Main Page

MDOT Mission Statement
Providing the highest quality integrated transportation services for economic benefit and improved quality of life.
Current News
Documentation Guide
The NEW Documentation Guide is now available to replace the former "Minimum Documentation Guide" content (Updated July 2019). A link to the new "Documentation Guide" has been established in the Side Bar to the left. It can also be accessed by clicking on the thumbnail below.
Recent Major Changes
The table below is a list of Major changes.
Updated | Division | Section | Summary | What Changed | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Load Transfer Assemblies: Updated new content and included Presentation for Load Transfer Assemblies Inspections | Compare It | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Updated Paint pricing for 2019 | View Updated Table Here | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Update to Trunkline Boilerplate Preconstruction Meeting Minutes - 2019 | View Here | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
New guidance related to the Standard Rounding Convention | Compare It | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
July update to the Documentation Guide which includes corrections related to density requirements. It also includes updated language related to the "e-Final Project Review Procedures" | View Here | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Updated: Final Project Review Procedures to the new "e-Final Project Review Procedures" | Compare It | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Updated to Boilerplate Progress Clause Template | Compare It | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Updates and clarifications related to Detailed Contract Modification Information area as well as the Design Issue/Premium Costs area related to Contract Revisions | Compare It | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Provided link to current Local Agency Programs Section Federal Guidelines | Compare It | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Preconstruction Meeting Minutes Boilerplate - Local Agency | Compare It | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Removed old production rate information and replaced with new .xlsx file containing updated production rate information | Compare It | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
New Documentation Guide is now available to replace former "Minimum Documentation Guide" content. Link to the "Documentation Guide" also established in Side Bar to the left. | View Here | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Updated Contractor Claims Procedure for 2019 | View Here | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Updated Boilerplate Progress Clause Template | View Here | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Preconstruction Meeting Minutes Boilerplate - Trunkline | Compare It | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Updated Paint pricing for 2018 | View Updated Table Here
A definition to the types of changes that you might see in the Construction Manual can be found under Content Revision Procedures, Types of Changes. Recent Minor ChangesThe table below is a list of Minor changes.
PreambleThis manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that professionals use a combination of technical skills and judgment in decision making. Engineering judgment is necessary to allow decisions to account for unique site-specific conditions and considerations to provide high quality products, within budget, and to protect the public health, safety, and welfare. This manual provides the general operational guidelines; however, it is understood that adaptation, adjustments, and deviations are sometimes necessary. Innovation is a key foundational element to advance the state of engineering practice and develop more effective and efficient engineering solutions and materials. As such, it is essential that our engineering manuals provide a vehicle to promote, pilot, or implement technologies or practices that provide efficiencies and quality products, while maintaining the safety, health, and welfare of the public. It is expected when making significant or impactful deviations from the technical information from these guidance materials, that reasonable consultations with experts, technical committees, and/or policy setting bodies occur prior to actions within the timeframes allowed. It is also expected that these consultations will eliminate any potential conflicts of interest, perceived or otherwise. MDOT Leadership is committed to a culture of innovation to optimize engineering solutions. The National Society of Professional Engineers Code of Ethics for Engineering is founded on six fundamental canons. Those canons are provided below. Engineers, in the fulfillment of their professional duties, shall:
|