_Aggregate_Shoulders_and_Approaches#MEASUREMENT_AND_PAYMENT|Aggregate Shoulders and Approaches, Measurement and Payment]]</center>||Updated moisture content change information under Measurement and Payment||[https://mdotwiki.state.mi.us/construction/index.php?title=307_-_Aggregate_Shoulders_and_Approaches&type=revision&diff=6699&oldid=6620 Compare Here]
 
|-
 
|-
|<center>4/27/2020</center>||<center>1</center>||<center>[[101.04_-_Inspector%27s_Daily_Reports|101.04 Inspector Daily Reports]]<hr>[[FieldManager|FieldManager]]</center>||Updated Helpdesk number from 517-322-1556 to '''1-844-4MI-MDOT''' (1-844-464-6368) in these sections along with the Main page [http://mdotwiki.state.mi.us/construction/index.php/Main_Page#New_FieldManager_Helpdesk_Number Current News] area above
+
|<center>7/5/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_.28DRB.29|Dispute Review Board]]</center>||Updated link to public-facing website for DRB and updated pdf file as of July 2022||[https://mdotwiki.state.mi.us/construction/index.php?title=Dispute_Review_Board_%28DRB%29&type=revision&diff=6696&oldid=6695 Compare Here]
||[http://mdotwiki.state.mi.us/construction/index.php?title=101.04_-_Inspector%27s_Daily_Reports&diff=5765&oldid=1534 Compare Here]<hr>[http://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&diff=5764&oldid=5713 Compare Here]
 
 
|-
 
|-
|<center>4/22/2020</center>||<center>1</center>||<center>[[102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_(DBEs)#Prompt_Payment| 102.18]]</center>||Added the newly created Prompt Payment link to Section 102.18||[http://mdotwiki.state.mi.us/construction/index.php?title=102.18_Subletting_Contract_Work_to_Disadvantaged_Business_Enterprises_%28DBEs%29&diff=5757&oldid=5164 Compare Here]
+
|<center>7/5/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List to June 2022||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>4/15/2020</center>||<center>1</center>||<center>[[105.01_Quality_and_Scope_of_Supply| 105.01]]</center>||Changed Density Control Manual to Density Testing and Inspection Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=105.01_Quality_and_Scope_of_Supply&diff=5747&oldid=5745 Compare Here]
+
|<center>6/30/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02 Progress Clause]]</center>||Updated lead times for Steel Pipe pile in excess of 14 inches diameter..., Concrete Beams, and added Precast Box Culverts and Ductile Iron Watermain||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6687&oldid=6675 Compare Here]
 
|-
 
|-
|<center>4/14/2020</center>||<center>1</center>||<center>[[105.01_Quality_and_Scope_of_Supply| 105.01]]</center>||Changed Density Control Handbook to Density Control Manual||[http://mdotwiki.state.mi.us/construction/index.php?title=105.01_Quality_and_Scope_of_Supply&diff=5745&oldid=4928 Compare Here]
+
|<center>6/7/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_2 Division 2]</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Turbidity_Curtain|208 Soil Erosion and Sedimentation Control (NPDES)]]</center>||Added new Turbidity Curtain section||[https://mdotwiki.state.mi.us/construction/index.php/208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Turbidity_Curtain View Here]
 
|-
 
|-
|<center>3/30/2020</center>||<center>1</center>||<center>[[Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING| 107]]</center>||Updated Jobsite Poster||[http://mdotwiki.state.mi.us/construction/index.php/Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING View Here]
+
|<center>5/26/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[Process_for_Documenting_Certified_Materials_in_FieldManager|Process for Documenting Certified Materials in FieldManager]]</center>||Updated content and added samples||[https://mdotwiki.state.mi.us/construction/index.php?title=Process_for_Documenting_Certified_Materials_in_FieldManager&type=revision&diff=6682&oldid=6591 Compare Here]
 
|-
 
|-
|<center>3/20/2020</center>||<center>1</center>||<center>[[Process_for_Documenting_Certified_Materials_in_FieldManager| 105]]</center>||Deleted information no longer applicable, or is covered in other documents/Renamed section due to changes||[http://mdotwiki.state.mi.us/construction/index.php?title=Process_for_Documenting_Certified_Materials_in_FieldManager&diff=5737&oldid=4931 Compare It]
+
|<center>4/14/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List to April 2022||[https://mdotwiki.state.mi.us/images_construction/e/ec/Engineer_certification_list_-_April_2022.pdf View Here]
 
