- 15:26, 27 September 2021 diff hist -1,783 108.01 Subcontracting of Contract Work Fully updated/replaced information for 108.01, still need correct link to Code of Federal Regulations, Title 23, Section 613.116.
- 14:29, 23 September 2021 diff hist +5,426 Division 4 Supplemental Information Moved Mandrel Testing to Division 4 Supplemental Information current
- 14:21, 23 September 2021 diff hist +61 Division 2 Supplemental Information Updated categories current
- 15:56, 22 September 2021 diff hist +12 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Updated Form 1105 to 1105A
- 15:55, 22 September 2021 diff hist +176 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Added back in images and updated Figures 109-1 through 109-3
- 15:43, 22 September 2021 diff hist 0 N File:Final Estimats Form 1105A.jpg current
- 15:39, 22 September 2021 diff hist 0 N File:Final Estimats Form 1105A.pdf current
- 13:11, 16 September 2021 diff hist +286 Main Page →Recent Major Changes
- 13:04, 16 September 2021 diff hist -7 Preconstruction Meeting →Preconstruction Meeting Minutes: Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes
- 12:58, 16 September 2021 diff hist 0 File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - August 2021.docx SchaeferS uploaded a new version of File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - August 2021.docx current
- 12:54, 16 September 2021 diff hist 0 N File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes 2021.docx current
- 11:18, 8 September 2021 diff hist -18 Main Page →Recent Major Changes: Fix 108.05 url
- 11:16, 8 September 2021 diff hist +320 Main Page →Recent Major Changes: added information for 108.05 Progress Schedule section replacement
- 11:13, 8 September 2021 diff hist +4,899 108.05 Progress Schedule →Progress Schedule, Form 1130: Replaced all information for 108.05 Progress Schedule section
- 08:53, 2 September 2021 diff hist +314 Main Page →Recent Major Changes: Added Final Estimates information and replaced Figure 109-1
- 08:08, 2 September 2021 diff hist +652 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Updated Final Estimates information and Figure 109-1
- 08:07, 2 September 2021 diff hist 0 N File:Final Estimate Submittal Form - Figure 109-1 Aug 2021.jpg current
- 16:30, 1 September 2021 diff hist +98 N Division 4 Supplemental Information Created Division 4 Supplemental Information - awaiting answer as to what should be published here
- 16:27, 1 September 2021 diff hist +324 Main Page →Recent Minor Changes: Updated LAP Boilerplate Preconstruction Meeting Minutes for August 2021
- 16:24, 1 September 2021 diff hist -15 Preconstruction Meeting →LAP Project Considerations: Updated Meeting Minutes with August 2021 file
- 16:21, 1 September 2021 diff hist 0 N File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - August 2021.docx
- 15:05, 1 September 2021 diff hist +348 Main Page →Recent Major Changes: Updated e-Construction section of Division 1 Supplemental
- 13:13, 1 September 2021 diff hist -29 E-Construction →e-Construction/Paper File System
- 13:10, 1 September 2021 diff hist -35,196 E-Construction →e-Construction/Paper File System: Removed table and updated Standard Naming Convention Alpha/Numeric lists
- 12:50, 1 September 2021 diff hist +69 N File:Standard Naming Convention Revised 08-31-2021 - NUMERIC.pdf Standard_Naming_Convention_Revised_08-31-2021_-_NUMERIC current
- 12:49, 1 September 2021 diff hist +67 N File:Standard Naming Convention Revised 08-31-2021 - ALPHA.pdf Standard_Naming_Convention_Revised_08-31-2021_-_ALPHA current
- 15:41, 30 August 2021 diff hist +43 Main Page →Recent Minor Changes
- 15:40, 30 August 2021 diff hist +336 Main Page →Recent Minor Changes: Updated 102.02 Guardrail - Steel Lead Times
- 15:38, 30 August 2021 diff hist -11 102.02 Contents of Proposal - Progress Clause →Progress Clause: Updated Guardrail - Steel Lead Times
- 07:59, 25 August 2021 diff hist +501 Main Page →Recent Major Changes: Added Requirements for FHWA Review on Project of Division Interest (PoDI) information
