- 16:52, 20 July 2022 diff hist -1 307 - Aggregate Shoulders and Approaches →MEASUREMENT AND PAYMENT
- 16:52, 20 July 2022 diff hist +264 307 - Aggregate Shoulders and Approaches →MEASUREMENT AND PAYMENT: Updated Measurement and Payment information section
- 15:59, 11 July 2022 diff hist +388 Main Page →Recent Minor Changes: Updated link to DRB and pdf to July 2022
- 15:56, 11 July 2022 diff hist -4 Dispute Review Board (DRB) →Dispute Review Board (DRB): Updated new website page link for Sitecore current
- 15:55, 11 July 2022 diff hist +10 Dispute Review Board (DRB) →Dispute Review Board Process Flowchart: Updated flowchart July 2022
- 15:54, 11 July 2022 diff hist 0 N File:DRB Flowchart July 2022.jpg current
- 15:53, 11 July 2022 diff hist 0 N File:DRB Flowchart July 2022.pdf current
- 10:00, 5 July 2022 diff hist +330 Main Page →Recent Minor Changes: Added updated certified engineer list for June 2022
- 09:56, 5 July 2022 diff hist -3 Certified Engineer Process →Current Certified Engineers: Updated to June 2022 Engineer Certification List
- 09:54, 5 July 2022 diff hist 0 N File:Engineer certification list - JUNE 2022.jpg current
- 09:53, 5 July 2022 diff hist 0 N File:Engineer certification list - JUNE 2022.pdf current
- 15:03, 30 June 2022 diff hist +447 Main Page →Recent Minor Changes: Added 102.02 update
- 14:57, 30 June 2022 diff hist +77 102.02 Contents of Proposal - Progress Clause →Progress Clause: Updated several lead times
- 08:34, 21 June 2022 diff hist +358 Main Page →Recent Major Changes: Added temporary special markings price negotiation costs
- 08:23, 21 June 2022 diff hist 0 811 - Permanent Pavement Markings →Temporary Special Markings for Cold Weather: Updated Temporary Special Markings Price Negotiation Costs
- 13:40, 7 June 2022 diff hist +320 Main Page →Recent Minor Changes: Added 208 Turbidity Section
- 11:51, 26 May 2022 diff hist +397 Main Page →Recent Minor Changes: Updated content/added samples to Process for Documenting Certified Materials in FieldManager
- 16:09, 25 May 2022 diff hist +189 Process for Documenting Certified Materials in FieldManager →Process for Documenting Certified Materials in FieldManager: Updated text and added visual sample forms for Concrete, HMA, and Aggregate current
- 16:03, 25 May 2022 diff hist 0 N File:Sample HMA MSL - Form 0501.jpg current
- 16:03, 25 May 2022 diff hist 0 N File:Sample HMA MSL - Form 0501.pdf current
- 16:03, 25 May 2022 diff hist 0 N File:Sample Concrete MSL - Form 0501.jpg current
- 16:03, 25 May 2022 diff hist 0 N File:Sample Concrete MSL - Form 0501.pdf current
- 16:02, 25 May 2022 diff hist 0 N File:Sample Aggregate MSL - Form 0501.jpg current
- 16:02, 25 May 2022 diff hist 0 N File:Sample Aggregate MSL - Form 0501.pdf current
- 15:20, 25 May 2022 diff hist -373 102.02 Contents of Proposal - Progress Clause →Contract Time Determination (CTD): updated website link after Sitecore migration
- 15:57, 18 May 2022 diff hist +695 208 - Soil Erosion and Sedimentation Control (NPDES) Added Turbidity Curtain subsection
- 11:29, 18 May 2022 diff hist +409 Main Page →Recent Major Changes: Added AASHTOWare Project Construction & Materials Software Manual to Major Change Table
- 16:23, 17 May 2022 diff hist +125 MediaWiki:Sidebar Added AASHTOWare wiki link to sidebar
- 11:45, 5 May 2022 diff hist +409 Main Page →Recent Major Changes: Updated section 811
- 09:59, 5 May 2022 diff hist -974 811 - Permanent Pavement Markings Updated Uniform Price Adjustment... section
- 09:51, 5 May 2022 diff hist +9 811 - Permanent Pavement Markings →Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint
- 09:50, 5 May 2022 diff hist +1,420 811 - Permanent Pavement Markings →Durable Pavement Markings: Updated section
- 11:52, 19 April 2022 diff hist +8 Notice of Non-Compliance with Contract Requirements Added page number for Section 104.01.B
- 10:44, 19 April 2022 diff hist +345 Main Page →Recent Major Changes: Updated Documentation Guide 2022
- 10:33, 19 April 2022 diff hist -1 MediaWiki:Sidebar Updated Documentation Guide 2022
- 10:32, 19 April 2022 diff hist 0 N File:Documentation Guide 2022 Final 04062022.pdf current
- 14:45, 14 April 2022 diff hist +324 Main Page →Recent Minor Changes: Updated Certified Engineer List April 2022
- 14:41, 14 April 2022 diff hist -3 Certified Engineer Process →Current Certified Engineers: Updated Certified Engineer List to April 2022
- 14:40, 14 April 2022 diff hist 0 N File:Engineer certification list - April 2022.jpg current
- 14:40, 14 April 2022 diff hist 0 N File:Engineer certification list - April 2022.pdf current
- 09:01, 14 April 2022 diff hist +361 Main Page →Recent Minor Changes: Updated DRB Flowchart 2022
- 08:54, 14 April 2022 diff hist +58 Dispute Review Board (DRB) →Dispute Review Board Process Flowchart: Updated flowchart to 2022
- 08:49, 14 April 2022 diff hist 0 N File:DRB Flowchart 2022.jpg current
- 08:38, 14 April 2022 diff hist 0 N File:DRB Flowchart 2022.pdf current
- 09:08, 17 March 2022 diff hist +75 109.07 Final Inspection, Acceptance, and Final Payment →Post Final Estimate Process: Changed image to "Change State"
- 09:05, 17 March 2022 diff hist 0 N File:109.07 - 3.5 Post Final Estimate Process image.jpg current
- 07:50, 17 March 2022 diff hist +23 Main Page →Recent Major Changes: Fixed link in Major Change for Holiday Traffic Safety Provisions (by removing 108) and changed "what changed" to "view here."
