Difference between revisions of "Materials Quality Assurance Procedures Manual"

From MediaWiki
Jump to navigation Jump to search
(Revision related to CMU 2018-001 (Material Quality Assurance Procedures Manual revisions))
(Replaced content with " <div style="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual Email this Page]</di...")
Tag: Replaced
 
(18 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<center>[http://mdotcf.state.mi.us/public/specbook/files/2012/105%20Control%20of%20Materials.pdf 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 105]</center>
+
 
 
<div style="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual Email this Page]</div>
 
<div style="text-align: center;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/Materials_Quality_Assurance_Procedures_Manual Email this Page]</div>
  
Materials Quality Assurance (QA) sampling and testing procedures described in this manual have been developed by Michigan Department of Transportation (MDOT) in accordance with Title 23, of The Code of Federal Regulations, Part 637.  Objectives of the program include the design and implementation of sampling and testing procedures to assure that materials are in reasonably close conformity with plans and specifications.  The Materials QA program includes acceptance sampling and testing, independent assurance testing, project materials certification, retention of sampling and testing records, verification of test procedures, calibration of testing apparatus and participation in the development and implementation of technical training for personnel involved in materials sampling and testing.
+
Materials Quality Assurance (QA) sampling and testing procedures described in this manual have been developed by Michigan Department of Transportation (MDOT) in accordance with [https://ecfr.io/Title-23/sp23.1.637.b 23 CFR 637].  Objectives of the program include the design and implementation of sampling and testing procedures to assure that materials are in reasonably close conformity with plans and specifications.  The Materials QA program includes acceptance sampling and testing, independent assurance testing, project materials certification, retention of sampling and testing records, verification of test procedures, calibration of testing apparatus and participation in the development and implementation of technical training for personnel involved in materials sampling and testing.
 
 
The Materials Quality Assurance Procedures Manual is found at the following link:
 
http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367-207980--,00.html
 
 
 
=[[#2018 Summary of Revisions to the MQAP|2018 Summary of Revisions to the MQAP]]=
 
 
 
The Construction Field Services (CFS) Division has revised the Materials Quality Assurance Procedures (MQAP) Manual.  A brief description of the major revisions is presented below.
 
 
 
'''<u>Manual Section</u>'''
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=14 1.05] Removed this chapter as the content for random sampling by the cube root method is no longer used.
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=14 1.05] Renumbered Section 1.06 to 1.05.  Removed Section 1.05.06 of this chapter as it is covered by other contract documents.  Removed concrete coring information as it is covered by other contract documents.  Removed the details pertaining to relocation of a core in relation to transverse direction and proximity to the edge of pavement.  This direction is defined in other contract documents.
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=20 1.08] Renumbered Section 1.09 to 1.08.  Removed section 1.08.03.E that documented the testing requirements for warehouse items.
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=37 3.01] Removed the requirement for qualified product listed materials to be documented via a general certification.
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=58 3.08] Added requirements for third party certification for qualification of new plants.  Revised section 3.08.12 to include annual requirements for plant certifications.
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=69 4.04] Added requirements for submittal and processing of the Materials Source List (form 501).
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=105 4.07] Added reference to the Load Transfer Assembly Inspection Report (form 0553).
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=113 4.11] Added requirements for submittal and processing of the Materials Source List (form 501).
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=122 4.12] Numerous revisions to this chapter.
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=184 6.06] Revised the qualification procedure to include new specifications for penetrating water repellent treatment for concrete surfaces.
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=224 6.23] Replaced the Class B Bury qualification procedure with the Class A, B and F Bury qualification procedure.
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=259 6.38] Added new qualification procedure for the evaluation of wet reflective beads and elements per 920.02.C.  Subsequent qualification procedures were re-indexed to reflect the entry of this new procedure.
 
 
 
[https://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=265 7.01] See the following table for major revisions made to the Materials Acceptance Requirements Table.
 
 
 
Aggregate sampling frequencies have been revised for all specified aggregate types presented in the table to cross reference to the Procedures for Aggregate Inspection Manual.
 
 
 
Changed the basis of acceptance for all QPL materials from general certification to Visual Inspection (VI) in the table.
 
