Main Page

From MediaWiki
Revision as of 07:52, 19 October 2020 by SchaeferS (talk | contribs) (→‎Recent Major Changes: Updated Construction Field Services Indirect Testing codes)
Jump to navigation Jump to search

www.michigan.gov/mdot


CONSTRUCTION MANUAL


Logo.jpg


Bureau of Field Services
Construction Field Services Division

Box culvert construction on M-10 in Clare County.

MDOT Mission Statement

Providing the highest quality integrated transportation services for economic benefit and improved quality of life.


Current News

New FieldManager Helpdesk Number

The FieldManager Helpdesk activated its new phone number, 1-844-4MI-MDOT (1-844-464-6368). On the new phone menu, you can reach the FieldManager Helpdesk by selecting option 2 for AASHTOWare and then option 3 for FieldManager. The old number was deactivated on May 1st. The new number is part of the new unified help desk solution, MI MDOT Software Support, used to track and resolve software related issues from customers.

MI MDOT Software Support.png

[top of page]


Recent Major Changes

The table below is a list of Major changes.

Updated Division Section Summary What Changed
10/19/2020
1 Supplimental
Construction Field Services Indirect Testing Charges
Updated Construction Field Services Indirect Testing codes Compare Here
9/28/2020
7
700
Created new section 700-Closure of Unsafe Structures under Division 7. View Here
9/24/2020
1 Supplemental
FieldManager
Added new item Bi-Annual FieldManager User Account Verification Process View Here
9/21/2020
1 Supplemental
E-Construction General Procedures for Construction Records Retention
Updated Records Retention content and Training Manual Compare Here
8/12/2020
4
Mandrel Testing of Plastic Pipe
A new Mandrel Testing of Plastic Pipe page was created to provide all-inclusive, in-depth descriptions with images. In sections 401 and 402, under Mandrel Testing, there is a link to the new page. View Here
8/4/2020
1 Supplemental
Local Agency Program (LAP)
Updated Local Agency Program (LAP) guidance including an index for program specific project administration instructions labeled as 'LAP Project Considerations' within various sections of the manual Compare Here
8/3/2020
1
109.08
Updated MERS User Guide Compare Here
7/30/2020
1
105
Created new Structural Fabrication Quality Manual page under Section 105 View Here
7/28/2020
8
812
Added new subsection "Overhead Sign Covers" with examples View Here
7/22/2020
1
109.05
Removed Proof of Payment Requirement for Materials in Force Account Compare Here
7/22/2020
1
105
Added 2020 MQAP content View Here
6/30/2020
1 Supplemental
104.07
Updated content for the Project & Worksite Safety subsection Compare Here
6/30/2020
1 Supplemental
FPR Frequently Asked Questions
Created a new FPR Frequently Asked Questions page View Here
6/25/2020
1 Supplemental
FHWA CAP Action Plans
Created a new FHWA CAP Action Plans page to address IDR issues View Here
6/24/2020
1 Supplemental
Final Project Review Report
Created a new Final Project Review Report page View Here
6/9/2020
1 Supplemental
Interim File Review
Created a new Interim File Review page View Here
5/13/2020
1 Supplemental
109.07
Removed the e-File Project Review Procedures from Section 109.07 Compare Here
5/13/2020
1 Supplemental
Letter to File
Created a new Letter to File page View Here
5/13/2020
1 Supplemental
Project Closeout Escalation of Accountability
Created a new Project Closeout Escalation of Accountability page View Here
5/12/2020
1 Supplemental
Final Project Review
Created a new Final Project Review page View Here
4/28/2020
1 Supplemental
Certified Engineer Process
Created new Certified Engineer Process page View Here
4/21/2020
1
109.08
Created new Prompt Payment section with flow chart View Here
2/12/2020
1
102.02
Updated to Boilerplate Progress Clause Template (Revision 2/10/2020) Compare It
01/23/2020
1
104.07
Update to Worker Visibility information and photos Compare It
01/21/2020
1
102
Update to Local Agency Boilerplate Preconstruction Meeting Minutes - January 2020 View Here
01/21/2020
2
208
Update for entire Soil Erosion and Sedimentation Control (NPDES) section Compare It
10/22/2019
1 Supplemental
Construction Field Services Indirect Testing Charges
Update for FY 2020 Indirect Testing Coding Compare It
9/26/2019
1
105
2019 Summary of revisions to the Materials Quality Assurance Procedures Manual Compare It
9/26/2019
8
811
Permanent Pavement Markings Field Inspection and Processing of Progress Payments: Updated new content Compare It
9/18/2019
6
602
Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections Compare It
9/18/2018
8
811
Updated Paint pricing for 2019 View Updated Table Here
8/30/2019
1
102
Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019 View Here
8/20/2019
1 Supplemental
FieldManager
New guidance related to the Standard Rounding Convention Compare It
7/31/2019
Main Page
Main Page
July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the "e-Final Project Review Procedures" View Here

A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes.

[top of page]


Recent Minor Changes

The table below is a list of Minor changes.

