Oldest pages

Jump to navigation Jump to search

Showing below up to 250 results in range #1 to #250.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. ‏‎ (14:09, 28 January 2013)
  2. ‏‎ (10:57, 25 March 2013)
  3. Module:Category handler‏‎ (09:28, 3 July 2014)
  4. Module:Message box‏‎ (09:28, 3 July 2014)
  5. Module:Yesno‏‎ (09:28, 3 July 2014)
  6. Module:Arguments‏‎ (09:28, 3 July 2014)
  7. Module:Documentation/config‏‎ (09:28, 3 July 2014)
  8. Module:Documentation‏‎ (09:28, 3 July 2014)
  9. Module:Namespace detect/data‏‎ (09:28, 3 July 2014)
  10. Module:Message box/configuration‏‎ (09:28, 3 July 2014)
  11. Module:HtmlBuilder‏‎ (09:28, 3 July 2014)
  12. Module:Namespace detect/config‏‎ (09:28, 3 July 2014)
  13. Module:Namespace detect‏‎ (09:28, 3 July 2014)
  14. 102.03 Interpretation of Bid Items in the Proposal‏‎ (09:32, 11 April 2017)
  15. 102.04 Examination of Plans, Specifications, and Work Site‏‎ (09:36, 11 April 2017)
  16. 102.06 Irregular Bids‏‎ (10:03, 11 April 2017)
  17. 102.07 Delivery of Bid‏‎ (10:04, 11 April 2017)
  18. 102.08 Withdrawal or Revision of Bid‏‎ (10:06, 11 April 2017)
  19. 102.09 Downloading of Bids‏‎ (10:08, 11 April 2017)
  20. 102.10 Bid Review‏‎ (10:09, 11 April 2017)
  21. 102.11 Bid Rejection‏‎ (10:10, 11 April 2017)
  22. 102.12 Bid Rejection Appeal‏‎ (10:11, 11 April 2017)
  23. 102.13 Consideration of Bids‏‎ (10:12, 11 April 2017)
  24. 103.01 Intent of the Contract‏‎ (15:38, 11 April 2017)
  25. 103.03 Contractor Engineer Communication‏‎ (15:52, 11 April 2017)
  26. 104.02 Plans and Working Drawings‏‎ (07:48, 12 April 2017)
  27. 104.03 Deviations from the Plans‏‎ (07:52, 12 April 2017)
  28. 104.04 Conformity with the Contrat‏‎ (07:55, 12 April 2017)
  29. 104.05 Removal of Unauthorized Work‏‎ (07:57, 12 April 2017)
  30. 104.06 Coordination of Drawing Dimensions and Contract Documentation‏‎ (08:03, 12 April 2017)
  31. 104.08 Cooperation by the Contractor‏‎ (08:10, 12 April 2017)
  32. 104.11 Work Zone Safety and Mobility‏‎ (11:18, 12 April 2017)
  33. 104.12 Approval for Use of the Right of Way‏‎ (11:21, 12 April 2017)
  34. 105.02 Natural Material Sources Found Within the Excavation Limits‏‎ (09:44, 14 April 2017)
  35. 105.03 Borrow Materials‏‎ (09:48, 14 April 2017)
  36. 105.04 Miscellameous Quantities‏‎ (09:50, 14 April 2017)
  37. 105.05 Approval of Materials Incorporated into the Work‏‎ (09:52, 14 April 2017)
  38. 105.06 Storage of Materials‏‎ (09:54, 14 April 2017)
  39. 105.08 Nonconforming Materials‏‎ (10:00, 14 April 2017)
  40. 105.09 Materials not Incorporated into the Work‏‎ (10:05, 14 April 2017)
  41. 107.02 Permits and Licenses‏‎ (08:05, 17 April 2017)
  42. 107.03 Patented Process and Materials‏‎ (08:10, 17 April 2017)
  43. 107.04 Federal Aid Participation‏‎ (08:12, 17 April 2017)
  44. 107.05 Sanitary Provisions‏‎ (08:15, 17 April 2017)
  45. 107.07 Protection and Restoration of Property‏‎ (08:20, 17 April 2017)
  46. 107.08 Land Monuments and Property Corners‏‎ (08:25, 17 April 2017)
  47. 107.10 Indemnification, Damage Liability, and Insurance‏‎ (08:38, 17 April 2017)
  48. 107.11 Contractor's Responsibility for the Work‏‎ (08:41, 17 April 2017)
  49. 107.13 Personal Liability of Public Officials‏‎ (08:49, 17 April 2017)
  50. 107.14 No Waiver of Legal Rights‏‎ (08:54, 17 April 2017)
  51. 107.16 Forest Protection‏‎ (09:00, 17 April 2017)