|-
 
|-
|<center>3/18/2020</center>||<center>1</center>||<center>[[108.01_Subcontracting_of_Contract_Work| 108.01]]</center>||Updated links to the new 1302-Fed form.||[http://mdotwiki.state.mi.us/construction/index.php?title=108.01_Subcontracting_of_Contract_Work&diff=5734&oldid=4975 Compare Here]
+
|<center>4/14/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Dispute_Review_Board_(DRB)#Dispute_Review_Board_Process_Flowchart|Dispute Review Board Process Flowchart]]</center>||Updated DRB Process Flowchart to 2022||[https://mdotwiki.state.mi.us/construction/index.php/Dispute_Review_Board_(DRB)#Dispute_Review_Board_Process_Flowchart View Here]
 
|-
 
|-
|<center>2/21/2020</center>||<center>1</center>||<center>[[103.02_Contract_Revisions#General_Contract_Modification_Information| 103.02]]</center>||General Contract Modification Information Format Revision||[http://mdotwiki.state.mi.us/construction/index.php?title=103.02_Contract_Revisions&diff=5728&oldid=5714 Compare It]
+
|<center>3/15/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[109.07_Final_Inspection,_Acceptance,_and_Final_Payment|109.07 Final Inspection, Acceptance, and Final Payment]]</center>||Updated and reorganized section to clarifying information||[https://mdotwiki.state.mi.us/construction/index.php?title=109.07_Final_Inspection%2C_Acceptance%2C_and_Final_Payment&type=revision&diff=6637&oldid=6483 Compare Here]
 
|-
 
|-
|<center>2/13/2020</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|E-Construction]]</center>||<center>[[Naming_Convention#Standard_Naming_Convention_for_Documents|Standard Naming Convention for Documents]]</center>||Updated Naming Convention Table to reflect recent changes. Also included updated [//{{SERVERNAME}}/images_construction/d/d5/Standard_Naming_Convention_Revised_2-13-20.pdf PDF] and [//{{SERVERNAME}}/images_construction/a/a1/Standard_Naming_Convention_Revised_2-13-20.xlsx XLSX] files (Rev 2-13-20)||[http://mdotwiki.state.mi.us/construction/index.php?title=E-Construction&diff=5726&oldid=5576 Compare It]
+
|<center>2/17/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[E-Construction#e-Construction.2FPaper_File_System|e-Construction]]</center>||Updated alpha/numeric standard naming convention lists as of 2/17/2022||[https://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View Here]
 
|-
 
|-
|<center>02/13/2020</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/7/7a/Eng_Record_Cert_list_02-13-2020.pdf View Here]
+
|<center>2/3/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for February 2022||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>01/22/2020</center>||<center>Prevailing Wage Oversight Procedures</center>||<center>[[Prevailing_Wage_Oversight_Procedures#JOBSITE_POSTING| Jobsite Posting]]</center>||Updated contact information on the Title VI Poster and Coordinator site information||[http://mdotwiki.state.mi.us/construction/index.php?title=Prevailing_Wage_Oversight_Procedures&diff=5703&oldid=5036 Compare It]
+
|<center>1/18/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause|102.02 Progress Clause]]</center>||Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6530&oldid=6485 Compare Here]
 
|-
 
|-
|<center>11/12/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)#Notification_2| 208]]</center>||Soil Erosion and Sedimentation Control Notifications: Updated Notice of Coverage (NOC) and Notice of Termination (NOT) charts||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5663&oldid=5586 Compare It]
+
|<center>1/5/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[Final_Project_Review_Report|Final Project Review Report]]</center>||Updated Final Project Review Report User Guide to September 2020 version||[https://mdotwiki.state.mi.us/construction/index.php?title=Final_Project_Review_Report&type=revision&diff=6488&oldid=6174 Compare Here]
 
|-
 
|-
|<center>10/29/2019</center>||<center>1 Supplemental</center>||<center>[[Construction_Field_Services_Indirect_Testing_Charges#Eligibility_and_Use|Indirect Testing Charges - Eligibility and Use]]</center>||Updated first bullet information for clarity and to include examples||[http://mdotwiki.state.mi.us/construction/index.php?title=Construction_Field_Services_Indirect_Testing_Charges&diff=5659&oldid=5654 Compare It]
+
|<center>1/4/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02 Progress Clause]]</center>||Updated/added Typical Long-Lead Items times for Guardrail-Steel||[https://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&type=revision&diff=6485&oldid=6353 Compare Here]
 