- 07:54, 25 August 2021 diff hist -571 103.02 Contract Revisions →Requirements for FHWA Review: Updated all text for this section and added image
- 07:43, 25 August 2021 diff hist +8 103.02 Contract Revisions →Approval Thresholds: Fixed alignment of image, no image position was included
- 07:31, 25 August 2021 diff hist 0 N File:103.02 Contract Revisions-Requirements for FHWA Review.jpg current
- 07:09, 3 August 2021 diff hist +363 Main Page →Recent Major Changes: Added 105 Structural Fabrication Quality Manual update
- 07:05, 3 August 2021 diff hist -584 Structural Fabrication Quality Manual Updated content on page
- 17:18, 26 July 2021 diff hist +13 Main Page →Recent Minor Changes: updated Division to Division 1 Supplemental for Certified Engineer List
- 17:18, 26 July 2021 diff hist +338 Main Page →Recent Minor Changes: Current Certified Engineers
- 17:14, 26 July 2021 diff hist +10 m Certified Engineer Process →Current Certified Engineers: Added July 2021 Engineer Certification List
- 17:10, 26 July 2021 diff hist 0 N File:MDOT Engineer certification list - July 2021.jpg current
- 17:07, 26 July 2021 diff hist -10 Certified Engineer Process Undo revision 6341 by SchaeferS (talk) Tag: Undo
- 17:06, 26 July 2021 diff hist +10 Certified Engineer Process →Current Certified Engineers
- 17:05, 26 July 2021 diff hist -10 Certified Engineer Process Undo revision 6339 by SchaeferS (talk) Tag: Undo
- 17:04, 26 July 2021 diff hist +10 m Certified Engineer Process →Current Certified Engineers: Updated July 2021 Engineer Certification List
- 16:58, 26 July 2021 diff hist 0 N File:MDOT Engineer certification list - July 2021.pdf current
- 15:15, 26 July 2021 diff hist +89 Materials Quality Assurance Procedures Manual →2021 Summary of Revisions to the MQAP: editorial change from Geotextile Services Unit to Geotechnical Services Unit
- 14:00, 20 July 2021 diff hist +372 Main Page →Recent Minor Changes: 103.02 updates
- 13:56, 20 July 2021 diff hist -549 m 103.02 Contract Revisions →Revisions to the Contract: Minor text edits of 103.02 Revisions to the Contract and 2012 to 2020 Spec Book reference updates
- 16:14, 14 July 2021 diff hist +336 Main Page →Recent Minor Changes: Updated information in subsection 109.05C Negotiated Prices
- 15:59, 14 July 2021 diff hist +1,112 109.05 Payment for Contract Revisions →Negotiated Prices (109.05.C): Updated section language
- 15:52, 14 July 2021 diff hist -31 Frequently Searched Items Updated link to Prevailing Wage
- 17:22, 13 July 2021 diff hist +85 Prevailing Wage →Additional Information: Added in category information
- 17:20, 13 July 2021 diff hist -48 107.01 Laws to be Observed →General Information: removed some content referencing Prevailing Wage. current
- 17:19, 13 July 2021 diff hist +602 Main Page →Recent Minor Changes: Added changes for 107.01 and new Prevailing Wage page
- 17:14, 13 July 2021 diff hist -62,476 107.01 Laws to be Observed Added link to new Prevailing Wage page Tag: Replaced
- 17:13, 13 July 2021 diff hist +2,949 Prevailing Wage updated information
- 17:10, 13 July 2021 diff hist -11 Prevailing Wage Updated "email this page" link for new Prevailing Wage Section
- 17:10, 13 July 2021 diff hist +59,828 N Prevailing Wage Created new Prevailing Wage section
- 16:52, 13 July 2021 diff hist +313 Main Page →Recent Minor Changes: Added Force Account Work Section info
- 16:39, 13 July 2021 diff hist -396 Force Account Work Updated "email this page" links
- 14:28, 13 July 2021 diff hist +55 109.05 Payment for Contract Revisions Added link to Force Account Work
- 14:24, 13 July 2021 diff hist +120 Force Account Work Added link to Section 109.05 Payment for Contract Revisions
- 14:21, 13 July 2021 diff hist -18 Force Account Work Updated link to email this page
- 14:21, 13 July 2021 diff hist +41,214 N Force Account Work Created new Force Account Work page
- 17:37, 16 June 2021 diff hist +391 Main Page →Recent Minor Changes: Added DRB updates
- 17:35, 16 June 2021 diff hist -440 Dispute Review Board (DRB) →Dispute Review Board (DRB): Made text edits as well as add link to DRB webpage.
