Difference between revisions of "Main Page"
m (→Recent Major Changes: Correct link to 102.02 for updated related to productions rates to provide direct link to impacted area of content) |
m (→Recent Minor Changes: updated minor change table to reflect revision to section 102.02 content) |
||
Line 118: | Line 118: | ||
|- | |- | ||
!Updated!! Division !! Section !! Summary !! What Changed | !Updated!! Division !! Section !! Summary !! What Changed | ||
+ | |- | ||
+ | |<center>3/13/2019</center>||<center>1</center>||<center>[[102.02_Contents_of_Proposal_-_Progress_Clause#Progress_Clause|102.02]]</center>||Added Strain Poles to Typical Long-Lead Items table||[http://mdotwiki.state.mi.us/construction/index.php?title=102.02_Contents_of_Proposal_-_Progress_Clause&diff=5514&oldid=5510 Compare It] | ||
|- | |- | ||
|<center>1/22/2019</center>||<center>7</center>||<center>[[718_-_Drilled_Shafts|718]]</center>||Provided clarification relating to [[718_-_Drilled_Shafts#Tremie_Tube_Concrete_Placement|Tremie Tube Concrete Placement]] along with inspection of shaft after [[718_-_Drilled_Shafts#Placing_Steel_Reinforcement|Placing Steel Reinforcement]] cage||[http://mdotwiki.state.mi.us/construction/index.php?title=718_-_Drilled_Shafts&diff=5487&oldid=4248 Compare It] | |<center>1/22/2019</center>||<center>7</center>||<center>[[718_-_Drilled_Shafts|718]]</center>||Provided clarification relating to [[718_-_Drilled_Shafts#Tremie_Tube_Concrete_Placement|Tremie Tube Concrete Placement]] along with inspection of shaft after [[718_-_Drilled_Shafts#Placing_Steel_Reinforcement|Placing Steel Reinforcement]] cage||[http://mdotwiki.state.mi.us/construction/index.php?title=718_-_Drilled_Shafts&diff=5487&oldid=4248 Compare It] |
Revision as of 21:49, 13 March 2019

MDOT Mission Statement
Providing the highest quality integrated transportation services for economic benefit and improved quality of life.
Current News
Documentation Guide
The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content. A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.
Recent Major Changes
The table below is a list of Major changes.
Updated | Division | Section | Summary | What Changed |
---|---|---|---|---|
Removed old production rate information and replaced with new .xlsx file containing updated production rate information | Compare It | |||
New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. | View Here | |||
Updated Contractor Claims Procedure for 2019 | View Here | |||
Updated Boilerplate Progress Clause Template | View Here | |||
Preconstruction Meeting Boilerplate - Trunkline | Compare It | |||
Updated Paint pricing for 2018 | View Updated Table Here | |||
2018 Summary of Revisions to the manual | Compare It | |||
Provided New Table for "Typical Long Lead Time Items" along with updating to the latest "Boilerplate Progress Clause Template 5-30-15" | Compare It | |||
Update to Purpose of Review. | Compare It | |||
Addition of Notice of termination section. | view here | |||
Overhaul of information for section 708 | compare | |||
Overhaul of information for section 707 | compare | |||
12/19/2017 | Updated Engineer Certification List | Linked Here | ||
Update about Post Construction Information | View Here | |||
Updated Boilerplate Progress Clause Template | View Here | |||
New Preamble for Construction Manual | ||||
New format for Standard Naming Convention | ||||
Updated LDPR coding | View here | |||
Updated table for file naming | View table here | |||
Updated coding information for SIGMA | View Here | |||
Added new section for Special Markings for Cold Weather | View Here | |||
Updated Paint pricing for 2017 | View Updated Table Here | |||
2017 Summary of Revision to the manual | ||||
Guidance on new folder in ProjectWise | ||||
New Page specifically for LCPtracker | ||||
Moved progress form 1130 to new section 102.14 | ||||
Changed email for 1302A Forms | New email address here | |||
New coding content | View Coding Guidelines here | |||
Addition of CMU 2017-003, Electronic Read only Files | View Here | |||
Update according to CA 2015-11 with Boiler progress update. | Compare It | |||
Added content according to CA 2015-13 | Compare It | |||
Added content in accordance with CA 2008-01 | Compare It | |||
Added Content according to CA 2013-12, Workers Safety | Compare It | |||
Made adjustments to implement form 1101-SP109 | Compare It | |||
Added Section for Prevailing Wage Classification from CA 2007-15 | View Here |
A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.
Recent Minor Changes
The table below is a list of Minor changes.
Updated | Division | Section | Summary | What Changed |
---|---|---|---|---|
Added Strain Poles to Typical Long-Lead Items table | Compare It | |||
Provided clarification relating to Tremie Tube Concrete Placement along with inspection of shaft after Placing Steel Reinforcement cage | Compare It | |||
Clarification related to small tools for Force Account Work | Compare It | |||
Updated Engineer Record Certification List | View Here | |||
Updated Engineer Record Certification List | View Here | |||
Updated content related to Inspector Daily Reports and noting visual acceptance of material | Compare It | |||
Updated Title VI Poster | View Here | |||
Changed contact info to Mike Deboer and added direction to Claims Database in ProjectWise | Compare It | |||
Changed roller speed calculation from 23.36 mph to 2.36 mph | section here | |||
Moved content from 102.14 to 108.05 | ||||
Renamed page and moved structures progress clause to this section | Compare It | |||
Separated "other" page into separate pages | ||||
Updated content related to Commercially Useful Function (CUF). Part of CMU 2017-005 | Compare It | |||
Update to page and ProjectWise directions | ||||
Updated examples for Calc forms | ||||
Removed 'Disincentive' from manual language | ||||
Moved Contract Modification Process Overview page to 103.02 Contract Revisions | View Here | |||
Updated notification contact information for bridge deck pours and concrete deck overlays | View Update | |||
Changed language from "Approved for Traffic" to "Open to traffic" | ||||
Added illustration of sidewalk measurement and payment | See Here | |||
Updated Posters to add USERRA Poster | View Here | |||
Updated according CA 2015-06 | Compare It | |||
Updated content according CA 2014-13 | Compare It | |||
Updated content according to CA 2009-16 | Compare It | |||
Updated content from CA 2006-07 | Compare It | |||
Added update from CA 2009-03 to CM | Compare It | |||
Added text from CA 2014-03 | Compare It | |||
Added text update from CA 2013-09 | Compare It | |||
Added links from CA 2009-20 | View Here | |||
Updated reference to CFR and included link | View Here |
Preamble
This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:
- Hold paramount the safety, health, and welfare of the public.
- Perform Services only in areas of their competence.
- Issue public statement only in an objective and truthful manner.
- Act for each employer or client as faithful agents or trustees.
- Avoid deceptive acts.
- Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.
This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.
Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the Help:Contents page.