  52. 107.17 Use of Explosives‏‎ (09:01, 17 April 2017)
  53. 107.18 Work over Navigable Waters‏‎ (09:05, 17 April 2017)
  54. 107.20 Private Railroad Crossing for Haul Purposes‏‎ (09:09, 17 April 2017)
  55. 108.02 Limitations of Operations‏‎ (11:55, 17 April 2017)
  56. 108.03 Competence of Workers‏‎ (11:57, 17 April 2017)
  57. 108.04 Adequacy of Methods and Equipment‏‎ (11:59, 17 April 2017)
  58. 108.06 Determination of Contract Time for Work Day Contracts‏‎ (12:03, 17 April 2017)
  59. 108.11 Default of Contract‏‎ (13:26, 17 April 2017)
  60. 108.12 Termination of Contract‏‎ (13:27, 17 April 2017)
  61. 102.05 Preparation of Bid Items in the Proposal‏‎ (14:57, 18 April 2017)
  62. 109.06 Source of Supply and Carrier Rates on Materials‏‎ (18:01, 18 April 2017)
  63. Table of Contents Division 1‏‎ (11:18, 17 May 2017)
  64. Table of Contents Division 1 Supplemental‏‎ (14:34, 17 May 2017)
  65. 104.09 Lines, Grades, and Elevations‏‎ (14:43, 19 June 2017)
  66. Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects‏‎ (15:12, 19 June 2017)
  67. Hot Mix Asphalt Production Manual‏‎ (15:14, 19 June 2017)
  68. 107.21 Open to Traffic‏‎ (09:34, 23 October 2017)
  69. Projects with Incentive Provisions‏‎ (09:34, 3 January 2018)
  70. Pavement Historical Database‏‎ (09:37, 3 January 2018)
  71. Information Sharing About Construction Contractors and Consultants‏‎ (09:41, 3 January 2018)
  72. Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System‏‎ (09:42, 3 January 2018)
  73. Construction Manual Wiki Tips‏‎ (12:22, 7 May 2018)
  74. 107.19 Hauling on Local Roads and Streets‏‎ (14:50, 25 June 2019)
  75. Plans, Proposal, Input, Review and Evaluation‏‎ (11:29, 14 July 2020)
  76. 109.01 Measurement of Quantities‏‎ (15:05, 6 May 2021)
  77. 109.02 Scope of Payment‏‎ (15:06, 6 May 2021)
  78. 109.03 Payments for Increased or Decreased Quantities‏‎ (15:06, 6 May 2021)
  79. FHWA CAP Action Plans‏‎ (15:43, 6 May 2021)
  80. FPR Frequently Asked Questions‏‎ (15:46, 6 May 2021)
  81. Interim File Review‏‎ (15:47, 6 May 2021)
  82. Letter to File‏‎ (15:48, 6 May 2021)
  83. Mandrel Testing of Plastic Pipe‏‎ (16:06, 6 May 2021)
  84. 700 - Closure of Unsafe Structures‏‎ (17:11, 6 May 2021)
  85. Division 7 Supplemental Information‏‎ (16:38, 12 May 2021)
  86. 107.01 Laws to be Observed‏‎ (17:20, 13 July 2021)
  87. Division 2 Supplemental Information‏‎ (14:21, 23 September 2021)
  88. Division 4 Supplemental Information‏‎ (14:29, 23 September 2021)
  89. 505 - Chip Seals‏‎ (18:14, 15 December 2021)
  90. 502 - HMA Crack Treatment‏‎ (18:15, 15 December 2021)
  91. 503 - Paver Placed Surface Seal‏‎ (18:16, 15 December 2021)
  92. 504 - Micro-Surfacing‏‎ (18:17, 15 December 2021)
  93. 506 - Slurry Seal‏‎ (18:17, 15 December 2021)
  94. Final Project Review Report‏‎ (08:57, 5 January 2022)
  95. 303 - Open Graded Drainage Course‏‎ (16:43, 12 January 2022)
  96. 305 - HMA Base Crushing and Shaping‏‎ (16:44, 12 January 2022)
  97. 306 - Aggregate Surface Course‏‎ (16:58, 12 January 2022)
  98. 308 - Geotextiles for Base‏‎ (16:59, 12 January 2022)
  99. 101 - Terms, Format, and Conditions‏‎ (17:23, 12 January 2022)
  100. 104.01 Authority of the Department‏‎ (17:28, 12 January 2022)
  101. 105.07 Handling and Transporting Materials‏‎ (17:32, 12 January 2022)
  102. 106 - Quality Assurance Acceptance Program‏‎ (17:34, 12 January 2022)
  103. 107.15 Compliance with Laws; Environmental Protection‏‎ (17:36, 12 January 2022)