- 16:37, 16 June 2021 diff hist +387 Main Page →Recent Major Changes: Added 102.02 update information
- 16:36, 16 June 2021 diff hist -329 Main Page →Recent Minor Changes: Moved Boilerplate information to Major Change Table
- 16:24, 16 June 2021 diff hist +329 Main Page →Recent Minor Changes: added the update for Boilerplate Progress Clause Template June 2021
- 16:22, 16 June 2021 diff hist +16 102.02 Contents of Proposal - Progress Clause →Boilerplate Progress Clause: Updated document link for June 2021
- 16:18, 16 June 2021 diff hist 0 N File:Boilerplate Progress Clause Template June 2021.docx current
- 15:30, 16 June 2021 diff hist +296 Main Page →Recent Major Changes: Added 2021 MQAP content
- 15:25, 16 June 2021 diff hist +10,520 Materials Quality Assurance Procedures Manual Added 2021 Summary of Revisions to the MQAP section
- 07:24, 16 June 2021 diff hist +333 Main Page →Recent Minor Changes: Updated section content for Certified Engineer Process
- 07:21, 16 June 2021 diff hist +4 Certified Engineer Process →MDOT Certified Engineer Process: Updated section with new content
- 13:48, 8 June 2021 diff hist +367 Main Page →Recent Minor Changes: Added the updated Progress Clause Template for LAP Projects-May 2021 document
- 13:45, 8 June 2021 diff hist +3 102.02 Contents of Proposal - Progress Clause →LAP Project Considerations: Updated the Progress Clause Template for LAP Projects May 2021
- 13:44, 8 June 2021 diff hist 0 N File:Progress Clause Template LAP projects 2020 Specs FINAL 05192021 726007 7.pdf current
- 11:28, 8 June 2021 diff hist +325 Main Page →Recent Minor Changes: Updated certified engineer list to June 2021
- 11:24, 8 June 2021 diff hist -9 Certified Engineer Process →Current Certified Engineers: updated certified engineers list to June 2021
- 11:22, 8 June 2021 diff hist 0 N File:Engineer certification list - JUNE 2021.jpg current
- 11:19, 8 June 2021 diff hist 0 N File:Engineer certification list - JUNE 2021.pdf current
- 10:19, 8 June 2021 diff hist +11 107.01 Laws to be Observed →Additional Information: Fixed Annual Prevailing Wage Training url
- 10:18, 8 June 2021 diff hist 0 N File:Prevailing Wage Training 2021.pdf current
- 10:15, 8 June 2021 diff hist +243 Main Page →Recent Major Changes: Added new Section 107.01 Laws to be Observed
- 09:53, 8 June 2021 diff hist -2 107.01 Laws to be Observed Updated email this page info at top
- 09:53, 8 June 2021 diff hist -159 107.01 Laws to be Observed Updated header
- 09:43, 8 June 2021 diff hist +63,170 107.01 Laws to be Observed Created 107.01 Laws to be Observed
- 14:20, 7 June 2021 diff hist 0 N File:107.01 Laws to be Observed - MDOT Delinquent Notice2 293050 7 (1).docx current
- 14:19, 7 June 2021 diff hist 0 N File:107.01 Laws to be Observed - MDOT Delinquent Notice1 293048 7.docx current
- 14:13, 7 June 2021 diff hist 0 N File:107.01 Laws to be Observed - MDOT Deficient Notice 2 293047 7 (3).docx current
- 15:44, 3 June 2021 diff hist 0 N File:107.01 - Jobsite Post Fig. 2.png current
- 15:42, 3 June 2021 diff hist 0 N File:107.01 - Jobsite Post Fig. 1.png current
- 13:30, 24 May 2021 diff hist +278 Main Page →Recent Minor Changes: Edited FHWA Electronic Signature information
- 13:20, 24 May 2021 diff hist +26 E-Signature →Guidance for Non-MDOT Users: Edited FHWA Electronic Signature information