- 15:17, 15 March 2022 diff hist +362 Main Page →Recent Minor Changes: added 109.07 reorganized section
- 15:11, 15 March 2022 diff hist -9,506 109.07 Final Inspection, Acceptance, and Final Payment Updated and reorganized section to clarifying information
- 12:02, 9 March 2022 diff hist 0 N File:109.07 Form 1120 image.jpg current
- 12:00, 9 March 2022 diff hist 0 N File:109.07 Form 1120 image 03092022.pdf current
- 16:25, 17 February 2022 diff hist +338 Main Page →Recent Minor Changes: Updated alpha/numeric standard naming convention lists as of 2/17/2022
- 16:12, 17 February 2022 diff hist +10 E-Construction →e-Construction/Paper File System: Updated alpha/numeric standard naming convention lists
- 16:09, 17 February 2022 diff hist 0 N File:Standard Naming Convention Revised 02-17-2022 - ALPHA NEW.pdf current
- 16:08, 17 February 2022 diff hist 0 N File:Standard Naming Convention Revised 02-17-2022 - NUMERIC - NEW.pdf current
- 14:29, 16 February 2022 diff hist +153 307 - Aggregate Shoulders and Approaches →MEASUREMENT AND PAYMENT: updated/correct link for 109.01 and 307.03 referencing 2020 spec book
- 14:26, 16 February 2022 diff hist +24 307 - Aggregate Shoulders and Approaches →GENERAL: updated/correct link for 812 referencing 2020 spec book
- 14:24, 16 February 2022 diff hist +22 302 - Aggregate Base Courses →Payment by Weight: updated/correct link for 109.01B2 referencing 2020 spec book current
- 14:21, 16 February 2022 diff hist +23 302 - Aggregate Base Courses →Payment by Weight: updated/correct link for 302.03 referencing 2020 spec book
- 14:18, 16 February 2022 diff hist +21 304 - Rubbilizing Existing PCC Pavement →Equipment: updated/corrected link for 304.03 referencing 2020 spec book current
- 14:16, 16 February 2022 diff hist +39 304 - Rubbilizing Existing PCC Pavement →MATERIALS: updated/correct link for 902.05 referencing 2020 spec book
- 14:14, 16 February 2022 diff hist +36 302 - Aggregate Base Courses →MATERIALS: updated/correct link for 902.05 referencing 2020 spec book
- 14:12, 16 February 2022 diff hist +149 301 - Subbase →MEASUREMENT AND PAYMENT: added reference and link to 205.04 in 2020 spec book current
- 11:35, 3 February 2022 diff hist -4 Main Page →Recent Minor Changes
- 11:33, 3 February 2022 diff hist +339 Main Page →Recent Minor Changes: Updated Certified Engineer List February 3, 2022
- 11:28, 3 February 2022 diff hist +8 Certified Engineer Process →Current Certified Engineers: Updated Certified Engineer list Feb. 3, 2022
- 11:26, 3 February 2022 diff hist 0 N File:Engineer certification list - Feb 3 2022.pdf current
- 11:25, 3 February 2022 diff hist 0 N File:Engineer certification list - Feb 3 2022.jpg current
- 16:07, 24 January 2022 diff hist -162 103.02 Contract Revisions Undo revision 6599 by SchaeferS (talk) Section needs further FHWA review/approval Tag: Undo
- 16:06, 24 January 2022 diff hist -21 103.02 Contract Revisions Undo revision 6600 by SchaeferS (talk) Section needs further FHWA review/approval Tag: Undo
- 16:06, 24 January 2022 diff hist 0 103.02 Contract Revisions Undo revision 6602 by SchaeferS (talk) Needs further FHWA review/approval Tag: Undo
- 16:03, 24 January 2022 diff hist -437 Main Page →Recent Major Changes: Removing 103.02 update, needs further FHWA review and approval
- 13:04, 24 January 2022 diff hist 0 103.02 Contract Revisions →Requirements for FHWA Review on Risk-Based Project Involvement (RBPI): fixed link
- 10:14, 24 January 2022 diff hist +437 Main Page →Recent Major Changes: Updated FHWA Risk-Based Project Involvement Stewardship & Oversight Plan (S&O Plan) reference from PoDI.
- 16:12, 20 January 2022 diff hist +21 m 103.02 Contract Revisions →Requirements for FHWA Review on Risk-Based Project Involvement (RBPI): added bolding
- 16:11, 20 January 2022 diff hist +162 103.02 Contract Revisions →Requirements for FHWA Review on Projects of Division Interest (PoDI): Updated to FHWA Risk-Based Project Involvement (RBPI) Projects and Stewardship & Oversight Plan (S&O Plan)
- 16:01, 19 January 2022 diff hist -138 m 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) Removed 2012 Spec Book tagline link
- 15:52, 19 January 2022 diff hist -159 m Work Order Removed 2012 Spec Book tagline link current
- 15:52, 19 January 2022 diff hist -161 m Weight Limit Waivers Removed 2012 Spec Book tagline link current
- 15:51, 19 January 2022 diff hist -158 m Structural Fabrication Quality Manual Removed 2012 Spec Book tagline link
- 15:48, 19 January 2022 diff hist -159 m Quality Initiatives and Adjustments Removed 2012 Spec Book tagline link
- 15:47, 19 January 2022 diff hist -170 m Project Delays Due to a Utility Company Removed 2012 Spec Book tagline link
- 15:47, 19 January 2022 diff hist -161 m Processing Sewage/Storm Water Damage Claims Removed 2012 Spec Book tagline link current
- 15:46, 19 January 2022 diff hist -166 m Process for Documenting Certified Materials in FieldManager Removed 2012 Spec Book tagline link
- 15:45, 19 January 2022 diff hist -138 m Preconstruction Meeting Removed 2012 Spec Book tagline link
- 15:39, 19 January 2022 diff hist -161 m Notice of Non-Compliance with Contract Requirements Removed 2012 Spec Book tagline link
- 14:59, 19 January 2022 diff hist -166 m Materials Quality Assurance Procedures Manual Removed 2012 Spec Book tagline link
- 14:56, 19 January 2022 diff hist -170 m Holiday Traffic Safety Provisions Removed 2012 Spec Book tagline link
- 14:54, 19 January 2022 diff hist -159 m Extending Project Limits Removed 2012 Spec Book tagline link current
- 14:47, 19 January 2022 diff hist -161 m Digital Calculations for Payment Removed 2012 Spec Book tagline link
- 14:46, 19 January 2022 diff hist -138 m 102.01 Prequalification of Bidders Removed 2012 Spec Book tagline link
- 14:44, 19 January 2022 diff hist -161 m Contractor's Equipment and Traffic Control Removed 2012 Spec Book tagline link current
- 14:44, 19 January 2022 diff hist -138 m Contract Administration and Oversight Guidelines for Projects Containing Warranty Work Removed 2012 Spec Book tagline link current
- 14:43, 19 January 2022 diff hist -161 m Construction Value Engineering Change Proposal (VECP) Removed 2012 Spec Book tagline link
- 12:47, 19 January 2022 diff hist -163 m 824 - Contractor Staking Removed 2012 Spec Book tagline link current
- 12:47, 19 January 2022 diff hist -156 m 823 - Water Mains Removed 2012 Spec Book tagline link
- 12:47, 19 January 2022 diff hist -163 m 822 - Ground or Cut Centerline and Shoulder Corrugations Removed 2012 Spec Book tagline link current
- 12:46, 19 January 2022 diff hist -174 m 821 - Preservation of Land Monuments and Property Corners Removed 2012 Spec Book tagline link current
- 12:46, 19 January 2022 diff hist -161 m 820 - Traffic Signals Removed 2012 Spec Book tagline link
- 12:46, 19 January 2022 diff hist -170 m 819 - Electrical and Lighting Removed 2012 Spec Book tagline link
- 12:45, 19 January 2022 diff hist -161 m 817 - Landscape Mowing Removed 2012 Spec Book tagline link current
- 12:45, 19 January 2022 diff hist -163 m 816 - Turf Establishment Removed 2012 Spec Book tagline link
- 12:45, 19 January 2022 diff hist -154 m 815 - Landscaping Removed 2012 Spec Book tagline link
- 12:44, 19 January 2022 diff hist -158 m 814 - Paved Ditches Removed 2012 Spec Book tagline link current
- 12:44, 19 January 2022 diff hist -161 m 813 - Slope Protection Removed 2012 Spec Book tagline link
- 12:44, 19 January 2022 diff hist -164 m 812 - Temporary Traffic Control for Construction Zone Operations Removed 2012 Spec Book tagline link