 
 
{| class="wikitable"
 
|-
 
! Specification Reference !! Material Name !! Basis of Acceptance !! Change Made and Reason for Change
 
|-
 
| 909.06 || Plastic Pipe Class A, B and F Bury (CPE/HDPE and CPV) || VI || Added the revised pipe classes that are now included in the QPL.
 
|-
 
| 909.09 || Cold Applied Pipe Joint Sealer (Mastic) || VI || Changed the basis of acceptance from Test to VI per the Structural Fabrication Unit.
 
|-
 
| 913.06 || Precast Drainage Structure Adjusting Rings || Gen Cert || Changed the basis of acceptance from Appr. Mfr. to Gen Cert per CFS.
 
|-
 
| 914.04A || Hot-Poured Joint Sealant || N/A || Removed the material entry as it is now specified by 12SP-914B-01.
 
|-
 
| 914.05 || Epoxy Binder, For Joint Spall Repair || Test || Removed the option of Tested Stock as a basis of acceptance per CFS Materials Unit.
 
|-
 
| 917.04 || Tree Wrapping Material || N/A || Removed the material entry from the table per the Roadside Development Unit.
 
|-
 
| 920.02C || Wet Reflective Beads/Elements || VI || Added the material entry to the table per Traffic and Safety Division.  Must be a QPL per 920.02C.
 
|-
 
| 922.04A || Barrier Reflector Markers Permanent || VI || Added entry to separate the material from the temporary markers.  Change in basis of acceptance per Traffic and Safety Division.
 
|}
 
 
 
Materials Acceptance Requirements Table Special Instructions Revisions:
 
 
 
902 Added Special Instructions pertaining to the Pre-Qualified Supplier Program in the Procedures for Aggregate Inspection Manual.  Specifically, how Project Engineers are to document passing QA tests with Region personnel.
 
 
 
909.06 Revised instructions to remove redundant information.  Revised instructions for perforated pipe to indicate that tested stock is not permitted for clarification.
 
 
 
=[[#2017 Summary of Revisions to the MQAP|2017 Summary of Revisions to the MQAP]]=
 
 
 
The Construction Field Services (CFS) Division has revised the Materials Quality Assurance Procedures (MQAP) Manual.  A brief description of the major revisions is presented below.
 
 
 
'''<u>Manual Section</u>'''
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=10 1.02] Significant revisions to this chapter have occurred.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=46 3.03] Removed “902.01 Aggregates - See Section 3.04.08 of this manual.” from the Schedule No. 2 Special Instructions.  Removed “904.03C Emulsified Asphalt - See Section 3.06.06 of this manual.” from the Schedule No. 2 Special Instructions as this process is not applicable to the Region Materials staff.  Added Operations Field Services sampling responsibilities for Pre-stressing Strand to the Schedule II Certification Verification Special Instructions.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=83 4.04] Added Section 4.04.06 to define Stockpile Payment procedures when requested of and implemented by the Structural Fabrication Unit.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=94 4.05] Added Section 4.05.07 to define Stockpile Payment procedures when requested of and implemented by the Structural Fabrication Unit.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=108 4.06]Added Section 4.06.06 to define Stockpile Payment procedures when requested of and implemented by the Structural Fabrication Unit.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=120 4.07] Revised this chapter to redefine the fabrication inspection of Load Transfer Assemblies for Transverse Joints.  Frequency of inspections was changed, allowable Visual Inspection limits were modified and the method of documentation of these inspections was revised.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=128 4.11]Added Section 4.11.06 to define Stockpile Payment procedures when requested of and implemented by the Structural Fabrication Unit.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=188 6.04]Revised the submittal process for the qualified products evaluation procedure of Non-Shrinking Mortar and Grout, Premixed, Type H-1 (Non-Metallic).  Revised physical requirements reporting.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=276 7.01]See the following table for major revisions made to the Materials Acceptance Requirements Table.
 
 
 
Aggregate sampling frequencies have been revised for all specified aggregate types presented in the table to cross reference to the Procedures for Aggregate Inspection Manual.
 