- 09:35, 20 May 2021 diff hist +293 Main Page →Recent Minor Changes: Added E-Signature Guidance for FHWA staff as non-MDOT users
- 09:31, 20 May 2021 diff hist +107 m E-Signature →Guidance for Non-MDOT Users: added FHWA guidance for non-MDOT users
- 17:20, 12 May 2021 diff hist +51 824 - Contractor Staking →MEASUREMENT AND PAYMENT
- 17:20, 12 May 2021 diff hist +51 823 - Water Mains →MEASUREMENT AND PAYMENT
- 17:20, 12 May 2021 diff hist +51 822 - Ground or Cut Centerline and Shoulder Corrugations →MEASUREMENT AND PAYMENT
- 17:19, 12 May 2021 diff hist +51 821 - Preservation of Land Monuments and Property Corners →MEASUREMENT AND PAYMENT
- 17:19, 12 May 2021 diff hist +51 820 - Traffic Signals →MEASUREMENT AND PAYMENT
- 17:19, 12 May 2021 diff hist +51 819 - Electrical and Lighting →MEASUREMENT AND PAYMENT
- 17:18, 12 May 2021 diff hist +51 817 - Landscape Mowing →MEASUREMENT AND PAYMENT
- 17:18, 12 May 2021 diff hist +51 816 - Turf Establishment →MEASUREMENT AND PAYMENT
- 17:18, 12 May 2021 diff hist +51 815 - Landscaping →Final Inspection
- 17:17, 12 May 2021 diff hist +51 814 - Paved Ditches →MEASUREMENT AND PAYMENT
- 17:17, 12 May 2021 diff hist +51 813 - Slope Protection →MEASUREMENT AND PAYMENT
- 17:17, 12 May 2021 diff hist +29 812 - Temporary Traffic Control for Construction Zone Operations →MEASUREMENT AND PAYMENT
- 17:16, 12 May 2021 diff hist +51 811 - Permanent Pavement Markings →Temporary Special Markings for Cold Weather
- 17:16, 12 May 2021 diff hist +51 810 - Permanent Traffic Signs and Supports →MEASUREMENT AND PAYMENT
- 17:16, 12 May 2021 diff hist +51 809 - Field Office →MEASUREMENT AND PAYMENT
- 17:15, 12 May 2021 diff hist +51 808 - Fencing →MEASUREMENT AND PAYMENT
- 17:15, 12 May 2021 diff hist +51 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts →MEASUREMENT AND PAYMENT
- 17:15, 12 May 2021 diff hist +51 806 - Bicycle Paths →MEASUREMENT AND PAYMENT
- 17:15, 12 May 2021 diff hist +51 805 - Hot Mix Asphalt Curb →MEASUREMENT AND PAYMENT
- 17:14, 12 May 2021 diff hist +51 804 - Concrete Barriers and Glare Screens →MEASUREMENT AND PAYMENT
- 17:14, 12 May 2021 diff hist +51 803 - Concrete Sidewalk, Ramps, and Steps →MEASUREMENT AND PAYMENT
- 17:14, 12 May 2021 diff hist +51 802 - Concrete Curb, Gutter, and Dividers →MEASUREMENT AND PAYMENT
- 17:13, 12 May 2021 diff hist +51 801 - Concrete Driveways →MEASUREMENT AND PAYMENT
- 16:38, 12 May 2021 diff hist +65 Division 7 Supplemental Information →Notification current
- 16:37, 12 May 2021 diff hist +51 719 - Earth Retaining Structures →MEASUREMENT AND PAYMENT
- 16:36, 12 May 2021 diff hist +51 718 - Drilled Shafts →MEASUREMENT AND PAYMENT
- 16:36, 12 May 2021 diff hist +51 717 - Downspouts and Drains →MEASUREMENT AND PAYMENT
- 16:36, 12 May 2021 diff hist +51 716 - Shop Cleaning and Coating Structural Steel →MEASUREMENT AND PAYMENT
- 16:36, 12 May 2021 diff hist +51 715 - Cleaning and Coating Existing Structural Steel →MEASUREMENT AND PAYMENT
- 16:35, 12 May 2021 diff hist +51 714 - Temporary Structures and Approaches →MEASUREMENT AND PAYMENT
- 16:35, 12 May 2021 diff hist +51 713 - Bridge Rehabilitation, Steel →MEASUREMENT AND PAYMENT
- 16:34, 12 May 2021 diff hist +51 712 - Bridge Rehabilitation, Concrete →MEASUREMENT AND PAYMENT