|-
 
|-
|<center>10/28/2019</center>||<center>1 Supplemental</center>||<center>[[Certified_Engineer_Process|Certified Engineer Process]]</center>||Updated Engineer Record Certification List||[//{{SERVERNAME}}/images_construction/4/45/Eng_Record_Cert_list_10-23-19.pdf View Here]
+
|<center>1/4/2022</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99|Local Agency Program]]</center>||Added Archeological and Historical Findings resource||[https://mdotwiki.state.mi.us/construction/index.php/Local_Agency_Program_(LAP)#Construction_Manual_index.2Flinks_for_.E2.80.98LAP_Project_Considerations.E2.80.99 View Here]
 
|-
 
|-
|<center>10/3/2019</center>||<center>8</center>||<center>[[811_-_Permanent_Pavement_Markings#Pavement_Marking_Turn_Arrows|811]]</center>||Removal of references to outdated paint marking turn arrows||[http://mdotwiki.state.mi.us/construction/index.php?title=811_-_Permanent_Pavement_Markings&diff=5647&oldid=5640 Compare It]
+
|<center>12/14/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_5 Division 5]</center>||<center>[[501_-_Plant_Produced_Hot_Mix_Asphalt|501 - Plant Produced Hot Mix Asphalt]]</center>||Updated 2012 to 2020 Spec Book reference||[https://mdotwiki.state.mi.us/construction/index.php/501_-_Plant_Produced_Hot_Mix_Asphalt View Here]
 
|-
 
|-
|<center>8/22/2019</center>||<center>1</center>||<center>[[107.09_Archeological_and_Historical_Findings|107.09]]</center>||Update related to the process for archeological findings||[http://mdotwiki.state.mi.us/construction/index.php?title=107.09_Archeological_and_Historical_Findings&diff=5618&oldid=4933 Compare It]
+
|<center>12/13/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Table_of_Contents_Division_1_Supplemental Division 1 Supplemental]</center>||<center>[[Certified_Engineer_Process#Current_Certified_Engineers|Certified Engineer List]]</center>||Updated Certified Engineer List for December 2021||[https://mdotwiki.state.mi.us/construction/index.php/Certified_Engineer_Process#Current_Certified_Engineers View Here]
 
|-
 
|-
|<center>7/11/2019</center>||<center>2</center>||<center>[[208_-_Soil_Erosion_and_Sedimentation_Control_(NPDES)|208]]</center>||Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)"||[http://mdotwiki.state.mi.us/construction/index.php?title=208_-_Soil_Erosion_and_Sedimentation_Control_%28NPDES%29&diff=5586&oldid=5241 Compare It]
+
|<center>11/17/2021</center>||<center>[https://mdotwiki.state.mi.us/construction/index.php/Category:Division_1 Division 1]</center>||<center>[[FieldManager#Bi-Annual_FieldManager_User_Account_Verification_Process|Bi-Annual FieldManager User Account Verification Process]]</center>||Updated all content.||[https://mdotwiki.state.mi.us/construction/index.php?title=FieldManager&type=revision&diff=6438&oldid=6103 Compare Here]
 
|-
 
|-
 
|}
 
|}
Line 283: Line 308:
  
 
{{top}}
 
{{top}}
 +
 +
==Sign Up for Updates==
 +
To learn about how to sign up to receive updates related to MDOT's Construction Manual Wiki along with other State of Michigan content check out the video provided below.
 +
 +
<div style="float: center; padding-left: 1px; padding-right: 1px;">{{#ev:youtube|y1g5KLud_uc|300|center|Click here to learn how to sign up for MDOT notifications}}</div>
 +
 +
[[File:ListServ Red Envelope2.PNG|300px|link=https://public.govdelivery.com/accounts/MIDOT/subscriber/new]]
  
 
=[[#Preamble|Preamble]]=
 
=[[#Preamble|Preamble]]=
Line 297: Line 329:
  
  
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
+
This manual has been formatted and organized to follow the MDOT Standard Specifications outline with divisions and sections set up to facilitate easy cross referencing.
 