 
 
 
 
'''<u>Materials Acceptance Requirements Table Major Revisions</u>'''
 
 
 
 
 
{| class="wikitable"
 
|-
 
! Specification Reference !! Material Name !! Basis of Acceptance !! Change Made and Reason for Change
 
|-
 
| 810.03O || Bridge Sign Connections || Fabrication Inspection || Added material to define basis of acceptance per Structural Fabrication Unit.
 
|-
 
| 908.09C || Tubing, Steel Railings (Hardware) || Test || Per Structural Fabrication Unit, redefined the sample size and frequency to indicate “1 assembly” per sample.
 
|-
 
| 908.14 || Anchor Bolts and Nuts for Other Purposes || Test || Per Structural Fabrication Unit, redefined the sample size and frequency to indicate “1 assembly” per sample.
 
|-
 
| 914.07 || Transverse Pavement Joints (Dowel Bars) || Appr. Mfr. || Per CFS Materials Unit, removed the option of testing if not from an approved manufacturer.  Increased the Maximum VI Quantity from 240 to 1200 bars.
 
|-
 
| 914.07 || Transverse Pavement Joints (Load Transfer Assemblies) || Appr. Mfr. || Per CFS Materials Unit, removed the option of testing if not from an approved manufacturer.  Increased the Maximum VI Quantity from 20 to 100 assemblies.
 
|-
 
| 919.02 || Signs (Permanent) || See Remark || Removed reference to Joint Construction IM 1997 C-S per CFS Construction-Operations Unit.
 
|-
 
| 921.05 || Traffic Signal Strain Pole || Gen Cert || Changed the basis of acceptance from Test Data Cert to Gen Cert per the Structural Fabrication Unit.
 
|-
 
| 922.06C || Temporary Traffic Control, Pavement Marking Cover || Gen Cert || Added material to define basis of acceptance.  Must be Qualified Product.
 
|}
 
 
 
Materials Acceptance Requirements Table Special Instructions Revisions:
 
 
 
902 Removed this content from the Special Instructions as this will now be referenced in the Aggregate Inspection Manual
 
 
 
908.09A Added instructions to indicate documentation required when submitting a sample.
 
 
 
908.09B Added instructions to indicate documentation required when submitting a sample.
 
 
 
908.09C Detail added to clarify an “Assembly”.
 
 
 
908.14 Detail added to indicate cantilever type sampling frequencies and stainless steel anchors bolts are not required to be tested.
 
 
 
908.14D Detail added to clarify an “Assembly”.
 
 
 
914.07 Added reference to the Materials Quality Assurance Procedures Manual, Chapter 4.07 (Load Transfer Assemblies for Transverse Joints), which documents the field inspection of these materials.
 
 
 
=[[#2016 Summary of Revisions to the MQAP|2016 Summary of Revisions to the MQAP]]=
 
The Construction Field Services (CFS) Division has revised the Materials Quality Assurance Procedures (MQAP) Manual.  A brief description of the major revisions is presented below.
 
 
 
'''<u>Manual Section</u>'''
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=20 1.08]    Revised this chapter to include methods of tagging samples.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=40 3.01]    Revised the Certification Documentation requirements.  Eliminated the quantity requirement, clarified that the material can be certified by the contractor, and included language to clarify the general certification requirements of QPL products.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=67 3.07]    Revised this chapter to include slag cement.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=69 3.08]    Revised this chapter to include submittal requirements for qualifying new facilities.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=72 3.09]    Deleted chapter 3.09 Temporary Concrete Barrier in its entirety and replaced it with Concrete Pipe, Culvert, and Related Items, previously chapter 3.10.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=72 3.10]    Revised this chapter to remove the fabrication inspection and acceptance of culverts, revised to chapter 3.09.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=83 4.04]    Significant revisions to this chapter have occurred.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=94 4.05]    Significant revisions to this chapter have occurred.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=108 4.06] Significant revisions to this chapter have occurred.  Combined chapter 4.10 (Tower Lighting Unit Fabrication) and 4.11 (Traffic Signal Mast Arm Pole and Mast Arm) into this chapter.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=125 4.10] Replaced with new chapter Temporary Traffic Control Certification and Acceptance Procedure.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=128 4.11]Replaced with new chapter Non-Prestressed Structural Precast Concrete Fabrication.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=139 4.13]Significant revisions to this chapter have occurred.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=222 6.17] Revised the submittal procedure and yearly update procedure for the qualification of admixtures for concrete.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=274 6.39] Revised procedure to allow for the qualification of black colored temporary pavement marking materials.
 