- 16:34, 12 May 2021 diff hist +51 711 - Bridge Railings →MEASUREMENT AND PAYMENT
- 16:34, 12 May 2021 diff hist +51 710 - Waterproofing and Protective Covers →MEASUREMENT AND PAYMENT
- 16:34, 12 May 2021 diff hist +51 709 - Timber Sturctures →MEASUREMENT AND PAYMENT
- 16:33, 12 May 2021 diff hist +52 708 - Prestressed Concrete →Final Shipment Payment
- 16:33, 12 May 2021 diff hist +52 707 - Structural Steel →Stockpile Payment
- 16:32, 12 May 2021 diff hist +51 706 - Structural Concrete →MEASUREMENT AND PAYMENT
- 16:32, 12 May 2021 diff hist +51 705 - Foundation Piling →MEASUREMENT AND PAYMENT
- 16:32, 12 May 2021 diff hist +51 704 - Steel Sheet Piling and Cofferdams →MEASUREMENT AND PAYMENT
- 16:31, 12 May 2021 diff hist +51 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes →MEASUREMENT AND PAYMENT
- 10:43, 11 May 2021 diff hist +410 Main Page →Recent Major Changes: Clarification of Prerequisites for Office Tech Certification
- 10:30, 11 May 2021 diff hist +108 Certified Office Technician Process →Office Technician Certification Requirements: Clarification of Prerequisites for Office Tech Certification
- 17:14, 6 May 2021 diff hist +50 702 - Mortar and Grout →MEASUREMENT AND PAYMENT
- 17:11, 6 May 2021 diff hist +50 701 - Portland Cement Concrete for Structures →MEASUREMENT AND PAYMENT
- 17:11, 6 May 2021 diff hist +50 700 - Closure of Unsafe Structures →Responsibility to Close Unsafe Structures current
- 16:31, 6 May 2021 diff hist +49 506 - Slurry Seal →MEASUREMENT AND PAYMENT
- 16:31, 6 May 2021 diff hist +49 505 - Chip Seals →MEASUREMENT AND PAYMENT
- 16:30, 6 May 2021 diff hist +49 504 - Micro-Surfacing →Delayed Acceptance
- 16:30, 6 May 2021 diff hist +49 503 - Paver Placed Surface Seal →MEASUREMENT AND PAYMENT
- 16:09, 6 May 2021 diff hist +49 502 - HMA Crack Treatment →MEASUREMENT AND PAYMENT
- 16:08, 6 May 2021 diff hist +51 501 - Plant Produced Hot Mix Asphalt →Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant
- 16:06, 6 May 2021 diff hist +37 Mandrel Testing of Plastic Pipe →Nine Point Mandrel with Proving Rings current
- 16:05, 6 May 2021 diff hist +49 406 - Precast Three-Sided, Arch, and Box Culverts →MEASUREMENT AND PAYMENT
- 16:05, 6 May 2021 diff hist +48 405 - Pump Station Construction →MEASUREMENT AND PAYMENT
- 16:05, 6 May 2021 diff hist +49 404 - Underdrain →MEASUREMENT AND PAYMENT
- 16:04, 6 May 2021 diff hist +49 403 - Drainage Structures →MEASUREMENT AND PAYMENT
- 16:04, 6 May 2021 diff hist +49 402 - Storm Sewers →Video Inspection of Installed Storm Sewers
- 16:04, 6 May 2021 diff hist +25 401 - Culverts →Video Inspection
- 16:03, 6 May 2021 diff hist +81 308 - Geotextiles for Base →MEASUREMENT AND PAYMENT
- 16:02, 6 May 2021 diff hist +49 307 - Aggregate Shoulders and Approaches →Tare Weights
- 16:02, 6 May 2021 diff hist +49 306 - Aggregate Surface Course →MEASUREMENT AND PAYMENT
- 16:02, 6 May 2021 diff hist +49 305 - HMA Base Crushing and Shaping →MEASUREMENT AND PAYMENT
- 16:01, 6 May 2021 diff hist +49 304 - Rubbilizing Existing PCC Pavement →MEASUREMENT AND PAYMENT
- 16:01, 6 May 2021 diff hist +49 303 - Open Graded Drainage Course →MEASUREMENT AND PAYMENT
- 16:01, 6 May 2021 diff hist +49 302 - Aggregate Base Courses →Payment by Weight
- 16:00, 6 May 2021 diff hist +49 301 - Subbase →MEASUREMENT AND PAYMENT