  104. 108.01 Subcontracting of Contract Work‏‎ (17:38, 12 January 2022)
  105. 150 - Mobilization‏‎ (17:42, 12 January 2022)
  106. 402 - Storm Sewers‏‎ (17:47, 12 January 2022)
  107. 403 - Drainage Structures‏‎ (17:47, 12 January 2022)
  108. 404 - Underdrain‏‎ (17:47, 12 January 2022)
  109. 405 - Pump Station Construction‏‎ (17:47, 12 January 2022)
  110. 406 - Precast Three-Sided, Arch, and Box Culverts‏‎ (17:48, 12 January 2022)
  111. 701 - Portland Cement Concrete for Structures‏‎ (11:43, 19 January 2022)
  112. 702 - Mortar and Grout‏‎ (11:43, 19 January 2022)
  113. 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes‏‎ (11:43, 19 January 2022)
  114. 708 - Prestressed Concrete‏‎ (11:45, 19 January 2022)
  115. 711 - Bridge Railings‏‎ (11:46, 19 January 2022)
  116. 712 - Bridge Rehabilitation, Concrete‏‎ (11:46, 19 January 2022)
  117. 714 - Temporary Structures and Approaches‏‎ (11:47, 19 January 2022)
  118. 716 - Shop Cleaning and Coating Structural Steel‏‎ (11:47, 19 January 2022)
  119. 717 - Downspouts and Drains‏‎ (11:48, 19 January 2022)
  120. 719 - Earth Retaining Structures‏‎ (11:48, 19 January 2022)
  121. 801 - Concrete Driveways‏‎ (11:49, 19 January 2022)
  122. 802 - Concrete Curb, Gutter, and Dividers‏‎ (11:49, 19 January 2022)
  123. 803 - Concrete Sidewalk, Ramps, and Steps‏‎ (11:50, 19 January 2022)
  124. 804 - Concrete Barriers and Glare Screens‏‎ (11:50, 19 January 2022)
  125. 805 - Hot Mix Asphalt Curb‏‎ (11:50, 19 January 2022)
  126. 806 - Bicycle Paths‏‎ (12:41, 19 January 2022)
  127. 808 - Fencing‏‎ (12:42, 19 January 2022)
  128. 809 - Field Office‏‎ (12:42, 19 January 2022)
  129. 814 - Paved Ditches‏‎ (12:44, 19 January 2022)
  130. 817 - Landscape Mowing‏‎ (12:45, 19 January 2022)
  131. 821 - Preservation of Land Monuments and Property Corners‏‎ (12:46, 19 January 2022)
  132. 822 - Ground or Cut Centerline and Shoulder Corrugations‏‎ (12:47, 19 January 2022)
  133. 824 - Contractor Staking‏‎ (12:47, 19 January 2022)
  134. Contract Administration and Oversight Guidelines for Projects Containing Warranty Work‏‎ (14:44, 19 January 2022)
  135. Contractor's Equipment and Traffic Control‏‎ (14:44, 19 January 2022)
  136. Extending Project Limits‏‎ (14:54, 19 January 2022)
  137. Processing Sewage/Storm Water Damage Claims‏‎ (15:47, 19 January 2022)
  138. Weight Limit Waivers‏‎ (15:52, 19 January 2022)
  139. Work Order‏‎ (15:52, 19 January 2022)
  140. 301 - Subbase‏‎ (14:12, 16 February 2022)
  141. 304 - Rubbilizing Existing PCC Pavement‏‎ (14:18, 16 February 2022)
  142. 302 - Aggregate Base Courses‏‎ (14:24, 16 February 2022)
  143. Holiday Traffic Safety Provisions‏‎ (12:33, 14 March 2022)
  144. Project Delays Due to a Utility Company‏‎ (10:58, 4 May 2022)
  145. Process for Documenting Certified Materials in FieldManager‏‎ (16:09, 25 May 2022)
  146. Dispute Review Board (DRB)‏‎ (15:56, 11 July 2022)
  147. 307 - Aggregate Shoulders and Approaches‏‎ (11:16, 21 July 2022)
  148. Section 701 - Portland Cement Concrete for Structures‏‎ (13:11, 26 July 2022)
  149. 816 - Turf Establishment‏‎ (13:12, 26 July 2022)
  150. Section 601 - Portland Cement Concrete for Pavements‏‎ (13:21, 26 July 2022)
  151. 707 - Structural Steel‏‎ (13:22, 26 July 2022)
  152. Table of Contents by Project Phase‏‎ (15:18, 26 July 2022)
  153. 108.10 Liquidated Damages‏‎ (10:01, 27 July 2022)