- 12:43, 19 January 2022 diff hist -165 m 811 - Permanent Pavement Markings Removed 2012 Spec Book tagline link
- 12:43, 19 January 2022 diff hist -172 m 810 - Permanent Traffic Signs and Supports Removed 2012 Spec Book tagline link
- 12:42, 19 January 2022 diff hist -157 m 809 - Field Office Removed 2012 Spec Book tagline link current
- 12:42, 19 January 2022 diff hist -150 m 808 - Fencing Removed 2012 Spec Book tagline link current
- 12:42, 19 January 2022 diff hist -168 m 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts Removed 2012 Spec Book tagline link
- 12:41, 19 January 2022 diff hist -164 m 806 - Bicycle Paths Removed 2012 Spec Book tagline link current
- 11:50, 19 January 2022 diff hist -153 m 805 - Hot Mix Asphalt Curb Removed 2012 Spec Book tagline link current
- 11:50, 19 January 2022 diff hist -173 m 804 - Concrete Barriers and Glare Screens Removed 2012 Spec Book tagline link current
- 11:50, 19 January 2022 diff hist -171 m 803 - Concrete Sidewalk, Ramps, and Steps Removed 2012 Spec Book tagline link current
- 11:49, 19 January 2022 diff hist -171 m 802 - Concrete Curb, Gutter, and Dividers Removed 2012 Spec Book tagline link current
- 11:49, 19 January 2022 diff hist -163 m 801 - Concrete Driveways Removed 2012 Spec Book tagline link current
- 11:48, 19 January 2022 diff hist -171 m 719 - Earth Retaining Structures Removed 2012 Spec Book tagline link current
- 11:48, 19 January 2022 diff hist -159 m 718 - Drilled Shafts Removed 2012 Spec Book tagline link
- 11:48, 19 January 2022 diff hist -168 m 717 - Downspouts and Drains Removed 2012 Spec Book tagline link current
- 11:47, 19 January 2022 diff hist -174 m 716 - Shop Cleaning and Coating Structural Steel Removed 2012 Spec Book tagline link current
- 11:47, 19 January 2022 diff hist -175 m 715 - Cleaning and Coating Existing Structural Steel Removed 2012 Spec Book tagline link
- 11:47, 19 January 2022 diff hist -170 m 714 - Temporary Structures and Approaches Removed 2012 Spec Book tagline link current
- 11:46, 19 January 2022 diff hist -165 m 713 - Bridge Rehabilitation, Steel Removed 2012 Spec Book tagline link
- 11:46, 19 January 2022 diff hist -168 m 712 - Bridge Rehabilitation, Concrete Removed 2012 Spec Book tagline link current
- 11:46, 19 January 2022 diff hist -160 m 711 - Bridge Railings Removed 2012 Spec Book tagline link current
- 11:46, 19 January 2022 diff hist -171 m 710 - Waterproofing and Protective Covers Removed 2012 Spec Book tagline link
- 11:45, 19 January 2022 diff hist -162 m 709 - Timber Sturctures Removed 2012 Spec Book tagline link
- 11:45, 19 January 2022 diff hist -167 m 708 - Prestressed Concrete Removed 2012 Spec Book tagline link current
- 11:45, 19 January 2022 diff hist -169 m 707 - Structural Steel Removed 2012 Spec Book tagline link
- 11:44, 19 January 2022 diff hist -168 m 706 - Structural Concrete Removed 2012 Spec Book tagline link
- 11:44, 19 January 2022 diff hist -162 m 705 - Foundation Piling Removed 2012 Spec Book tagline link
- 11:44, 19 January 2022 diff hist -171 m 704 - Steel Sheet Piling and Cofferdams Removed 2012 Spec Book tagline link
- 11:43, 19 January 2022 diff hist -172 m 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes Removed 2012 Spec Book tagline link current
- 11:43, 19 January 2022 diff hist -163 m 702 - Mortar and Grout Removed 2012 Spec Book tagline link current
- 11:43, 19 January 2022 diff hist -165 m 701 - Portland Cement Concrete for Structures Removed 2012 Spec Book tagline link current
- 11:41, 19 January 2022 diff hist -168 m 603 - Concrete Pavement Restoration Removed 2012 Spec Book tagline link
- 11:41, 19 January 2022 diff hist -180 m 602 - Concrete Pavement Construction Removed 2012 Spec Book tagline link
- 10:46, 18 January 2022 diff hist +369 Main Page →Recent Minor Changes: Added 102.02 change for lead times of Delineator and 3# U-Channel Posts
- 10:41, 18 January 2022 diff hist 0 102.02 Contents of Proposal - Progress Clause →Progress Clause: Updated Typical Long-Lead Items for Delineator and 3# U-Channel Posts
- 12:41, 13 January 2022 diff hist -50 501 - Plant Produced Hot Mix Asphalt →Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant: Removed section cat
- 12:39, 13 January 2022 diff hist +25 501 - Plant Produced Hot Mix Asphalt →Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant: Updated cat section
- 17:48, 12 January 2022 diff hist -171 m 406 - Precast Three-Sided, Arch, and Box Culverts Removed 2012 Spec Book tagline link current
- 17:47, 12 January 2022 diff hist -167 m 405 - Pump Station Construction Removed 2012 Spec Book tagline link current
- 17:47, 12 January 2022 diff hist -155 m 404 - Underdrain Removed 2012 Spec Book tagline link current
- 17:47, 12 January 2022 diff hist -165 m 403 - Drainage Structures Removed 2012 Spec Book tagline link current
- 17:47, 12 January 2022 diff hist -158 m 402 - Storm Sewers Removed 2012 Spec Book tagline link current
- 17:46, 12 January 2022 diff hist -159 m 401 - Culverts Removed 2012 Spec Book tagline link
- 17:46, 12 January 2022 diff hist -161 m 209 - Project Cleanup Removed 2012 Spec Book tagline link
- 17:46, 12 January 2022 diff hist -166 m 207 - Obliterating Roadway Removed 2012 Spec Book tagline link
- 17:45, 12 January 2022 diff hist -171 m 206 - Excavation and Backfill for Structures Removed 2012 Spec Book tagline link
- 17:45, 12 January 2022 diff hist -163 m 205 - Roadway Earthwork Removed 2012 Spec Book tagline link
- 17:45, 12 January 2022 diff hist -169 m 204 - Removing Miscellaneous Structures and Materials Removed 2012 Spec Book tagline link
- 17:44, 12 January 2022 diff hist -176 m 203 - Removing Drainage Structures, Culverts, and Sewers Removed 2012 Spec Book tagline link
- 17:44, 12 January 2022 diff hist -169 m 202 - Removing Trees, Stumps, and Corduroy Removed 2012 Spec Book tagline link
- 17:43, 12 January 2022 diff hist -151 m 201 - Clearing Removed 2012 Spec Book tagline link
- 17:42, 12 January 2022 diff hist -155 m 150 - Mobilization Removed 2012 Spec Book tagline link current
- 17:40, 12 January 2022 diff hist -171 m 108.10 Liquidated Damages Removed 2012 Spec Book tagline link
- 17:39, 12 January 2022 diff hist -171 m 108.07 Extension of Time on Work Day Contracts Removed 2012 Spec Book tagline link
- 17:38, 12 January 2022 diff hist -171 m 108.01 Subcontracting of Contract Work Removed 2012 Spec Book tagline link current
- 17:36, 12 January 2022 diff hist -176 m 107.15 Compliance with Laws; Environmental Protection Removed 2012 Spec Book tagline link current
- 17:35, 12 January 2022 diff hist -176 m 107.12 Contractor's Responsibility for Utility Property and Services Removed 2012 Spec Book tagline link
- 17:34, 12 January 2022 diff hist -168 m 106 - Quality Assurance Acceptance Program Removed 2012 Spec Book tagline link current
- 17:33, 12 January 2022 diff hist -179 m 105.10 Buy America Source of Steel and Iron Removed 2012 Spec Book tagline link
- 17:32, 12 January 2022 diff hist -167 m 105.07 Handling and Transporting Materials Removed 2012 Spec Book tagline link current
- 17:31, 12 January 2022 diff hist -167 m 105.01 Quality and Scope of Supply Removed 2012 Spec Book tagline link
- 17:29, 12 January 2022 diff hist -161 m 104.07 Contractor Obligations Removed 2012 Spec Book tagline link
- 17:28, 12 January 2022 diff hist -161 m 104.01 Authority of the Department Removed 2012 Spec Book tagline link current