- 15:58, 6 May 2021 diff hist 0 208 - Soil Erosion and Sedimentation Control (NPDES) →MEASUREMENT AND PAYMENT
- 15:57, 6 May 2021 diff hist +49 209 - Project Cleanup →MEASUREMENT AND PAYMENT
- 15:57, 6 May 2021 diff hist +49 208 - Soil Erosion and Sedimentation Control (NPDES) →MEASUREMENT AND PAYMENT
- 15:57, 6 May 2021 diff hist +49 207 - Obliterating Roadway →MEASUREMENT AND PAYMENT
- 15:57, 6 May 2021 diff hist +49 206 - Excavation and Backfill for Structures →Excavation for Structures
- 15:56, 6 May 2021 diff hist +49 205 - Roadway Earthwork →Computer Processing of Earthwork
- 15:56, 6 May 2021 diff hist +49 204 - Removing Miscellaneous Structures and Materials →Site Clearing (Form RE-18)
- 15:55, 6 May 2021 diff hist 0 202 - Removing Trees, Stumps, and Corduroy →Instructions for Removing Corduroy
- 15:55, 6 May 2021 diff hist +49 203 - Removing Drainage Structures, Culverts, and Sewers →MEASUREMENT AND PAYMENT
- 15:55, 6 May 2021 diff hist +49 202 - Removing Trees, Stumps, and Corduroy →Instructions for Removing Corduroy
- 15:54, 6 May 2021 diff hist +49 201 - Clearing →Daily Reports On Clearing
- 15:51, 6 May 2021 diff hist +24 Project Closeout Escalation of Accountability →Potential Closeout Problems with Remedies
- 15:49, 6 May 2021 diff hist +25 Local Agency Program (LAP) →Other Local Agency Partnerships
- 15:48, 6 May 2021 diff hist +24 Letter to File →Major Deficiencies current
- 15:47, 6 May 2021 diff hist +24 Interim File Review →LAP Project Considerations current
- 15:46, 6 May 2021 diff hist +2 FPR Frequently Asked Questions →What is the difference between a major and minor deficiency? current
- 15:45, 6 May 2021 diff hist +13 Final Project Review Report
- 15:44, 6 May 2021 diff hist +13 Final Project Review →FAQs for Final Project Review
- 15:43, 6 May 2021 diff hist +24 FHWA CAP Action Plans →2019 CAP Targeted Action Plan current
- 15:42, 6 May 2021 diff hist +25 E-Signature →Guidance for Non-MDOT Users
- 15:35, 6 May 2021 diff hist -97 E-Construction →Resources
- 15:34, 6 May 2021 diff hist +23 Dispute Review Board (DRB) →Dispute Review Board Process Flowchart
- 15:30, 6 May 2021 diff hist +23 Construction Field Services Indirect Testing Charges →Inappropriate Use
- 15:29, 6 May 2021 diff hist +23 Certified Office Technician Process →Office Technician Certification Requirements
- 15:28, 6 May 2021 diff hist +24 Certified Engineer Process →LAP Project Considerations
- 15:09, 6 May 2021 diff hist +25 150 - Mobilization →MEASUREMENT AND PAYMENT
- 15:06, 6 May 2021 diff hist +32 109.03 Payments for Increased or Decreased Quantities current
- 15:06, 6 May 2021 diff hist +32 109.02 Scope of Payment current
- 15:05, 6 May 2021 diff hist +32 109.01 Measurement of Quantities current
- 14:53, 6 May 2021 diff hist +24 106 - Quality Assurance Acceptance Program →QUALITY ASSURANCE ACCEPTANCE PROGRAM
- 14:46, 6 May 2021 diff hist +25 Disadvantaged Business Enterprises (DBE) →Questions
- 14:42, 6 May 2021 diff hist +24 101 - Terms, Format, and Conditions →DEFINITIONS
- 17:06, 28 April 2021 diff hist +379 m Main Page →Recent Minor Changes: Updated FieldManager contact info (web address and e-mail)
- 11:26, 28 April 2021 diff hist +54 Local Agency Program (LAP) →Local Agency Program Assistance/Resources: added new FieldManager link and email address