  154. Construction Value Engineering Change Proposal (VECP)‏‎ (14:57, 11 October 2022)
  155. Project with Consultant Oversight‏‎ (17:05, 7 February 2023)
  156. 108.08 Extension of Time on Calendar Day Contracts‏‎ (09:52, 8 March 2023)
  157. 108.07 Extension of Time on Work Day Contracts‏‎ (09:54, 8 March 2023)
  158. Dev Page‏‎ (16:02, 8 March 2023)
  159. 815 - Landscaping‏‎ (17:08, 27 March 2023)
  160. 201 - Clearing‏‎ (12:01, 28 March 2023)
  161. 812 - Temporary Traffic Control for Construction Zone Operations‏‎ (11:44, 29 March 2023)
  162. 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts‏‎ (15:50, 6 April 2023)
  163. 713 - Bridge Rehabilitation, Steel‏‎ (17:29, 10 April 2023)
  164. 109.08 Prompt Payment‏‎ (11:03, 25 April 2023)
  165. 107.12 Contractor's Responsibility for Utility Property and Services‏‎ (11:08, 25 April 2023)
  166. 718 - Drilled Shafts‏‎ (11:40, 25 April 2023)
  167. 715 - Cleaning and Coating Existing Structural Steel‏‎ (11:46, 25 April 2023)
  168. Quality Initiatives and Adjustments‏‎ (10:05, 2 May 2023)
  169. Density Training Videos‏‎ (13:03, 17 May 2023)
  170. 107.06 Furnishing Right-of-Way‏‎ (11:59, 22 May 2023)
  171. 109.05 Payment for Contract Revisions‏‎ (13:19, 6 June 2023)
  172. Force Account Work‏‎ (17:31, 6 June 2023)
  173. 109.04 Progress and Partial Payments‏‎ (09:22, 11 July 2023)
  174. Project Closeout Escalation of Accountability‏‎ (11:05, 13 July 2023)
  175. 104.07 Contractor Obligations‏‎ (11:18, 13 July 2023)
  176. Construction Technology Support Resources‏‎ (10:57, 22 August 2023)
  177. FieldManager‏‎ (11:03, 22 August 2023)
  178. 900 - Materials‏‎ (09:41, 13 September 2023)
  179. 1001 - Concrete Production Equipment and Facilities‏‎ (09:56, 13 September 2023)
  180. 1005 - Mortar and Grout Mixtures‏‎ (09:57, 13 September 2023)
  181. 1006 - Patching, Repair, & Overlay Mixtures‏‎ (09:57, 13 September 2023)
  182. 203 - Removing Drainage Structures, Culverts, and Sewers‏‎ (10:05, 13 September 2023)
  183. 207 - Obliterating Roadway‏‎ (10:06, 13 September 2023)
  184. 202 - Removing Trees, Stumps, and Corduroy‏‎ (10:07, 13 September 2023)
  185. 204 - Removing Miscellaneous Structures and Materials‏‎ (10:07, 13 September 2023)
  186. 206 - Excavation and Backfill for Structures‏‎ (10:08, 13 September 2023)
  187. 209 - Project Cleanup‏‎ (10:08, 13 September 2023)
  188. Division 3 Supplemental Information‏‎ (10:14, 13 September 2023)
  189. 603 - Concrete Pavement Restoration‏‎ (10:16, 13 September 2023)
  190. Preconstruction Meeting‏‎ (11:18, 14 September 2023)
  191. 105.10 Buy America Source of Steel and Iron‏‎ (07:32, 19 September 2023)
  192. 813 - Slope Protection‏‎ (17:17, 19 September 2023)
  193. E-Signature‏‎ (15:30, 20 September 2023)
  194. 105.01 Quality and Scope of Supply‏‎ (14:44, 21 September 2023)
  195. 205 - Roadway Earthwork‏‎ (14:45, 21 September 2023)
  196. MDOT DENSITY TESTING AND INSPECTION MANUAL‏‎ (14:49, 21 September 2023)
  197. Notice of Non-Compliance with Contract Requirements‏‎ (15:09, 26 September 2023)
  198. 102.01 Prequalification of Bidders‏‎ (15:22, 26 September 2023)
  199. 823 - Water Mains‏‎ (14:01, 27 September 2023)
  200. 401 - Culverts‏‎ (12:56, 4 October 2023)
  201. 825 - Sanitary Sewer Systems‏‎ (13:07, 4 October 2023)
  202. 102.19 Evaluation of Contractor Performance and Contract Non-Compliance‏‎ (13:29, 4 October 2023)