- 17:28, 12 January 2022 diff hist -159 m 103.02 Contract Revisions Removed 2012 Spec Book tagline link
- 17:23, 12 January 2022 diff hist -168 m 101 - Terms, Format, and Conditions Removed 2012 Spec Book tagline link current
- 16:59, 12 January 2022 diff hist -167 m 308 - Geotextiles for Base Removed 2012 Spec Book tagline link current
- 16:58, 12 January 2022 diff hist -170 m 307 - Aggregate Shoulders and Approaches Removed 2012 Spec Book tagline link
- 16:58, 12 January 2022 diff hist -166 m 306 - Aggregate Surface Course Removed 2012 Spec Book tagline link current
- 16:44, 12 January 2022 diff hist -176 m 305 - HMA Base Crushing and Shaping Removed 2012 Spec Book tagline link current
- 16:43, 12 January 2022 diff hist -168 m 304 - Rubbilizing Existing PCC Pavement Removed 2012 Spec Book tagline link
- 16:43, 12 January 2022 diff hist -147 m 303 - Open Graded Drainage Course Removed 2012 Spec Book tagline current
- 16:07, 12 January 2022 diff hist -168 302 - Aggregate Base Courses Removed 2012 Spec Book tagline
- 12:25, 12 January 2022 diff hist -150 m 301 - Subbase Removed 2012 tagline link
- 16:27, 5 January 2022 diff hist +100 Main Page →Recent Major Changes: Updated Summary fields for 109.07 and 107.09
- 09:00, 5 January 2022 diff hist +352 Main Page →Recent Minor Changes: Added Final Project Review Report update
- 08:57, 5 January 2022 diff hist +1 Final Project Review Report Replaced Final Project Review Report User Guide with September 2020 version current
- 08:55, 5 January 2022 diff hist 0 N File:Final Project Review Report User Guide 9-2020.pdf current
- 15:13, 4 January 2022 diff hist +361 Main Page →Recent Minor Changes: Updated info for 102.02
- 14:53, 4 January 2022 diff hist +25 102.02 Contents of Proposal - Progress Clause →Progress Clause: updated/added to Guardrail - Steel typical long-lead times
- 14:30, 4 January 2022 diff hist +357 Main Page →Recent Major Changes: added 109.07 update
- 14:25, 4 January 2022 diff hist -71 109.07 Final Inspection, Acceptance, and Final Payment →Acceptance of Work: Removed outdated images and added updated image
- 14:21, 4 January 2022 diff hist 0 N File:Form 1120 image.pdf current
- 14:09, 4 January 2022 diff hist 0 File:Form 1120 image.jpg SchaeferS uploaded a new version of File:Form 1120 image.jpg current
- 14:08, 4 January 2022 diff hist 0 N File:Form 1120 image.jpg
- 10:25, 4 January 2022 diff hist +93 107.09 Archeological and Historical Findings →LAP Project Considerations: Added link to LAP definitions
- 10:23, 4 January 2022 diff hist +445 Main Page →Recent Minor Changes: Added Archeological and Historical Findings Resource for LAP
- 10:20, 4 January 2022 diff hist +166 Local Agency Program (LAP) →Construction Manual index/links for ‘LAP Project Considerations’: added Archeological and Historical Findings as a resource
- 10:14, 4 January 2022 diff hist +99 107.09 Archeological and Historical Findings →LAP Project Considerations
- 13:42, 21 December 2021 diff hist -363 109.07 Final Inspection, Acceptance, and Final Payment →Acceptance of Work: Updated section information
- 10:30, 21 December 2021 diff hist +316 Main Page →Recent Major Changes: Added 107.09 Archeological and Historical Findings Update
- 10:28, 21 December 2021 diff hist +9 107.09 Archeological and Historical Findings Added link to top
- 10:27, 21 December 2021 diff hist +412 107.09 Archeological and Historical Findings Updated entire section
- 18:17, 15 December 2021 diff hist -156 506 - Slurry Seal Removed 2012 Spec Book tagline at top of page current
- 18:17, 15 December 2021 diff hist -158 504 - Micro-Surfacing Removed 2012 Spec Book tagline at top of page current
- 18:16, 15 December 2021 diff hist -174 503 - Paver Placed Surface Seal Removed 2012 Spec Book tagline at top of page current
- 18:15, 15 December 2021 diff hist -165 502 - HMA Crack Treatment Removed 2012 Spec Book tagline at top of page current
- 18:14, 15 December 2021 diff hist -155 505 - Chip Seals removed 2012 Spec Book tagline at top of page current
- 18:14, 15 December 2021 diff hist 0 505 - Chip Seals →Longitudinal Construction Joints: Updated 2012 Spec Book reference to 2020
- 10:19, 15 December 2021 diff hist -162 501 - Plant Produced Hot Mix Asphalt removed 2012 Spec Book tagline at top of page
- 15:57, 14 December 2021 diff hist +259 Main Page →Recent Minor Changes: Added Division 5, updating 2012 to 2020 Spec Book reference
- 15:53, 14 December 2021 diff hist 0 501 - Plant Produced Hot Mix Asphalt →Plant Procedures: Updated 2012 to 2020 Spec Book reference
- 11:33, 13 December 2021 diff hist +5 Main Page →Recent Minor Changes
- 11:33, 13 December 2021 diff hist -8 Main Page →Recent Minor Changes
- 11:32, 13 December 2021 diff hist +340 Main Page →Recent Minor Changes: Added December's updated Certified Engineer List 12132021
- 11:30, 13 December 2021 diff hist -3 Certified Engineer Process →Current Certified Engineers: Updated Engineer Certification List 12132021
- 11:29, 13 December 2021 diff hist 0 N File:Engineer certification list 12132021.jpg current
- 11:28, 13 December 2021 diff hist 0 N File:Engineer certification list 12132021.pdf current
- 17:24, 23 November 2021 diff hist +443 Main Page →Recent Major Changes: Added new subsection, "Sediment Discharge into Waters of the State of Michigan," in Section 208.
- 17:20, 23 November 2021 diff hist +1,306 208 - Soil Erosion and Sedimentation Control (NPDES) →Non-Compliance of SESC: Created new section "Sediment Discharge into Waters of the State of Michigan"
- 13:35, 18 November 2021 diff hist -11,388 Main Page →Recent Major Changes: removed items more than a year old
- 17:01, 17 November 2021 diff hist +129 103.02 Contract Revisions →Design Errors: Added Premium Costs for Design Errors and Field Issues link under Design Errors Section
- 11:28, 17 November 2021 diff hist +369 Main Page →Recent Major Changes: Added new section Design Errors and updated Premium Costs for Design Errors and Field Issues to 103.02 Contract Revisions section.
- 10:55, 17 November 2021 diff hist +2,849 103.02 Contract Revisions Added new section "Design Errors" and updated "Premium Costs for Design Errors and Field Issues" section
- 08:50, 17 November 2021 diff hist +358 Main Page →Recent Minor Changes: Added Bi-Annual FieldManager User Account Verification Process update
- 17:27, 16 November 2021 diff hist +606 FieldManager →Bi-Annual FieldManager User Account Verification Process: Updated content in its entirety.
- 09:01, 27 October 2021 diff hist +333 Main Page →Recent Major Changes: updated several sections of 103.02 Construction Contract Modification Process Overview
- 08:55, 27 October 2021 diff hist -104 103.02 Contract Revisions →Tier III - Bureau of Field Services Approval: Updated content for Tier III - Bureau of Field Services Approval
- 08:55, 27 October 2021 diff hist -84 103.02 Contract Revisions →Tier II - Region Approval: Updated content for Tier II - Region Approval
- 08:54, 27 October 2021 diff hist -212 103.02 Contract Revisions →Tier I - TSC Approval: Updated content for Tier I - TSC Approval
- 08:52, 27 October 2021 diff hist +215 103.02 Contract Revisions →Contract Modification Development: New content for Contract Modification Development
- 16:17, 20 October 2021 diff hist +412 Main Page →Recent Minor Changes: Added change for 108.01
- 16:09, 20 October 2021 diff hist -256 108.01 Subcontracting of Contract Work →Construction Subcontract Process: Removed text re: engineer's responsibility to check subcontractors are prequalified prior to start of work.