 
  
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [[Help:Contents]] page.
+
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the [https://mdotwikiqa.state.mi.us/construction/index.php/MDOT_Construction_Manual_Content_Revision_Procedures MDOT Construction Manual Content Revision Procedures] page.
  
  
 
{{top}}
 
{{top}}
 
[[Category:Construction Manual]]
 
[[Category:Construction Manual]]

Latest revision as of 17:18, 11 April 2024

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

AASHTOWare Project Construction & Materials Software Manual

Support for AASHTOware Construction and Materials can be found at the new AASHTOWare Project Construction & Materials Software Manual

For any additional support please contact the AASHTOWare Helpdesk email MDOT-ConstructionSoftware@michigan.gov or the FieldManager Helpdesk email FieldManager-Admin@michigan.gov.

MI MDOT Software Support.png

[top of page]


Recent Major Changes

The table below is a list of Major changes.

Updated Division Section Summary What Changed
04/08/2024
Division 8
807_-_Guardrail, Guardrail Terminals, and MiscellaneousPosts
Updated Section 807 to reflect new guidance on lapping guardrail for temporary traffic shifts. Compare Here
04/02/2024
Division 8
810 - Permanent Traffic Signs and Supports, 819 - Electrical and Lighting, 820 - Traffic Signals, 826 - Intelligent Transportation Systems
Updated contents of 810, 819, 820 & 826 to reflect changes in anchor bolt inspection procedures. View Here
04/01/2024
Division 1
107.09 - Archeological and Historical Findings
Updated Section 107.09 Archeological and Historical Findings to reflect new contact information for MDOT LAP Archaeologist Compare Here
02/29/2024
Division 7
710 - Waterproofing and Protective Covers
Major revision to entire section content on Waterproofing and Protective Covers. New content, additional pictures/figures, and re-format to new Construction Manual format. View Here
02/29/2024
Division 7
704 - Steel Sheet Piling and Cofferdams
Major revision to entire section content on Steel Sheet Piling and Cofferdams. New content, additional pictures/figures, and re-format to new Construction Manual format. View Here
02/29/2024
Division 7
705 - Foundation Piling
Major revision to entire section content on Foundation Piling. New content, additional pictures/figures, and re-format to new Construction Manual format. View Here
02/13/2024
Division 7
706 - Structural Concrete
Major revision to entire section content on Structural Concrete. New content, additional pictures/figures, and re-format to new Construction Manual format. View Here
01/18/2024
Division 7
709 - Timber Sturctures
Major revision to section content on Timber Bridge Structures. Addition of pictures, figures, and re-format to new Construction Manual format. View Here
01/03/2024
Division 1 Supplemental
FHWA Risk-Based Project Involvement
Updated content to include link to 2024 RBPI project list. View Here
12/05/2023
Division 10
1004 Portland Cement Concrete Mixtures
Relocated former content in 601 to 1004. Updates and new content added. Compare Here
11/23/2023
Division 10
1003 Quality Assurance for Concrete
Relocated former content in 605 to 1003. Updates and new content added. Compare Here
11/22/2023
Division 10
1002 Contractor Quality Control for Concrete
Relocated former content in 604 to 1002. Updates and new content added. Compare Here
10/18/2023
Division 1 Supplemental
Construction Field Services Indirect Testing Charges
Updated the Indirect Testing coding for FY24 View Here
10/11/2023
Division 8
811 Permanent Pavement Markings
Updated Permanent Pavement Markings payment table to include 2023 price adjustments Compare Here
9/26/2023
Division 8
823 - Water Mains
Added new content to previously empty Section 823 with pictures, video, and re-format to new Construction Manual style. Compare Here
9/25/2023
Division 10
Division 10 - Mix Designs
Created entire New Division of Construction Manual for Division 10 - Mix Designs with links to Standard Specifications for 1001 - Concrete Production Equipment and Facilities, 1002 - Contractor Quality Control for Concrete, 1003 - Quality Assurance (Acceptance) for Concrete, 1004 - Portland Cement Concrete Mixtures, 1005 - Mortar and Grout Mixtures, and 1006 - Patching, Repair, & Overlay Mixtures. Compare Here
9/25/2023
Division 9