- 11:16, 28 April 2021 diff hist 0 Main Page →Recent Major Changes: Updated the compare here review for the Final Estimates updates
- 11:06, 28 April 2021 diff hist +25 109.07 Final Inspection, Acceptance, and Final Payment →LAP Project Considerations: Updated info in last paragraph
- 11:04, 28 April 2021 diff hist +165 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Updated Processing Final Estimates Item #2
- 14:46, 19 April 2021 diff hist 0 Main Page →Recent Major Changes: Fixed format issue with 109.07 and updated the "compare here" link
- 14:45, 19 April 2021 diff hist +2 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Fixed format issue
- 14:22, 19 April 2021 diff hist +356 Main Page →Recent Major Changes: Updated Final Estimates Information
- 14:19, 19 April 2021 diff hist +171 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Updated Final Estimates information
- 12:02, 19 April 2021 diff hist 0 N File:Final Estimate Submittal Form-Figure 109-2.jpg current
- 12:02, 19 April 2021 diff hist 0 N File:Final Estimate Submittal Form-Figure 109-1.jpg current
- 12:46, 17 March 2021 diff hist +366 Main Page →Recent Minor Changes: Updated Section 811-Permanent Pavement Markings, Material Documentation section.
- 12:32, 17 March 2021 diff hist +300 811 - Permanent Pavement Markings →Material Documentation: Updated information for Permanent Pavement Markings
- 12:27, 17 March 2021 diff hist 0 N File:PW 1585 Form.jpg current
- 14:22, 15 March 2021 diff hist +292 Main Page →Recent Major Changes: Created new Digital Calculations for Payment section under Division 1, Section 104
- 09:39, 15 March 2021 diff hist +7,593 N Digital Calculations for Payment Created new Digital Calculations for Payment section in Division 1, Section 104
- 09:19, 15 March 2021 diff hist 0 N File:Digital Calc Image 6.jpg current
- 09:15, 15 March 2021 diff hist 0 N File:Digital Calc Image 5.jpg current
- 09:13, 15 March 2021 diff hist 0 N File:Digital Calc Image 4.jpg current
- 08:59, 15 March 2021 diff hist 0 N File:Digital Calc Image 3.jpg current
- 08:50, 15 March 2021 diff hist 0 N File:Digital Calc Image 2.jpg current
- 08:48, 15 March 2021 diff hist 0 N File:Digital Calc Image 1.jpg current
- 17:05, 3 March 2021 diff hist +334 Main Page →Recent Minor Changes: Revised to add requirement to notify CFS resource specialist when Form 1568 for Project Staging or Excess Material Location on MDOT ROW is approved
- 11:40, 25 February 2021 diff hist -458 103.02 Contract Revisions →Requirements for FHWA Review: Reset formatting again to encompass all FHWA subsections into one section
- 11:37, 25 February 2021 diff hist -9 103.02 Contract Revisions
- 10:13, 25 February 2021 diff hist -124 103.02 Contract Revisions Format change for Requirements for FHWA Review and subsections below
- 17:56, 9 February 2021 diff hist 0 Main Page →Recent Major Changes: Updated the information for item #6, Site Activation/Deactivation
- 17:54, 9 February 2021 diff hist +86 715 - Cleaning and Coating Existing Structural Steel →Other Documentation: Changed information in item #6
- 17:24, 9 February 2021 diff hist +677 Main Page →Recent Major Changes: Added Section 712 & 715 updates regarding the Site Activation/Deactivation information.