- 07:58, 18 October 2021 diff hist +360 Main Page →Recent Major Changes: Added CFS FY 2022 coding for indirect testing
- 07:52, 18 October 2021 diff hist 0 Construction Field Services Indirect Testing Charges →Inappropriate Use: Updated Program coding for Development/PE and Construction/CE for FY 2022
- 16:16, 12 October 2021 diff hist +339 Main Page →Recent Minor Changes: Added Certified Engineer List for October 2021
- 16:13, 12 October 2021 diff hist -9 Certified Engineer Process →Current Certified Engineers: Updated Engineer Certifications List for October 2021
- 16:11, 12 October 2021 diff hist 0 N File:Engineer Certification List - 10122021.jpg current
- 16:10, 12 October 2021 diff hist 0 N File:Engineer Certification List - 10122021.pdf current
- 14:42, 7 October 2021 diff hist +478 Main Page →Recent Major Changes: added new section for 103.02
- 14:36, 7 October 2021 diff hist +7 103.02 Contract Revisions →LAP Project Considerations
- 14:36, 7 October 2021 diff hist +2,131 103.02 Contract Revisions →LAP Project Considerations: Added LAP Project Considerations for Construction Contract and Construction Engineering Phase Funding Revisions
- 14:13, 7 October 2021 diff hist +64 MediaWiki:Sidebar Added Div 4 Supplemental Information link to sidebar
- 10:25, 7 October 2021 diff hist +295 103.02 Contract Revisions →Construction Contract and Construction Engineering Phase Funding Revisions: Added more of the new section Construction Contract and Construction Engineering Phase Funding Revisions
- 10:19, 7 October 2021 diff hist 0 N File:Construction Contract and Construction Engineering Phase Funding Revisions image 2.jpg current
- 10:11, 7 October 2021 diff hist +107 103.02 Contract Revisions →Construction Contract and Construction Engineering Phase Funding Revisions: added link to LAP Considerations at bottom
- 10:10, 7 October 2021 diff hist +5,342 103.02 Contract Revisions →Contract Revisions - See Also: Added new section "Construction Contract and Construction Engineering Phase Funding Revisions"
- 10:04, 7 October 2021 diff hist 0 N File:Construction Contract and Construction Engineering Phase Funding Revisions image 10072021.png.jpg current
- 10:02, 7 October 2021 diff hist 0 N File:Construction Contract and Construction Engineering Phase Funding Revisions image 10072021.png current
- 08:11, 6 October 2021 diff hist +40 E-Construction →Resources: Fixed incorrect link in Resources
- 16:23, 5 October 2021 diff hist +345 Main Page →Recent Minor Changes: Added update for Accessing MDOT's DataSource and Resource sections in E-Construction
- 16:12, 5 October 2021 diff hist -28 E-Construction →Resources: Updated MDOT PW Explorer Install Instructions for external users
- 16:10, 5 October 2021 diff hist 0 N File:ProjectWise Explorer CONNECT Edition Quick Guide - Externals doc 10052021.pdf current
- 16:06, 5 October 2021 diff hist -1,237 E-Construction →Accessing MDOT's DataSource: Updated section information
- 10:31, 28 September 2021 diff hist +338 Main Page →Recent Major Changes: Added 108.01 updated information
- 10:27, 28 September 2021 diff hist +98 108.01 Subcontracting of Contract Work →SUBCONTRACTING OF CONTRACT WORK: added Code of Federal Regulations Title 23, Section 635.116 link
- 15:26, 27 September 2021 diff hist -1,783 108.01 Subcontracting of Contract Work Fully updated/replaced information for 108.01, still need correct link to Code of Federal Regulations, Title 23, Section 613.116.
- 14:29, 23 September 2021 diff hist +5,426 Division 4 Supplemental Information Moved Mandrel Testing to Division 4 Supplemental Information current
- 14:21, 23 September 2021 diff hist +61 Division 2 Supplemental Information Updated categories current
- 15:56, 22 September 2021 diff hist +12 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Updated Form 1105 to 1105A
- 15:55, 22 September 2021 diff hist +176 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Added back in images and updated Figures 109-1 through 109-3
- 15:43, 22 September 2021 diff hist 0 N File:Final Estimats Form 1105A.jpg current
- 15:39, 22 September 2021 diff hist 0 N File:Final Estimats Form 1105A.pdf current
- 13:11, 16 September 2021 diff hist +286 Main Page →Recent Major Changes
- 13:04, 16 September 2021 diff hist -7 Preconstruction Meeting →Preconstruction Meeting Minutes: Updated Trunk Line and Local Agency Program Boilerplate Preconstruction Meeting Minutes
- 12:58, 16 September 2021 diff hist 0 File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - August 2021.docx SchaeferS uploaded a new version of File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - August 2021.docx current
- 12:54, 16 September 2021 diff hist 0 N File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes 2021.docx current
- 11:18, 8 September 2021 diff hist -18 Main Page →Recent Major Changes: Fix 108.05 url
- 11:16, 8 September 2021 diff hist +320 Main Page →Recent Major Changes: added information for 108.05 Progress Schedule section replacement
- 11:13, 8 September 2021 diff hist +4,899 108.05 Progress Schedule →Progress Schedule, Form 1130: Replaced all information for 108.05 Progress Schedule section
- 08:53, 2 September 2021 diff hist +314 Main Page →Recent Major Changes: Added Final Estimates information and replaced Figure 109-1
- 08:08, 2 September 2021 diff hist +652 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Updated Final Estimates information and Figure 109-1
- 08:07, 2 September 2021 diff hist 0 N File:Final Estimate Submittal Form - Figure 109-1 Aug 2021.jpg current
- 16:30, 1 September 2021 diff hist +98 N Division 4 Supplemental Information Created Division 4 Supplemental Information - awaiting answer as to what should be published here
- 16:27, 1 September 2021 diff hist +324 Main Page →Recent Minor Changes: Updated LAP Boilerplate Preconstruction Meeting Minutes for August 2021
- 16:24, 1 September 2021 diff hist -15 Preconstruction Meeting →LAP Project Considerations: Updated Meeting Minutes with August 2021 file
- 16:21, 1 September 2021 diff hist 0 N File:LOCAL AGENCY PROGRAM Boilerplate Preconstruction Meeting Minutes - August 2021.docx
- 15:05, 1 September 2021 diff hist +348 Main Page →Recent Major Changes: Updated e-Construction section of Division 1 Supplemental
- 13:13, 1 September 2021 diff hist -29 E-Construction →e-Construction/Paper File System
- 13:10, 1 September 2021 diff hist -35,196 E-Construction →e-Construction/Paper File System: Removed table and updated Standard Naming Convention Alpha/Numeric lists
- 12:50, 1 September 2021 diff hist +69 N File:Standard Naming Convention Revised 08-31-2021 - NUMERIC.pdf Standard_Naming_Convention_Revised_08-31-2021_-_NUMERIC current
- 12:49, 1 September 2021 diff hist +67 N File:Standard Naming Convention Revised 08-31-2021 - ALPHA.pdf Standard_Naming_Convention_Revised_08-31-2021_-_ALPHA current
- 15:41, 30 August 2021 diff hist +43 Main Page →Recent Minor Changes
- 15:40, 30 August 2021 diff hist +336 Main Page →Recent Minor Changes: Updated 102.02 Guardrail - Steel Lead Times
- 15:38, 30 August 2021 diff hist -11 102.02 Contents of Proposal - Progress Clause →Progress Clause: Updated Guardrail - Steel Lead Times
- 07:59, 25 August 2021 diff hist +501 Main Page →Recent Major Changes: Added Requirements for FHWA Review on Project of Division Interest (PoDI) information
- 07:54, 25 August 2021 diff hist -571 103.02 Contract Revisions →Requirements for FHWA Review: Updated all text for this section and added image
- 07:43, 25 August 2021 diff hist +8 103.02 Contract Revisions →Approval Thresholds: Fixed alignment of image, no image position was included
- 07:31, 25 August 2021 diff hist 0 N File:103.02 Contract Revisions-Requirements for FHWA Review.jpg current
- 07:09, 3 August 2021 diff hist +363 Main Page →Recent Major Changes: Added 105 Structural Fabrication Quality Manual update
- 07:05, 3 August 2021 diff hist -584 Structural Fabrication Quality Manual Updated content on page
- 17:18, 26 July 2021 diff hist +13 Main Page →Recent Minor Changes: updated Division to Division 1 Supplemental for Certified Engineer List
- 17:18, 26 July 2021 diff hist +338 Main Page →Recent Minor Changes: Current Certified Engineers
- 17:14, 26 July 2021 diff hist +10 m Certified Engineer Process →Current Certified Engineers: Added July 2021 Engineer Certification List
- 17:10, 26 July 2021 diff hist 0 N File:MDOT Engineer certification list - July 2021.jpg current
- 17:07, 26 July 2021 diff hist -10 Certified Engineer Process Undo revision 6341 by SchaeferS (talk) Tag: Undo
- 17:06, 26 July 2021 diff hist +10 Certified Engineer Process →Current Certified Engineers
- 17:05, 26 July 2021 diff hist -10 Certified Engineer Process Undo revision 6339 by SchaeferS (talk) Tag: Undo
- 17:04, 26 July 2021 diff hist +10 m Certified Engineer Process →Current Certified Engineers: Updated July 2021 Engineer Certification List
- 16:58, 26 July 2021 diff hist 0 N File:MDOT Engineer certification list - July 2021.pdf current
- 15:15, 26 July 2021 diff hist +89 Materials Quality Assurance Procedures Manual →2021 Summary of Revisions to the MQAP: editorial change from Geotextile Services Unit to Geotechnical Services Unit
- 14:00, 20 July 2021 diff hist +372 Main Page →Recent Minor Changes: 103.02 updates
- 13:56, 20 July 2021 diff hist -549 m 103.02 Contract Revisions →Revisions to the Contract: Minor text edits of 103.02 Revisions to the Contract and 2012 to 2020 Spec Book reference updates
- 16:14, 14 July 2021 diff hist +336 Main Page →Recent Minor Changes: Updated information in subsection 109.05C Negotiated Prices
- 15:59, 14 July 2021 diff hist +1,112 109.05 Payment for Contract Revisions →Negotiated Prices (109.05.C): Updated section language
- 15:52, 14 July 2021 diff hist -31 Frequently Searched Items Updated link to Prevailing Wage
- 17:22, 13 July 2021 diff hist +85 Prevailing Wage →Additional Information: Added in category information
- 17:20, 13 July 2021 diff hist -48 107.01 Laws to be Observed →General Information: removed some content referencing Prevailing Wage. current
- 17:19, 13 July 2021 diff hist +602 Main Page →Recent Minor Changes: Added changes for 107.01 and new Prevailing Wage page
- 17:14, 13 July 2021 diff hist -62,476 107.01 Laws to be Observed Added link to new Prevailing Wage page Tag: Replaced
- 17:13, 13 July 2021 diff hist +2,949 Prevailing Wage updated information
- 17:10, 13 July 2021 diff hist -11 Prevailing Wage Updated "email this page" link for new Prevailing Wage Section
- 17:10, 13 July 2021 diff hist +59,828 N Prevailing Wage Created new Prevailing Wage section
- 16:52, 13 July 2021 diff hist +313 Main Page →Recent Minor Changes: Added Force Account Work Section info
- 16:39, 13 July 2021 diff hist -396 Force Account Work Updated "email this page" links
- 14:28, 13 July 2021 diff hist +55 109.05 Payment for Contract Revisions Added link to Force Account Work
- 14:24, 13 July 2021 diff hist +120 Force Account Work Added link to Section 109.05 Payment for Contract Revisions
- 14:21, 13 July 2021 diff hist -18 Force Account Work Updated link to email this page
- 14:21, 13 July 2021 diff hist +41,214 N Force Account Work Created new Force Account Work page
- 17:37, 16 June 2021 diff hist +391 Main Page →Recent Minor Changes: Added DRB updates
- 17:35, 16 June 2021 diff hist -440 Dispute Review Board (DRB) →Dispute Review Board (DRB): Made text edits as well as add link to DRB webpage.
