Difference between revisions of "Materials Quality Assurance Procedures Manual"

From MediaWiki
Jump to navigation Jump to search
m
(Replaced content with " <div style="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual Email this Page]</di...")
Tag: Replaced
 
(20 intermediate revisions by 4 users not shown)
Line 1: Line 1:
<center>[http://mdotcf.state.mi.us/public/specbook/files/2012/105%20Control%20of%20Materials.pdf 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 105]</center>
+
 
 
<div style="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual Email this Page]</div>
 
<div style="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual Email this Page]</div>
  
Materials Quality Assurance (QA) sampling and testing procedures described in this manual have been developed by Michigan Department of Transportation (MDOT) in accordance with Title 23, of The Code of Federal Regulations, Part 637.  Objectives of the program include the design and implementation of sampling and testing procedures to assure that materials are in reasonably close conformity with plans and specifications.  The Materials QA program includes acceptance sampling and testing, independent assurance testing, project materials certification, retention of sampling and testing records, verification of test procedures, calibration of testing apparatus and participation in the development and implementation of technical training for personnel involved in materials sampling and testing.
+
Materials Quality Assurance (QA) sampling and testing procedures described in this manual have been developed by Michigan Department of Transportation (MDOT) in accordance with [https://ecfr.io/Title-23/sp23.1.637.b 23 CFR 637].  Objectives of the program include the design and implementation of sampling and testing procedures to assure that materials are in reasonably close conformity with plans and specifications.  The Materials QA program includes acceptance sampling and testing, independent assurance testing, project materials certification, retention of sampling and testing records, verification of test procedures, calibration of testing apparatus and participation in the development and implementation of technical training for personnel involved in materials sampling and testing.
 
 
The Materials Quality Assurance Procedures Manual is found at the following link:
 
http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367-207980--,00.html
 
 
 
===[[#2016 Summary of Revisions to the MQAP|2016 Summary of Revisions to the MQAP]]===
 
The Construction Field Services (CFS) Division has revised the Materials Quality Assurance Procedures (MQAP) Manual.  A brief description of the major revisions is presented below.
 
 
 
'''<u>Manual Section</u>'''
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=20 1.08]    Revised this chapter to include methods of tagging samples.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=40 3.01]    Revised the Certification Documentation requirements.  Eliminated the quantity requirement, clarified that the material can be certified by the contractor, and included language to clarify the general certification requirements of QPL products.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=67 3.07]    Revised this chapter to include slag cement.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=69 3.08]    Revised this chapter to include submittal requirements for qualifying new facilities.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=72 3.09]    Deleted chapter 3.09 Temporary Concrete Barrier in its entirety and replaced it with Concrete Pipe, Culvert, and Related Items, previously chapter 3.10.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=72 3.10]    Revised this chapter to remove the fabrication inspection and acceptance of culverts, revised to chapter 3.09.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=83 4.04]    Significant revisions to this chapter have occurred.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=94 4.05]    Significant revisions to this chapter have occurred.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=108 4.06] Significant revisions to this chapter have occurred.  Combined chapter 4.10 (Tower Lighting Unit Fabrication) and 4.11 (Traffic Signal Mast Arm Pole and Mast Arm) into this chapter.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=125 4.10] Replaced with new chapter Temporary Traffic Control Certification and Acceptance Procedure.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=128 4.11]Replaced with new chapter Non-Prestressed Structural Precast Concrete Fabrication.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=139 4.13]Significant revisions to this chapter have occurred.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=222 6.17] Revised the submittal procedure and yearly update procedure for the qualification of admixtures for concrete.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=274 6.39] Revised procedure to allow for the qualification of black colored temporary pavement marking materials.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=276 7.01] See the following table for major revisions made to the Materials Acceptance Requirements Table.
 
 
 
'''<u>Materials Acceptance Requirements Table Major Revisions</u>'''
 
 
 
{| class="wikitable sortable"
 
|-
 
! '''Specification Reference''' !! '''Material Name''' !! '''Basis of Acceptance''' !! '''Change Made and Reason for Change'''
 
|-
 
| 715.02 || Abrasive, Steel Grit || VI || Added material to define basis of acceptance.
 
|-
 
| 811.03D9 || Preformed Thermoplastic, Preformed Pavement Marking Materials || Gen Cert || Added this material, must be selected from the published QPL.
 
|-
 
| 901 || Cement || Appr. Mfr. || Removed the option of testing if not from an approved manufacturer.
 
|-
 
| 901.06 || Slag Cement || Appr. Mfr. || Removed the option of testing if not from an approved manufacturer.
 
|-
 
| 901.07 || Fly Ash, Pozzolanic Admixtures for Concrete || Appr. Mfr. || Removed the option of testing if not from an approved manufacturer.
 
|-
 
| 902 || Aggregates || Test || Revised sample size for Coarse, Dense-Graded, Open-Graded, Granular Class I, II, IIA, and III from 50 lbs. to 60 lbs. per Aggregate
 
 
 
Quality Unit.
 
|-
 
| 903.03 || Latex Admixture for Concrete || Appr. Mfr. || Removed the option of testing if not from an approved manufacturer.
 
|-
 
| 908.09A || Tubing, Steel Railings (Base Plate, Angle, and Post Elements) || Fabrication Inspection || Changed the basis of acceptance from Tested Stock to
 
 
 
Fabrication Inspection per the Structural Fabrication Unit.
 
|-
 
| 908.09A || Tubing, Steel Railings (Rail Elements) || Fabrication Inspection|| Changed the basis of acceptance from Tested Stock to Fabrication Inspection per the
 
 
 
Structural Fabrication Unit.
 
|-
 
| 916.07 || Turbidity Curtain || VI || Added this material to define basis of acceptance per Geotechnical Services Unit.
 
|-
 
| 917.12 || Grass Seeding Mixtures || VI & See Remark || Changed sample frequency, sample size and maximum VI quantity to match with FUSP 12SP816A.
 
|-
 
| 922.04 || Temporary Concrete Barriers || Test Data Cert See Remark || Revised Remark to delete previous language and include:  “Contractor must provide
 
 
 
certifications and documentation confirming the TCB provided meets the requirements of subsection 922.04.A of the Standard Specifications for Construction.” Per MDOT
 
 
 
Barrier Advisory Committee.
 
|}
 
 
 
  
Materials Acceptance Requirements Table Special Instructions Revisions:
 
  
Note: Numerous Special Instructions were added per the Structural Fabrication Unit to remove language from the Remarks column of the Acceptance Requirements Table to allow for more detail to be presented in the special instruction/remark noted.
+
'''The Materials Quality Assurance Procedures Manual is found at the following link''':
 +
https://www.michigan.gov/mdot/business/construction/materials-quality-assurance-procedures
  
910.03 Geotextiles - Revised the First Sample frequency requirement and the maximum VI per the Geotechnical Services Unit.
 
  
  

Latest revision as of 17:52, 22 January 2024

Email this Page

Materials Quality Assurance (QA) sampling and testing procedures described in this manual have been developed by Michigan Department of Transportation (MDOT) in accordance with 23 CFR 637. Objectives of the program include the design and implementation of sampling and testing procedures to assure that materials are in reasonably close conformity with plans and specifications. The Materials QA program includes acceptance sampling and testing, independent assurance testing, project materials certification, retention of sampling and testing records, verification of test procedures, calibration of testing apparatus and participation in the development and implementation of technical training for personnel involved in materials sampling and testing.


The Materials Quality Assurance Procedures Manual is found at the following link: https://www.michigan.gov/mdot/business/construction/materials-quality-assurance-procedures


Email this Page

[top of page]