Division 9 - Materials
Created entire New Division of Construction Manual for Division 9 Materials with links to Standard Specifications for each of the 23 Sections. Compare Here
09/20/2023
Division 1 Supplemental
E-Signature
Added clarification for Stamp approval of 0582B Moisture & Density Determination form. Also created Frequently Asked Signature Questions Section on page with signature clarification on 1302, 0501, 1100A, 1165 and 0582B forms View Here
9/11/2023
Division 1
105.10 - Buy America Source of Steel and Iron
Removal of CFS maintained Buy America certification process. Compare Here
9/7/2023
Division 5
501 - Plant Produced Hot Mix Asphalt
Updated contents of entire section 501 with pictures, video, and re-format to new Construction Manual style. Compare Here
9/5/2023
Division 8
810 - Permanent Traffic Signs and Supports
Updated contents of entire section 810 with pictures, video, and re-format to new Construction Manual style. Compare Here
8/30/2023
Division 8
820 - Traffic Signals
Clarification on payment for signal work. Compare Here
8/9/2023
Division 1
109.07 - Construction Progress Pay Estimate Approval Process
Updated contents of entire section 109.07 to reflect removal of digital signature requirements on Pay Estimates and add examples of PDF approval stamps Compare Here
7/18/2023
Division 1
105 - Structural Fabrication Quality Manual
Updated content on Structural Fabrication Quality Manual for 2023 version 3 release. Compare Here
07/13/2023
Division 1
102.19 - Evaluation of Contractor Performance and Contract Non-Compliance
New Section added for Evaluation of Contractor Performance and Contract Non-Compliance Compare Here
07/13/2023
Division 1
102.01 - Prequalification of Bidders
Removal of Contractor Performance Evaluation (CPE) process and replacement with 1165 Notice of Non-Compliance Process for trunkline projects. Compare Here
06/06/2023
Division 1
103.02 - Contract Revisions
Updated guidance for electronic stamp approvals, AASHTOware software, Supporting Documentation for Extra work, & updated flow chart. Also the threshold for Original Pay Item increase or decrease changed from $25k to $50k Compare Here
05/24/2023
Division 1 Supplemental
Prevailing Wage
Updated Jobsite Posters View Here
05/18/2023
Division 1
107.06 - Furnishing Right-of-Way
New Content added for Contractor Requests to break Limited Access Right-of-Way (LAROW) on Interstates Compare Here
05/17/2023
Division 2
204 - Removing Miscellaneous Structures and Materials
Updated language for Vertical Exploratory Investigation for Relocation section Compare Here
04/18/2023
Division 2
208 - Soil Erosion and Sedimentation Control (NPDES)
Added link to MDOT SESC Pocket Guide Compare Here
04/18/2023
Division 1 Supplemental
FieldManager
Updated IDR requirements to replace digital signature with PDF stamp Compare Here
04/14/2023
Division 1 Supplemental
Certified Engineer Process
Updated Certified Engineer Process Compare Here
03/20/2023
Division 1 Supplemental
E-Signature
Updated MDOT Digital Signatures Guidance for One-Span View Here
03/20/2023
Division 1 Supplemental
Preconstruction Meeting
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2023 View Here
03/08/2023
Division 1
108.09 - Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts
Updated content for Extension of Time for Work Day, Calendar Day and Calendar Date Contracts and moved content from 108.07 to 108.09. Compare Here
10/17/2022
Division 1 Supplemental
Construction Field Services Indirect Testing Charges
Updated content with FY2023 Program Numbers View Here
10/11/2022
Division 1
104 - Construction Value Engineering Change Proposal (VECP)
Updated content for Construction Value Engineering Change Proposal (VECP). Compare Here
10/11/2022
Division 8
820 - Traffic Signals
Added new Acceptance of Traffic Signal Work content, including pay item list and form. View Here
9/19/2022
Division 1 Supplemental
FHWA Risk-Based Project Involvement
Updated content to remove references to FHWA Projects of Division Interest (PoDI) and replaced with FHWA Risk-Based Project Involvement (RBPI). References now link to the FHWA Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan) page which contains instructions on how to locate each project's S&O Plan in ProjectWise to determine FHWA involvement. View Here
7/21/2022
Division 1