- 16:37, 16 June 2021 diff hist +387 Main Page →Recent Major Changes: Added 102.02 update information
- 16:36, 16 June 2021 diff hist -329 Main Page →Recent Minor Changes: Moved Boilerplate information to Major Change Table
- 16:24, 16 June 2021 diff hist +329 Main Page →Recent Minor Changes: added the update for Boilerplate Progress Clause Template June 2021
- 16:22, 16 June 2021 diff hist +16 102.02 Contents of Proposal - Progress Clause →Boilerplate Progress Clause: Updated document link for June 2021
- 16:18, 16 June 2021 diff hist 0 N File:Boilerplate Progress Clause Template June 2021.docx current
- 15:30, 16 June 2021 diff hist +296 Main Page →Recent Major Changes: Added 2021 MQAP content
- 15:25, 16 June 2021 diff hist +10,520 Materials Quality Assurance Procedures Manual Added 2021 Summary of Revisions to the MQAP section
- 07:24, 16 June 2021 diff hist +333 Main Page →Recent Minor Changes: Updated section content for Certified Engineer Process
- 07:21, 16 June 2021 diff hist +4 Certified Engineer Process →MDOT Certified Engineer Process: Updated section with new content
- 13:48, 8 June 2021 diff hist +367 Main Page →Recent Minor Changes: Added the updated Progress Clause Template for LAP Projects-May 2021 document
- 13:45, 8 June 2021 diff hist +3 102.02 Contents of Proposal - Progress Clause →LAP Project Considerations: Updated the Progress Clause Template for LAP Projects May 2021
- 13:44, 8 June 2021 diff hist 0 N File:Progress Clause Template LAP projects 2020 Specs FINAL 05192021 726007 7.pdf current
- 11:28, 8 June 2021 diff hist +325 Main Page →Recent Minor Changes: Updated certified engineer list to June 2021
- 11:24, 8 June 2021 diff hist -9 Certified Engineer Process →Current Certified Engineers: updated certified engineers list to June 2021
- 11:22, 8 June 2021 diff hist 0 N File:Engineer certification list - JUNE 2021.jpg current
- 11:19, 8 June 2021 diff hist 0 N File:Engineer certification list - JUNE 2021.pdf current
- 10:19, 8 June 2021 diff hist +11 107.01 Laws to be Observed →Additional Information: Fixed Annual Prevailing Wage Training url
- 10:18, 8 June 2021 diff hist 0 N File:Prevailing Wage Training 2021.pdf current
- 10:15, 8 June 2021 diff hist +243 Main Page →Recent Major Changes: Added new Section 107.01 Laws to be Observed
- 09:53, 8 June 2021 diff hist -2 107.01 Laws to be Observed Updated email this page info at top
- 09:53, 8 June 2021 diff hist -159 107.01 Laws to be Observed Updated header
- 09:43, 8 June 2021 diff hist +63,170 107.01 Laws to be Observed Created 107.01 Laws to be Observed
- 14:20, 7 June 2021 diff hist 0 N File:107.01 Laws to be Observed - MDOT Delinquent Notice2 293050 7 (1).docx current
- 14:19, 7 June 2021 diff hist 0 N File:107.01 Laws to be Observed - MDOT Delinquent Notice1 293048 7.docx current
- 14:13, 7 June 2021 diff hist 0 N File:107.01 Laws to be Observed - MDOT Deficient Notice 2 293047 7 (3).docx current
- 15:44, 3 June 2021 diff hist 0 N File:107.01 - Jobsite Post Fig. 2.png current
- 15:42, 3 June 2021 diff hist 0 N File:107.01 - Jobsite Post Fig. 1.png current
- 13:30, 24 May 2021 diff hist +278 Main Page →Recent Minor Changes: Edited FHWA Electronic Signature information
- 13:20, 24 May 2021 diff hist +26 E-Signature →Guidance for Non-MDOT Users: Edited FHWA Electronic Signature information
- 09:35, 20 May 2021 diff hist +293 Main Page →Recent Minor Changes: Added E-Signature Guidance for FHWA staff as non-MDOT users
- 09:31, 20 May 2021 diff hist +107 m E-Signature →Guidance for Non-MDOT Users: added FHWA guidance for non-MDOT users
- 17:20, 12 May 2021 diff hist +51 824 - Contractor Staking →MEASUREMENT AND PAYMENT
- 17:20, 12 May 2021 diff hist +51 823 - Water Mains →MEASUREMENT AND PAYMENT
- 17:20, 12 May 2021 diff hist +51 822 - Ground or Cut Centerline and Shoulder Corrugations →MEASUREMENT AND PAYMENT
- 17:19, 12 May 2021 diff hist +51 821 - Preservation of Land Monuments and Property Corners →MEASUREMENT AND PAYMENT
- 17:19, 12 May 2021 diff hist +51 820 - Traffic Signals →MEASUREMENT AND PAYMENT
- 17:19, 12 May 2021 diff hist +51 819 - Electrical and Lighting →MEASUREMENT AND PAYMENT
- 17:18, 12 May 2021 diff hist +51 817 - Landscape Mowing →MEASUREMENT AND PAYMENT
- 17:18, 12 May 2021 diff hist +51 816 - Turf Establishment →MEASUREMENT AND PAYMENT
- 17:18, 12 May 2021 diff hist +51 815 - Landscaping →Final Inspection
- 17:17, 12 May 2021 diff hist +51 814 - Paved Ditches →MEASUREMENT AND PAYMENT
- 17:17, 12 May 2021 diff hist +51 813 - Slope Protection →MEASUREMENT AND PAYMENT
- 17:17, 12 May 2021 diff hist +29 812 - Temporary Traffic Control for Construction Zone Operations →MEASUREMENT AND PAYMENT
- 17:16, 12 May 2021 diff hist +51 811 - Permanent Pavement Markings →Temporary Special Markings for Cold Weather
- 17:16, 12 May 2021 diff hist +51 810 - Permanent Traffic Signs and Supports →MEASUREMENT AND PAYMENT
- 17:16, 12 May 2021 diff hist +51 809 - Field Office →MEASUREMENT AND PAYMENT
- 17:15, 12 May 2021 diff hist +51 808 - Fencing →MEASUREMENT AND PAYMENT
- 17:15, 12 May 2021 diff hist +51 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts →MEASUREMENT AND PAYMENT
- 17:15, 12 May 2021 diff hist +51 806 - Bicycle Paths →MEASUREMENT AND PAYMENT
- 17:15, 12 May 2021 diff hist +51 805 - Hot Mix Asphalt Curb →MEASUREMENT AND PAYMENT
- 17:14, 12 May 2021 diff hist +51 804 - Concrete Barriers and Glare Screens →MEASUREMENT AND PAYMENT
- 17:14, 12 May 2021 diff hist +51 803 - Concrete Sidewalk, Ramps, and Steps →MEASUREMENT AND PAYMENT
- 17:14, 12 May 2021 diff hist +51 802 - Concrete Curb, Gutter, and Dividers →MEASUREMENT AND PAYMENT
- 17:13, 12 May 2021 diff hist +51 801 - Concrete Driveways →MEASUREMENT AND PAYMENT
- 16:38, 12 May 2021 diff hist +65 Division 7 Supplemental Information →Notification current
- 16:37, 12 May 2021 diff hist +51 719 - Earth Retaining Structures →MEASUREMENT AND PAYMENT
- 16:36, 12 May 2021 diff hist +51 718 - Drilled Shafts →MEASUREMENT AND PAYMENT
- 16:36, 12 May 2021 diff hist +51 717 - Downspouts and Drains →MEASUREMENT AND PAYMENT
- 16:36, 12 May 2021 diff hist +51 716 - Shop Cleaning and Coating Structural Steel →MEASUREMENT AND PAYMENT
