Difference between revisions of "Main Page"
JohnsonN23 (talk | contribs) m (→Recent Major Changes: update) |
JohnsonN23 (talk | contribs) |
||
Line 55: | Line 55: | ||
|- | |- | ||
!Updated!! Division !! Section !! Summary !! What Changed | !Updated!! Division !! Section !! Summary !! What Changed | ||
+ | |- | ||
+ | |<center>11/2/2017</center>||<center>1 Supplemental</center>||<center>[http://mdotwiki.state.mi.us/construction/index.php/E-Construction E-Construction]||Updated table for file naming||[http://mdotwiki.state.mi.us/construction/index.php/E-Construction#e-Construction.2FPaper_File_System View table here] | ||
|- | |- | ||
|<center>11/1/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency|Local Agency]]</center>||Updated coding information for SIGMA||[http://mdotwiki.state.mi.us/construction/index.php/Local_Agency#CHARGING_TIME_TO_LOCAL_AGENCY_PROJECTS View Here] | |<center>11/1/2017</center>||<center>1 Supplemental</center>||<center>[[Local_Agency|Local Agency]]</center>||Updated coding information for SIGMA||[http://mdotwiki.state.mi.us/construction/index.php/Local_Agency#CHARGING_TIME_TO_LOCAL_AGENCY_PROJECTS View Here] |
Revision as of 09:56, 2 November 2017

Foreword
This manual has been prepared to give information and guidance to construction project personnel associated with the Michigan Department of Transportation (MDOT). It is not a part of any contract and therefore is not binding on the contractor. In case of conflict between the Standard Specifications for Construction or contract documents and this manual, the specifications and contract documents will have precedence.
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the Help:Contents page.
Since it's release in April of 2014 there are a total of 5,268 registered users of the MDOT Construction Manual.
MDOT Mission Statement
Providing the highest quality integrated transportation services for economic benefit and improved quality of life.
General Information
Current News
With the first release of the MDOT Wiki Construction Manual there are bound to be some errors. If you find an error on a page please contact the Content Manager for that particular Division located here in the Help page. Some sections are still undergoing content revisions, most have been identified by the Content Managers and are noted as such in the Wiki Constrution Manual.
Content will be revised frequently and a way to monitor what changes have occured recently is by using the Recent changes page. This page will show all major and minor edits along with new users that were created. Pretty much everything that goes on in the Construction Manual. For a more specific listing of content changes you will want to see the Recent Major Changes page or Recent Minor Changes page which contain manually updated lists of content changes for specific sections of the Construction Manual.
Recent Major Changes
The table below is a list of Major changes.
Updated | Division | Section | Summary | What Changed |
---|---|---|---|---|
Updated table for file naming | View table here | |||
Updated coding information for SIGMA | View Here | |||
Added new section for Special Markings for Cold Weather | View Here | |||
Updated Paint pricing for 2017 | View Updated Table Here | |||
Updated Boilerplate Plate Clause Template | open here | |||
2017 Summary of Revision to the manual | ||||
Guidance on new folder in ProjectWise | ||||
New Page specifically for LCPtracker | ||||
Moved progress form 1130 to new section 102.14 | ||||
Changed email for 1302A Forms | New email address here | |||
New coding content | View Coding Guidelines here | |||
Addition of CMU 2017-003, Electronic Read only Files | View Here | |||
Updated Engineer Certification List | Linked Here | |||
Update according to CA 2015-11 with Boiler progress update. | Compare It | |||
Added content according to CA 2015-13 | Compare It | |||
Added content in accordance with CA 2008-01 | Compare It | |||
Added Content according to CA 2013-12, Workers Safety | Compare It | |||
Made adjustments to implement form 1101-SP109 | Compare It | |||
Added Section for Prevailing Wage Classification from CA 2007-15 | View Here | |||
Added Section 11 from CA 2011-12 to CM | Compare It |
A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.
Recent Minor Changes
The table below is a list of Minor changes.
Updated | Division | Section | Summary | What Changed |
---|---|---|---|---|
Moved Contract Modification Process Overview page to 103.02 Contract Revisions | View Here | |||
Updated notification contact information for bridge deck pours and concrete deck overlays | View Update | |||
Changed language from "Approved for Traffic" to "Open to traffic" | ||||
Updated Wording on Post Construction Meeting document | View Here | |||
Added illustration of sidewalk measurement and payment | See Here | |||
Updated Posters to add USERRA Poster | View Here | |||
Updated according CA 2015-06 | Compare It | |||
Updated content according CA 2014-13 | Compare It | |||
Updated content according to CA 2009-16 | Compare It | |||
Updated content from CA 2006-07 | Compare It | |||
Added update from CA 2009-03 to CM | Compare It | |||
Added text from CA 2014-03 | Compare It | |||
Added text update from CA 2013-09 | Compare It | |||
Added links from CA 2009-20 | View Here | |||
Updated reference to CFR and included link | View Here |