104.10 - Contractor Claim for Extra Compensation or Time Extension
Updated Construction Claims Procedure document with July 2022 version. View Here
6/21/2022
Division 8
811 - Temporary Special Markings for Cold Weather
Updated temporary special markings price negotiation costs Compare Here
5/18/2022
Sidebar
AASHTOWare Project Construction & Materials Software Manual (Wiki)
Added the AASHTOWare Project Construction & Materials Software Manual (Wiki) to the left sidebar of the Construction Manual Wiki View Here
5/5/2022
Division 8
811 - Permanent Pavement Markings
Updated Durable Pavement Markings and Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint sections Compare Here
4/19/2022
Sidebar
Documentation Guide 2022
Updated Documentation Guide 2022 View Here
3/16/2022
Division 1
Holiday Traffic Safety Provisions
Updated table to project Holiday Traffic Safety Provisions and Closures dates to 2030 View Here
1/4/2022
Division 1
109.07 - Final Inspection, Acceptance, and Final Payment
Updated contents of entire section 109.07 Final Inspection, Acceptance, and Final Payment Compare Here
12/21/2021
Division 1
107.09 - Archeological and Historical Findings
Updated contents of entire section 107.09 Archeological and Historical Findings Compare Here
11/23/2021
Division 2
208 - Soil Erosion and Sedimentation Control (NPDES)
Created new subsection "Sediment Discharge into Waters of the State of Michigan" View Here
11/17/2021
Division 1
103.02 - Contract Revisions
Added new section Design Errors and updated information in the Premium Costs for Design Errors and Field Issues Compare Here
10/27/2021
Division 1
103.02 - Contract Revisions
Updated content in Section 103.02 Construction Contract Modification Process Overview Compare Here
10/18/2021
Division 1 Supplemental
Construction Field Services Indirect Testing Charges
Updated the Indirect Testing coding for FY 2022 View Here
10/7/2021
Division 1
103.02 - Contract Revisions
Added new section for Construction Contract and Construction Engineering Phase Funding Revisions as well as LAP Project Considerations update regarding the same Compare Here
9/28/2021
Division 1
108.01 - Subcontracting of Contract Work
Updated information in section 108.01 Subcontracting of Contract Work Compare Here
9/16/2021
Division 1
102 - Preconstruction Meeting
Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes - 2021 View Here
9/8/2021
Division 1
108.05 - Progress Schedule
Replaced all information for 108.05 Progress Schedule section Compare Here
9/2/2021
Division 1
109.07 - Final Inspection, Acceptance, and Final Payment
Updated Final Estimates information and replaced Figure 109-1 Compare Here
9/1/2021
Division 1 Supplemental
e-Construction
Removed table and updated Standard Naming Convention Alpha/Numeric lists Compare Here
8/25/2021
Division 1
103.02 - Contract Revisions
Updated content on Requirements for FHWA Review on Projects of Division Interest (PoDI) and added image for clarity. Compare Here
8/3/2021
Division 1
105 - Structural Fabrication Quality Manual
Updated content on Structural Fabrication Quality Manual page. Compare Here
6/16/2021
Division 1 Supplemental
102.02 - Progress Clause
Updated Boilerplate Progress Clause Template document link (revision June 2021) View Here
6/16/2021
Division 1
105 - Materials Quality Assurance Procedures Manual
Added 2021 MQAP content View Here
6/8/2021
Division 1
107.01 - Laws to be Observed
Created Section 107.01 Laws to be Observed View Here
5/11/2021
Division 1 Supplemental
Certified Office Technician Process
Clarification of Prerequisites for Office Tech Certification Compare Here
4/19/2021
Division 1
109.07 - Final Inspection, Acceptance, and Final Payment
Updated Final Estimates information Compare Here
3/15/2021
Division 1
104 - Digital Calculations for Payment
Created new Digital Calculations for Payment section under Division 1, Section 104 View Here
2/9/2021
Division 7
712 - Bridge Rehabilitation, Concrete
Added the Site Activation/Deactivation information Compare Here
2/9/2021
Division 7
715 - Cleaning and Coating Existing Structural Steel
Updated information under Item #6, Site Activation/Deactivation Compare Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
04/01/2024
Division 1 Supplemental
Prevailing Wage
Updated Fraud and Abuse Card Information Compare Here
02/29/2024
Division 1
108.05 - Progress Schedule