- 16:36, 12 May 2021 diff hist +51 715 - Cleaning and Coating Existing Structural Steel →MEASUREMENT AND PAYMENT
- 16:35, 12 May 2021 diff hist +51 714 - Temporary Structures and Approaches →MEASUREMENT AND PAYMENT
- 16:35, 12 May 2021 diff hist +51 713 - Bridge Rehabilitation, Steel →MEASUREMENT AND PAYMENT
- 16:34, 12 May 2021 diff hist +51 712 - Bridge Rehabilitation, Concrete →MEASUREMENT AND PAYMENT
- 16:34, 12 May 2021 diff hist +51 711 - Bridge Railings →MEASUREMENT AND PAYMENT
- 16:34, 12 May 2021 diff hist +51 710 - Waterproofing and Protective Covers →MEASUREMENT AND PAYMENT
- 16:34, 12 May 2021 diff hist +51 709 - Timber Sturctures →MEASUREMENT AND PAYMENT
- 16:33, 12 May 2021 diff hist +52 708 - Prestressed Concrete →Final Shipment Payment
- 16:33, 12 May 2021 diff hist +52 707 - Structural Steel →Stockpile Payment
- 16:32, 12 May 2021 diff hist +51 706 - Structural Concrete →MEASUREMENT AND PAYMENT
- 16:32, 12 May 2021 diff hist +51 705 - Foundation Piling →MEASUREMENT AND PAYMENT
- 16:32, 12 May 2021 diff hist +51 704 - Steel Sheet Piling and Cofferdams →MEASUREMENT AND PAYMENT
- 16:31, 12 May 2021 diff hist +51 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes →MEASUREMENT AND PAYMENT
- 10:43, 11 May 2021 diff hist +410 Main Page →Recent Major Changes: Clarification of Prerequisites for Office Tech Certification
- 10:30, 11 May 2021 diff hist +108 Certified Office Technician Process →Office Technician Certification Requirements: Clarification of Prerequisites for Office Tech Certification
- 17:14, 6 May 2021 diff hist +50 702 - Mortar and Grout →MEASUREMENT AND PAYMENT
- 17:11, 6 May 2021 diff hist +50 701 - Portland Cement Concrete for Structures →MEASUREMENT AND PAYMENT
- 17:11, 6 May 2021 diff hist +50 700 - Closure of Unsafe Structures →Responsibility to Close Unsafe Structures current
- 16:31, 6 May 2021 diff hist +49 506 - Slurry Seal →MEASUREMENT AND PAYMENT
- 16:31, 6 May 2021 diff hist +49 505 - Chip Seals →MEASUREMENT AND PAYMENT
- 16:30, 6 May 2021 diff hist +49 504 - Micro-Surfacing →Delayed Acceptance
- 16:30, 6 May 2021 diff hist +49 503 - Paver Placed Surface Seal →MEASUREMENT AND PAYMENT
- 16:09, 6 May 2021 diff hist +49 502 - HMA Crack Treatment →MEASUREMENT AND PAYMENT
- 16:08, 6 May 2021 diff hist +51 501 - Plant Produced Hot Mix Asphalt →Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant
- 16:06, 6 May 2021 diff hist +37 Mandrel Testing of Plastic Pipe →Nine Point Mandrel with Proving Rings current
- 16:05, 6 May 2021 diff hist +49 406 - Precast Three-Sided, Arch, and Box Culverts →MEASUREMENT AND PAYMENT
- 16:05, 6 May 2021 diff hist +48 405 - Pump Station Construction →MEASUREMENT AND PAYMENT
- 16:05, 6 May 2021 diff hist +49 404 - Underdrain →MEASUREMENT AND PAYMENT
- 16:04, 6 May 2021 diff hist +49 403 - Drainage Structures →MEASUREMENT AND PAYMENT
- 16:04, 6 May 2021 diff hist +49 402 - Storm Sewers →Video Inspection of Installed Storm Sewers
- 16:04, 6 May 2021 diff hist +25 401 - Culverts →Video Inspection
- 16:03, 6 May 2021 diff hist +81 308 - Geotextiles for Base →MEASUREMENT AND PAYMENT
- 16:02, 6 May 2021 diff hist +49 307 - Aggregate Shoulders and Approaches →Tare Weights
- 16:02, 6 May 2021 diff hist +49 306 - Aggregate Surface Course →MEASUREMENT AND PAYMENT
- 16:02, 6 May 2021 diff hist +49 305 - HMA Base Crushing and Shaping →MEASUREMENT AND PAYMENT
- 16:01, 6 May 2021 diff hist +49 304 - Rubbilizing Existing PCC Pavement →MEASUREMENT AND PAYMENT
- 16:01, 6 May 2021 diff hist +49 303 - Open Graded Drainage Course →MEASUREMENT AND PAYMENT
- 16:01, 6 May 2021 diff hist +49 302 - Aggregate Base Courses →Payment by Weight
- 16:00, 6 May 2021 diff hist +49 301 - Subbase →MEASUREMENT AND PAYMENT
- 15:58, 6 May 2021 diff hist 0 208 - Soil Erosion and Sedimentation Control (NPDES) →MEASUREMENT AND PAYMENT
- 15:57, 6 May 2021 diff hist +49 209 - Project Cleanup →MEASUREMENT AND PAYMENT
- 15:57, 6 May 2021 diff hist +49 208 - Soil Erosion and Sedimentation Control (NPDES) →MEASUREMENT AND PAYMENT
- 15:57, 6 May 2021 diff hist +49 207 - Obliterating Roadway →MEASUREMENT AND PAYMENT
- 15:57, 6 May 2021 diff hist +49 206 - Excavation and Backfill for Structures →Excavation for Structures
- 15:56, 6 May 2021 diff hist +49 205 - Roadway Earthwork →Computer Processing of Earthwork
- 15:56, 6 May 2021 diff hist +49 204 - Removing Miscellaneous Structures and Materials →Site Clearing (Form RE-18)
- 15:55, 6 May 2021 diff hist 0 202 - Removing Trees, Stumps, and Corduroy →Instructions for Removing Corduroy
- 15:55, 6 May 2021 diff hist +49 203 - Removing Drainage Structures, Culverts, and Sewers →MEASUREMENT AND PAYMENT
- 15:55, 6 May 2021 diff hist +49 202 - Removing Trees, Stumps, and Corduroy →Instructions for Removing Corduroy
- 15:54, 6 May 2021 diff hist +49 201 - Clearing →Daily Reports On Clearing
- 15:51, 6 May 2021 diff hist +24 Project Closeout Escalation of Accountability →Potential Closeout Problems with Remedies
- 15:49, 6 May 2021 diff hist +25 Local Agency Program (LAP) →Other Local Agency Partnerships
- 15:48, 6 May 2021 diff hist +24 Letter to File →Major Deficiencies current
- 15:47, 6 May 2021 diff hist +24 Interim File Review →LAP Project Considerations current
- 15:46, 6 May 2021 diff hist +2 FPR Frequently Asked Questions →What is the difference between a major and minor deficiency? current
- 15:45, 6 May 2021 diff hist +13 Final Project Review Report
- 15:44, 6 May 2021 diff hist +13 Final Project Review →FAQs for Final Project Review
- 15:43, 6 May 2021 diff hist +24 FHWA CAP Action Plans →2019 CAP Targeted Action Plan current
- 15:42, 6 May 2021 diff hist +25 E-Signature →Guidance for Non-MDOT Users
- 15:35, 6 May 2021 diff hist -97 E-Construction →Resources
- 15:34, 6 May 2021 diff hist +23 Dispute Review Board (DRB) →Dispute Review Board Process Flowchart
- 15:30, 6 May 2021 diff hist +23 Construction Field Services Indirect Testing Charges →Inappropriate Use
- 15:29, 6 May 2021 diff hist +23 Certified Office Technician Process →Office Technician Certification Requirements
- 15:28, 6 May 2021 diff hist +24 Certified Engineer Process →LAP Project Considerations
- 15:09, 6 May 2021 diff hist +25 150 - Mobilization →MEASUREMENT AND PAYMENT