Updated Division Section Summary What Changed
9/24/2020
8
811
Updated Permanent Pavement Markings payment table to include 2020 prices Compare Here
9/24/2020
1
102.02
Added Guardrail-Steel to the Long-Lead item table Compare Here
9/15/2020
Disadvantaged Business Enterprises (DBE)
Disadvantaged Business Enterprises (DBE)
Updated contact information for MDOT's Title VI Coordinator to Orlando Curry 517-241-7462 View Here
8/11/2020
1 Supplemental
Certified Engineer Process
Updated Record Certification List with added Consultants View Here
8/4/2020
1 Supplemental
FieldManager
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1 Supplemental
Plans, Proposal, Input, Review and Evaluation
Added 'LAP Project Considerations' to the section under Design/Construction Package Evaluation View Here
8/4/2020
1 Supplemental
Plans, Proposal, Input, Review and Evaluation
Added 'LAP Project Considerations' to the section under Post-Construction Reviews View Here
8/4/2020
1
102
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
102.01
Added 'LAP Project Considerations' to the section under Processing of Contractor Performance Evaluations View Here
8/4/2020
1
102.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
103.02
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
104.10
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
108.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
108
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Acceptance of work View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Inspection, Acceptance, and Final Payment-Pay Estimate and Inactive Project Notification View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Final Estimates View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section View Here
8/4/2020
1
109.07
Added 'LAP Project Considerations' to the section under Required Signature on Construction Pay Estimates View Here
8/4/2020
1 Supplemental
e-Construction
Added 'LAP Project Considerations' to the section View Here
7/27/2020
1
102.02
Updated MDOT Production Rates link. Old link did not work properly. View Here
7/22/2020
1 Supplemental
FieldManager
Updated Content for Showing Detail Calculations on Inspector’s Daily Report and Added Rounding Convention Example Compare Here
6/30/2020
1 Supplemental
FPR Frequently Asked Questions
Added FPR Report User Guide link to FPR FAQ page Compare Here
6/30/2020
1 Supplemental
Final Project Review
Added FAQs link for Final Project Review to page Compare Here
6/24/2020
1 Supplemental
Project Closeout Escalation of Accountability
Added links to the new Final Project Review Report page Compare Here
6/17/2020
1 Supplemental
Certified Engineer Process
Reformatted the Certified Engineer Renewal Process for clarity Compare Here
6/9/2020
1 Supplemental
Final Project Review
Updated Final Project Review page with Interim File Review link Compare Here
06/01/2020
1 Supplemental
Certification Programs
Updated Engineer Record Certification List View Here
5/1/2020
1 Supplemental
Dispute Review Board (DRB)
Added updated DRB Procedures to include those let on and after 6-5-2020/Removed older links Compare Here
4/30/2020
1 Supplemental
Certified Office Technician Process
Edited page to reflect only Certified Technician Process information Compare Here
4/29/2020
1
109.07
Removed "Review of Prompt Payment Complaints" section as it's now its own page Compare Here
4/27/2020
1
101.04 Inspector Daily Reports
FieldManager
Updated Helpdesk number from 517-322-1556 to 1-844-4MI-MDOT (1-844-464-6368) in these sections along with the Main page Current News area above Compare Here
Compare Here
4/22/2020
1
102.18
Added the newly created Prompt Payment link to Section 102.18 Compare Here
4/15/2020
1
105.01
Changed Density Control Manual to Density Testing and Inspection Manual Compare Here
4/14/2020
1
105.01
Changed Density Control Handbook to Density Control Manual Compare Here
3/30/2020
1
107
Updated Jobsite Poster View Here
3/20/2020
1
105
Deleted information no longer applicable, or is covered in other documents/Renamed section due to changes Compare It
3/18/2020
1
108.01
Updated links to the new 1302-Fed form. Compare Here
2/21/2020
1
103.02
General Contract Modification Information Format Revision Compare It
2/13/2020
E-Construction
Standard Naming Convention for Documents
Updated Naming Convention Table to reflect recent changes. Also included updated PDF and XLSX files (Rev 2-13-20) Compare It
02/13/2020
1 Supplemental
Certified Engineer Process
Updated Engineer Record Certification List View Here
01/22/2020
Prevailing Wage Oversight Procedures
Jobsite Posting
Updated contact information on the Title VI Poster and Coordinator site information Compare It
11/12/2019
2
208
Soil Erosion and Sedimentation Control Notifications: Updated Notice of Coverage (NOC) and Notice of Termination (NOT) charts Compare It
10/29/2019
1 Supplemental
Indirect Testing Charges - Eligibility and Use
Updated first bullet information for clarity and to include examples Compare It
10/28/2019
1 Supplemental
Certified Engineer Process
Updated Engineer Record Certification List View Here
10/3/2019
8
811
Removal of references to outdated paint marking turn arrows Compare It
8/22/2019
1
107.09
Update related to the process for archeological findings Compare It
7/11/2019
2
208
Added 2 flowcharts for Notice of Coverage (NOC) and Notice of Termination (NOT) in section 208 between “Notification” and “Training”. Also updated language to reflect recent name change of the "Michigan Department of Environmental Quality (MDEQ)" to the "Michigan Department of Environment, Great Lakes, and Energy (EGLE)" Compare It

[top of page]


Preamble

This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:

  1. Hold paramount the safety, health, and welfare of the public.
  2. Perform Services only in areas of their competence.
  3. Issue public statement only in an objective and truthful manner.
  4. Act for each employer or client as faithful agents or trustees.
  5. Avoid deceptive acts.
  6. Conduct themselves honorably, reasonably, ethically and lawfully so as to enhance the honor, reputation, and usefulness of the profession.


This manual has been revised throughout to incorporate changes brought about by the release of the 2012 Standard Specifications for Construction and by progress in equipment, construction practices, and materials. The format has been established to follow the standard specification outline with divisions and sections set up to facilitate revision and addition of new information as needed.


Additional information about the Wiki Construction Manual and submitting revision suggestions is located in the Help:Contents page.


[top of page]