MediaWiki:Sidebar
Jump to navigation
Jump to search
- navigation
- mainpage|mainpage-description
- portal-url|portal
- currentevents-url|currentevents
- recentchanges-url|recentchanges
- randompage-url|randompage
- helppage|help
- SEARCH
- TOOLBOX
- LANGUAGES
- Division 1 – General
- 101 - General Project Administration|101 - General Project Administration
- 102 - PreConstruction Administration|102 - PreConstruction Administration
- 103 - Post Award Administration|103 - Post Award Administration
- 104 - Construction Surveying|104 - Construction Surveying
- 105 - Control of Materials|105 - Control of Materials
- 106 - Quality Control/Qualtiy Assurance|106 - Quality Control/Qualtiy Assurance
- 107 - Legal Relations and Responsibility to the Public|107 - Legal Relations and Responsibility to the Public
- 108 - Prosecution and Progress|108 - Prosecution and Progress
- 109 - Measurement and Payment|109 - Measurement and Payment
- 110 - Programs Not Covered by Standard Specifications|110 - Programs Not Covered by Standard Specifications
- Division 2 - Earthwork
- 201 - Clearing|201 - Clearing
- 202 - Removing Trees, Stumps, and Corduroy|202 - Removing Trees, Stumps, and Corduroy
- 203 - Removing Drainage Structures, Culverts, and Sewers|203 - Removing Drainage Structures, Culverts, and Sewers
- 204 - Removing Miscellaneous Structures and Materials|204 - Removing Miscellaneous Structures and Materials
- 205 - Roadway Earthwork| 205 - Roadway Earthwork
- 206 - Excavation and Backfillfor Structures|206 - Excavation and Backfillfor Structures
- 207 - Obliterating Roadway|207 - Obliterating Roadway
- 208 - Soil Erosion and Sedimentation Control (NPDES)|208 - Soil Erosion and Sedimentation Control (NPDES)
- 209 - Project Cleanup|209 - Project Cleanup
- 210 - Environmental|210 - Environmental
- Division 3 - Base Courses
- 301 - Subbase|301 - Subbase
- 302 - Aggregate Base Courses|302 - Aggregate Base Courses
- 303 - Open Graded Drainage Course|303 - Open Graded Drainage Course
- 304 - Rubbilizing Existing PCC Pavement|304 - Rubbilizing Existing PCC Pavement
- 305 - HMA Base Crushing and Shaping|305 - HMA Base Crushing and Shaping
- 306 - Aggregate Surface Course|306 - Aggregate Surface Course
- 307 - Aggregate Shoulders and Approaches|307 - Aggregate Shoulders and Approaches
- Division 4 - Drainage Features
- 401 - Culverts|401 - Culverts
- 402 - Storm Sewers|402 - Storm Sewers
- 403 - Drainage Structures|403 - Drainage Structures
- 404 - Underdrain|404 - Underdrain
- 405 - Pump Station Construction|405 - Pump Station Construction
- Division 5 - HMA Pavements and Surface Treatments
- 501 - HMA Mixtures|501 - HMA Mixtures
- 502 - HMA Construction Practices|502 - HMA Construction Practices
- 503 - Contractor Quality Control for HMA|503 - Contractor Quality Control for HMA
- 504 - Furnishing and Placing HMA Mixtures (Quality Assurance)|504 - Furnishing and Placing HMA Mixtures (Quality Assurance)
- 505 - Overband Crack Seal|505 - Overband Crack Seal
- 506 - Slurry Seal|506 - Slurry Seal
- 507 - Micro Surfacing|507 - Micro Surfacing
- 508 - Chip Seals|508 - Chip Seals
- Division 6 - PCC Pavement Mixtures
- 601 - PCC Pavement Mixtures|601 - PCC Pavement Mixtures
- 602 - Concrete Pavement Construction|602 - Concrete Pavement Construction
- 603 - Concrete Pavement Restoration|603 - Concrete Pavement Restoration
- 604 - Contractor Quality Control for Concrete|604 - Contractor Quality Control for Concrete
- 605 - Contractor Quality Assurance for Concrete|605 - Contractor Quality Assurance for Concrete
- Division 7 - Structures