  203. 102.14 Execution and Award of Contract‏‎ (13:35, 4 October 2023)
  204. 102.15 Requirements of Contract Bonds‏‎ (13:36, 4 October 2023)
  205. 102.16 Bid Guaranty Payment‏‎ (13:37, 4 October 2023)
  206. 102.18 - OJT Program‏‎ (13:40, 4 October 2023)
  207. 811 - Permanent Pavement Markings‏‎ (17:48, 9 October 2023)
  208. Construction Field Services Indirect Testing Charges‏‎ (08:12, 16 October 2023)
  209. Final Project Review‏‎ (17:01, 6 November 2023)
  210. 1004 - Portland Cement Concrete Mixtures‏‎ (16:41, 22 November 2023)
  211. 102.02 Contents of Proposal - Progress Clause‏‎ (13:54, 29 November 2023)
  212. Certified Engineer Process‏‎ (13:56, 29 November 2023)
  213. Local Agency Program (LAP)‏‎ (18:40, 13 December 2023)
  214. Railroad Highway Projects‏‎ (17:35, 14 December 2023)
  215. MDOT Construction Manual Content Revision Procedures‏‎ (14:52, 19 December 2023)
  216. FHWA’s Risk-Based Project Involvement (RBPI) Stewardship & Oversight Plan (S&O Plan)‏‎ (15:37, 3 January 2024)
  217. 1002 - Contractor Quality Control for Concrete‏‎ (17:23, 3 January 2024)
  218. 1003 - Quality Assurance (Acceptance) for Concrete‏‎ (11:41, 10 January 2024)
  219. 709 - Timber Sturctures‏‎ (16:33, 10 January 2024)
  220. Structural Fabrication Quality Manual‏‎ (15:24, 11 January 2024)
  221. 109.07 Final Inspection, Acceptance, and Final Payment‏‎ (15:37, 11 January 2024)
  222. Materials Quality Assurance Procedures Manual‏‎ (17:52, 22 January 2024)
  223. Digital Calculations for Payment‏‎ (12:47, 29 January 2024)
  224. 501 - Plant Produced Hot Mix Asphalt‏‎ (15:08, 30 January 2024)
  225. 208 - Soil Erosion and Sedimentation Control (NPDES)‏‎ (17:02, 15 February 2024)
  226. 710 - Waterproofing and Protective Covers‏‎ (18:23, 15 February 2024)
  227. 706 - Structural Concrete‏‎ (12:41, 27 February 2024)
  228. 705 - Foundation Piling‏‎ (14:16, 29 February 2024)
  229. 108.05 Progress Schedule‏‎ (14:27, 29 February 2024)
  230. 704 - Steel Sheet Piling and Cofferdams‏‎ (15:44, 29 February 2024)
  231. Frequently Searched Items‏‎ (14:39, 5 March 2024)
  232. 104.10 Claim for Extra Compensation or Extension of Time‏‎ (12:08, 12 March 2024)
  233. Disadvantaged Business Enterprises (DBE)‏‎ (14:51, 21 March 2024)
  234. 107.09 Archeological and Historical Findings‏‎ (13:42, 1 April 2024)
  235. Prevailing Wage‏‎ (14:09, 1 April 2024)
  236. 103.02 Contract Revisions‏‎ (16:11, 1 April 2024)
  237. MDOT Construction Manual Style Guide‏‎ (15:30, 2 April 2024)
  238. 810 - Permanent Traffic Signs and Supports‏‎ (15:38, 2 April 2024)
  239. 819 - Electrical and Lighting‏‎ (15:46, 2 April 2024)
  240. New CM Format Code‏‎ (15:53, 2 April 2024)
  241. 820 - Traffic Signals‏‎ (15:59, 2 April 2024)
  242. 826 – Intelligent Transportation Systems‏‎ (16:07, 2 April 2024)
  243. Certified Office Technician Process‏‎ (09:59, 3 April 2024)
  244. 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts‏‎ (10:53, 8 April 2024)
  245. 602 - Concrete Pavement Construction‏‎ (17:07, 10 April 2024)
  246. CONSTRUCTION MANUAL CONTENT TEMPLATE‏‎ (09:11, 11 April 2024)
  247. Main Page‏‎ (17:18, 11 April 2024)
  248. 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)‏‎ (14:31, 17 April 2024)
  249. E-Construction‏‎ (16:49, 18 April 2024)
  250. Standard Naming Convention‏‎ (17:23, 18 April 2024)

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)