- 17:17, 9 February 2021 diff hist +276 712 - Bridge Rehabilitation, Concrete →Hydrodemolition: Added the Site Activation/Deactivation information to the Hydrodemolition section
- 17:15, 9 February 2021 diff hist -279 715 - Cleaning and Coating Existing Structural Steel →Other Documentation: Updated information for Site Activation/Deactivation
- 15:55, 8 February 2021 diff hist +341 Main Page →Recent Minor Changes
- 15:52, 8 February 2021 diff hist 0 Certified Engineer Process →Current Certified Engineers
- 15:51, 8 February 2021 diff hist +7 Certified Engineer Process →Current Certified Engineers: Updated Certified Engineer List-Feb. 2021
- 15:50, 8 February 2021 diff hist 0 N File:MDOT Engineer certification list - FEB 2021.jpg current
- 15:47, 8 February 2021 diff hist 0 N File:MDOT Engineer certification list - FEB 2021.pdf current
- 14:45, 2 February 2021 diff hist +370 Main Page →Recent Minor Changes: Updated the MDOT Claims Procedure with a revised version as of Feb. 2021
- 14:35, 2 February 2021 diff hist +9 104.10 Claim for Extra Compensation or Extension of Time →General: added revised MDOT Claims Procedure
- 14:18, 2 February 2021 diff hist 0 File:MDOT Construction Contractor Claims Procedure - Rev. 2-2021.pdf SchaeferS uploaded a new version of "File:MDOT Construction Contractor Claims Procedure - Rev. 2-2021.pdf" current
- 14:16, 2 February 2021 diff hist 0 N File:MDOT Construction Contractor Claims Procedure - Rev. 2-2021.pdf
- 16:10, 30 November 2020 diff hist +291 Main Page →Recent Minor Changes: added IDR - moved from Major Change Table
- 16:10, 30 November 2020 diff hist -291 Main Page →Recent Major Changes: moving to minor change table
- 16:03, 30 November 2020 diff hist +291 Main Page →Recent Major Changes: Added IDR revisions
- 15:59, 30 November 2020 diff hist +352 FieldManager →Inspector's Daily Report (IDR): Updated wording in IDR
- 10:37, 5 November 2020 diff hist -10 Main Page →Recent Major Changes
- 10:37, 5 November 2020 diff hist 0 Main Page →Recent Major Changes
- 10:36, 5 November 2020 diff hist +10 Main Page →Recent Major Changes: Fixed typo
- 07:52, 19 October 2020 diff hist +400 Main Page →Recent Major Changes: Updated Construction Field Services Indirect Testing codes
- 07:47, 19 October 2020 diff hist 0 Construction Field Services Indirect Testing Charges Updated construction field services indirect testing codes
- 16:24, 28 September 2020 diff hist +283 Main Page →Recent Major Changes: Updated with Div. 7, section 700 - Closure of Unsafe Structures
- 16:20, 28 September 2020 diff hist +6 MediaWiki:Sidebar
- 16:16, 28 September 2020 diff hist 0 N File:MDOT Memo on Bridge Closure policy final.pdf current
- 16:14, 28 September 2020 diff hist +3,092 N 700 - Closure of Unsafe Structures Created new 700 section under Div 7, approved by Jason Gutting
- 16:12, 28 September 2020 diff hist +29 MediaWiki:Sidebar Fixed new section (700) name
- 16:11, 28 September 2020 diff hist +38 MediaWiki:Sidebar Creating new 700 section under Div. 7, approved by Jason Gutting