Updated 108.05 Progress Schedule Approval Section and LAP Project Considerations Compare Here
02/15/2024
Division 2
208 Soil Erosion and Sedimentation Control (NPDES)
Minor Text update and re-size of Notice of Coverage (NOC) and Notice of Termination (NOT) decision flow charts Compare Changes Here
02/07/2024
Division 1
102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)#DBE Performance Indicators
Minor revision to DBE CUF violation procedures and Form 4109 ProjectWise workflows. Compare Changes Here
01/31/2024
Division 5
501 Plant Produced Hot Mix Asphalt - Segregation
Added link to the Michigan Segregation Test Method View Here
01/11/2024
Division 1
109.07 Final Inspection, Acceptance, and Final Payment - Final Marked Plans
Updated information on As-Built Plan Submittal in ProjectWise for jobs let by e-Proposal View Here
01/11/2024
Division 1 Supplemental
Prevailing Wage
Updated Jobsite Poster Information - FHWA Contacts View Here
01/11/2024
Division 1
105 Structural Fabrication Quality Manual (SFQM)
Updated link to newest version of SFQM effective August 2023. Compare Here
01/10/2024
Division 10
1003 Quality Assurance for Concrete
Added Links to Mix Design Review Tools. Compare Here
11/28/2023
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer list to November 2023. View Here
11/28/2023
Division 1 Supplemental
e-Construction
Updated alpha/numeric standard naming convention lists as of 11/28/2023 View Here
11/08/2023
Division 10
1003 Quality Assurance (Acceptance) for Concrete
Added link and information on CFS Concrete Resources Page (Concrete JMF Yield Calculator, Optimized Aggregate Gradation Spreadsheet and Portland Cement PWL worksheet) Compare Here
11/07/2023
Division 1 Supplemental
e-Construction
Updated alpha/numeric standard naming convention lists as of 11/06/2023 View Here
09/21/2023
Division 1 Supplemental
MDOT Density Testing and Inspection Manual
Updated links to the MDOT Density Testing and Inspection Manual Compare Here
09/14/2023
Main Page
Recent Major Change Table
Updated Recent Major Change Table to make all Division and Section Category Items Hyperlinks Compare Here
09/13/2023
Main Page
Recent Minor Change Table
Updated Recent Minor Change Table to make all Division and Section Category Items Hyperlinks Compare Here
09/13/2023
Division 5
501 - Mix Designs & Job Mix Formulas
Updated example form 1931 SUPERPAVE HMA Design Mix Formula and form 1911 Job Mix Formula (JMF) forms. Compare Here
08/30/2023
Division 8
819 - Electrical and Lighting
Removed outdated language on 2015 Bid Letting. Compare Here
08/30/2023
Division 8
811 Uniform Price Adjustment
Added Wet Reflective Paint to Uniform Price Adjustments Compare Here
08/30/2023
Division 8
820 Acceptance of Traffic Signal Work
Clarified Acceptance Criteria for Traffic Signal Work Compare Here
08/22/2023
Division 1 Supplemental
Construction Technology Support Resources
Updated Construction Technology Support Contacts & Help Desk info. Compare Here
08/22/2023
Division 1
102.19 Evaluation of Contractor Performance and Contract Non-Compliance
Additional info on transition from CPEs to Notice of Non-Compliance added with link to 20SP-102D-01 Compare Here
08/21/2023
Division 5
501 Plant Produced Hot Mix Asphalt - Base Preparation
Updated Base preparation, Bond Coat Structure Adjustments, Yield Calcs and Milling Sections to include photos & examples Compare Here
07/13/2023
Division 1
Project Closeout Escalation of Accountability, Local Agency Program (LAP), FieldManager 104.07 Contractor Obligations, 102.18 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs), 208 - Soil Erosion and Sedimentation Control (NPDES)]
Revised to reflect removal of CPE process and reference Notice of Non-Compliance Process. Compare Here
07/10/2023
Division 3
Division 3 Supplemental Information
Removed outdated information on MICHIGAN CERTIFIED AGGREGATE TECHICIAN PROGRAM TRANSITION. Compare Here
07/10/2023
Division 1
102.01 Contractor Performance Evaluations
Added examples of PDF approval stamps. Compare Here
07/10/2023
Division 1 Supplemental
Wage Rate Interviews
Added example pdf stamp approval. Compare Here
07/10/2023
Division 1 Supplemental
E-Signature
Added clarification on Pay Estimate Signature process View Here
6/20/2023
Sidebar
Documentation Guide 2023
Updated Documentation Guide June 2023 View Here