 
 
[http://www.michigan.gov/documents/mdot/MDOT_2014_MQAPFinalLinked_453616_7.pdf#page=276 7.01] See the following table for major revisions made to the Materials Acceptance Requirements Table.
 
 
 
'''<u>Materials Acceptance Requirements Table Major Revisions</u>'''
 
 
 
{| class="wikitable sortable"
 
|-
 
! '''Specification Reference''' !! '''Material Name''' !! '''Basis of Acceptance''' !! '''Change Made and Reason for Change'''
 
|-
 
| 715.02 || Abrasive, Steel Grit || VI || Added material to define basis of acceptance.
 
|-
 
| 811.03D9 || Preformed Thermoplastic, Preformed Pavement Marking Materials || Gen Cert || Added this material, must be selected from the published QPL.
 
|-
 
| 901 || Cement || Appr. Mfr. || Removed the option of testing if not from an approved manufacturer.
 
|-
 
| 901.06 || Slag Cement || Appr. Mfr. || Removed the option of testing if not from an approved manufacturer.
 
|-
 
| 901.07 || Fly Ash, Pozzolanic Admixtures for Concrete || Appr. Mfr. || Removed the option of testing if not from an approved manufacturer.
 
|-
 
| 902 || Aggregates || Test || Revised sample size for Coarse, Dense-Graded, Open-Graded, Granular Class I, II, IIA, and III from 50 lbs. to 60 lbs. per Aggregate
 
 
 
Quality Unit.
 
|-
 
| 903.03 || Latex Admixture for Concrete || Appr. Mfr. || Removed the option of testing if not from an approved manufacturer.
 
|-
 
| 908.09A || Tubing, Steel Railings (Base Plate, Angle, and Post Elements) || Fabrication Inspection || Changed the basis of acceptance from Tested Stock to
 
 
 
Fabrication Inspection per the Structural Fabrication Unit.
 
|-
 
| 908.09A || Tubing, Steel Railings (Rail Elements) || Fabrication Inspection|| Changed the basis of acceptance from Tested Stock to Fabrication Inspection per the
 
 
 
Structural Fabrication Unit.
 
|-
 
| 916.07 || Turbidity Curtain || VI || Added this material to define basis of acceptance per Geotechnical Services Unit.
 
|-
 
| 917.12 || Grass Seeding Mixtures || VI & See Remark || Changed sample frequency, sample size and maximum VI quantity to match with FUSP 12SP816A.
 
|-
 
| 922.04 || Temporary Concrete Barriers || Test Data Cert See Remark || Revised Remark to delete previous language and include:  “Contractor must provide
 
 
 
certifications and documentation confirming the TCB provided meets the requirements of subsection 922.04.A of the Standard Specifications for Construction.” Per MDOT
 
 
 
Barrier Advisory Committee.
 
|}
 
 
 
  
Materials Acceptance Requirements Table Special Instructions Revisions:
 
  
Note: Numerous Special Instructions were added per the Structural Fabrication Unit to remove language from the Remarks column of the Acceptance Requirements Table to allow for more detail to be presented in the special instruction/remark noted.
+
'''The Materials Quality Assurance Procedures Manual is found at the following link''':
 +
https://www.michigan.gov/mdot/business/construction/materials-quality-assurance-procedures
  
910.03 Geotextiles - Revised the First Sample frequency requirement and the maximum VI per the Geotechnical Services Unit.
 
  
  

Latest revision as of 17:52, 22 January 2024

Email this Page

Materials Quality Assurance (QA) sampling and testing procedures described in this manual have been developed by Michigan Department of Transportation (MDOT) in accordance with 23 CFR 637. Objectives of the program include the design and implementation of sampling and testing procedures to assure that materials are in reasonably close conformity with plans and specifications. The Materials QA program includes acceptance sampling and testing, independent assurance testing, project materials certification, retention of sampling and testing records, verification of test procedures, calibration of testing apparatus and participation in the development and implementation of technical training for personnel involved in materials sampling and testing.


The Materials Quality Assurance Procedures Manual is found at the following link: https://www.michigan.gov/mdot/business/construction/materials-quality-assurance-procedures


Email this Page

[top of page]