06/06/2023
Division 1
DOCUMENTING_PRICE_NEGOTIATIONS
Updated for FHWA Risk Based Project Involvement. Compare Here
04/06/2023
Division 1 Supplemental
Wage Rate Interviews
Added/clarified pdf stamp approval directive and not the use of OneSpan. Compare Here
03/08/2023
Division 1
104.10 Claim for Extra Compensation or Extension of Time
Updated contact info for MDOT Construction Contracts Engineer. Compare Here
03/07/2023
Division 1
103.02 Contract Revisions
Updated Flow Chart for Contract Modifications approval for FHWA RBPI process. View Here
02/16/2023
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer list to February 2023. View Here
02/07/2023
Division 1 Supplemental
Project with Consultant Oversight
Updated language used. Compare Here
12/01/2022
Division 1 Supplemental
e-Construction
Updated alpha/numeric standard naming convention lists as of 11/30/2022 View Here
11/10/2022
Division 1
109.05 Payment for Contract Revisions
Added clarification of acceptable documentation for Force Account Labor on State Funded projects with no Federal Prevailing Wages. Compare Here
10/18/2022
Division 1
Preconstruction Meeting
Added verbiage stating preconstruction meetings must not be conducted prior to award of the project. Compare Here
10/05/2022
Division 8
811 Permanent Pavement Markings
Updated Permanent Pavement Markings payment table to include 2022 prices Compare Here
7/20/2022
Division 3
Aggregate Shoulders and Approaches, Measurement and Payment
Updated moisture content change information under Measurement and Payment Compare Here
7/5/2022
Division 1 Supplemental
Dispute Review Board
Updated link to public-facing website for DRB and updated pdf file as of July 2022 Compare Here
7/5/2022
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer List to June 2022 View Here
6/30/2022
Division 1
102.02 Progress Clause
Updated lead times for Steel Pipe pile in excess of 14 inches diameter..., Concrete Beams, and added Precast Box Culverts and Ductile Iron Watermain Compare Here
6/7/2022
Division 2
208 Soil Erosion and Sedimentation Control (NPDES)
Added new Turbidity Curtain section View Here
5/26/2022
Division 1
Process for Documenting Certified Materials in FieldManager
Updated content and added samples Compare Here
4/14/2022
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer List to April 2022 View Here
4/14/2022
Division 1 Supplemental
Dispute Review Board Process Flowchart
Updated DRB Process Flowchart to 2022 View Here
3/15/2022
Division 1
109.07 Final Inspection, Acceptance, and Final Payment
Updated and reorganized section to clarifying information Compare Here
2/17/2022
Division 1 Supplemental
e-Construction
Updated alpha/numeric standard naming convention lists as of 2/17/2022 View Here
2/3/2022
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer List for February 2022 View Here
1/18/2022
Division 1 Supplemental
102.02 Progress Clause
Updated Typical Long-Lead Items table Lead Times for Delineator and 3# U-Channel Posts Compare Here
1/5/2022
Division 1
Final Project Review Report
Updated Final Project Review Report User Guide to September 2020 version Compare Here
1/4/2022
Division 1
102.02 Progress Clause
Updated/added Typical Long-Lead Items times for Guardrail-Steel Compare Here
1/4/2022
Division 1 Supplemental
Local Agency Program
Added Archeological and Historical Findings resource View Here
12/14/2021
Division 5
501 - Plant Produced Hot Mix Asphalt
Updated 2012 to 2020 Spec Book reference View Here
12/13/2021
Division 1 Supplemental
Certified Engineer List
Updated Certified Engineer List for December 2021 View Here
11/17/2021
Division 1
Bi-Annual FieldManager User Account Verification Process
Updated all content. Compare Here

[top of page]


Sign Up for Updates

To learn about how to sign up to receive updates related to MDOT's Construction Manual Wiki along with other State of Michigan content check out the video provided below.

Click here to learn how to sign up for MDOT notifications

ListServ Red Envelope2.PNG

Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been formatted and organized to follow the MDOT Standard Specifications outline with divisions and sections set up to facilitate easy cross referencing.

Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the MDOT Construction Manual Content Revision Procedures page.


[top of page]