- 15:06, 6 May 2021 diff hist +32 109.03 Payments for Increased or Decreased Quantities current
- 15:06, 6 May 2021 diff hist +32 109.02 Scope of Payment current
- 15:05, 6 May 2021 diff hist +32 109.01 Measurement of Quantities current
- 14:53, 6 May 2021 diff hist +24 106 - Quality Assurance Acceptance Program →QUALITY ASSURANCE ACCEPTANCE PROGRAM
- 14:46, 6 May 2021 diff hist +25 Disadvantaged Business Enterprises (DBE) →Questions
- 14:42, 6 May 2021 diff hist +24 101 - Terms, Format, and Conditions →DEFINITIONS
- 17:06, 28 April 2021 diff hist +379 m Main Page →Recent Minor Changes: Updated FieldManager contact info (web address and e-mail)
- 11:26, 28 April 2021 diff hist +54 Local Agency Program (LAP) →Local Agency Program Assistance/Resources: added new FieldManager link and email address
- 11:16, 28 April 2021 diff hist 0 Main Page →Recent Major Changes: Updated the compare here review for the Final Estimates updates
- 11:06, 28 April 2021 diff hist +25 109.07 Final Inspection, Acceptance, and Final Payment →LAP Project Considerations: Updated info in last paragraph
- 11:04, 28 April 2021 diff hist +165 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Updated Processing Final Estimates Item #2
- 14:46, 19 April 2021 diff hist 0 Main Page →Recent Major Changes: Fixed format issue with 109.07 and updated the "compare here" link
- 14:45, 19 April 2021 diff hist +2 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Fixed format issue
- 14:22, 19 April 2021 diff hist +356 Main Page →Recent Major Changes: Updated Final Estimates Information
- 14:19, 19 April 2021 diff hist +171 109.07 Final Inspection, Acceptance, and Final Payment →Final Estimates: Updated Final Estimates information
- 12:02, 19 April 2021 diff hist 0 N File:Final Estimate Submittal Form-Figure 109-2.jpg current
- 12:02, 19 April 2021 diff hist 0 N File:Final Estimate Submittal Form-Figure 109-1.jpg current
- 12:46, 17 March 2021 diff hist +366 Main Page →Recent Minor Changes: Updated Section 811-Permanent Pavement Markings, Material Documentation section.
- 12:32, 17 March 2021 diff hist +300 811 - Permanent Pavement Markings →Material Documentation: Updated information for Permanent Pavement Markings
- 12:27, 17 March 2021 diff hist 0 N File:PW 1585 Form.jpg current
- 14:22, 15 March 2021 diff hist +292 Main Page →Recent Major Changes: Created new Digital Calculations for Payment section under Division 1, Section 104
- 09:39, 15 March 2021 diff hist +7,593 N Digital Calculations for Payment Created new Digital Calculations for Payment section in Division 1, Section 104
- 09:19, 15 March 2021 diff hist 0 N File:Digital Calc Image 6.jpg current
- 09:15, 15 March 2021 diff hist 0 N File:Digital Calc Image 5.jpg current
- 09:13, 15 March 2021 diff hist 0 N File:Digital Calc Image 4.jpg current
- 08:59, 15 March 2021 diff hist 0 N File:Digital Calc Image 3.jpg current
- 08:50, 15 March 2021 diff hist 0 N File:Digital Calc Image 2.jpg current
- 08:48, 15 March 2021 diff hist 0 N File:Digital Calc Image 1.jpg current
- 17:05, 3 March 2021 diff hist +334 Main Page →Recent Minor Changes: Revised to add requirement to notify CFS resource specialist when Form 1568 for Project Staging or Excess Material Location on MDOT ROW is approved
- 11:40, 25 February 2021 diff hist -458 103.02 Contract Revisions →Requirements for FHWA Review: Reset formatting again to encompass all FHWA subsections into one section
- 11:37, 25 February 2021 diff hist -9 103.02 Contract Revisions
- 10:13, 25 February 2021 diff hist -124 103.02 Contract Revisions Format change for Requirements for FHWA Review and subsections below
- 17:56, 9 February 2021 diff hist 0 Main Page →Recent Major Changes: Updated the information for item #6, Site Activation/Deactivation
- 17:54, 9 February 2021 diff hist +86 715 - Cleaning and Coating Existing Structural Steel →Other Documentation: Changed information in item #6
- 17:24, 9 February 2021 diff hist +677 Main Page →Recent Major Changes: Added Section 712 & 715 updates regarding the Site Activation/Deactivation information.
- 17:17, 9 February 2021 diff hist +276 712 - Bridge Rehabilitation, Concrete →Hydrodemolition: Added the Site Activation/Deactivation information to the Hydrodemolition section
- 17:15, 9 February 2021 diff hist -279 715 - Cleaning and Coating Existing Structural Steel →Other Documentation: Updated information for Site Activation/Deactivation
- 15:55, 8 February 2021 diff hist +341 Main Page →Recent Minor Changes
- 15:52, 8 February 2021 diff hist 0 Certified Engineer Process →Current Certified Engineers
- 15:51, 8 February 2021 diff hist +7 Certified Engineer Process →Current Certified Engineers: Updated Certified Engineer List-Feb. 2021
- 15:50, 8 February 2021 diff hist 0 N File:MDOT Engineer certification list - FEB 2021.jpg current
- 15:47, 8 February 2021 diff hist 0 N File:MDOT Engineer certification list - FEB 2021.pdf current
- 14:45, 2 February 2021 diff hist +370 Main Page →Recent Minor Changes: Updated the MDOT Claims Procedure with a revised version as of Feb. 2021
- 14:35, 2 February 2021 diff hist +9 104.10 Claim for Extra Compensation or Extension of Time →General: added revised MDOT Claims Procedure
- 14:18, 2 February 2021 diff hist 0 File:MDOT Construction Contractor Claims Procedure - Rev. 2-2021.pdf SchaeferS uploaded a new version of "File:MDOT Construction Contractor Claims Procedure - Rev. 2-2021.pdf" current
- 14:16, 2 February 2021 diff hist 0 N File:MDOT Construction Contractor Claims Procedure - Rev. 2-2021.pdf
- 16:10, 30 November 2020 diff hist +291 Main Page →Recent Minor Changes: added IDR - moved from Major Change Table
- 16:10, 30 November 2020 diff hist -291 Main Page →Recent Major Changes: moving to minor change table
- 16:03, 30 November 2020 diff hist +291 Main Page →Recent Major Changes: Added IDR revisions
- 15:59, 30 November 2020 diff hist +352 FieldManager →Inspector's Daily Report (IDR): Updated wording in IDR
- 10:37, 5 November 2020 diff hist -10 Main Page →Recent Major Changes
- 10:37, 5 November 2020 diff hist 0 Main Page →Recent Major Changes
- 10:36, 5 November 2020 diff hist +10 Main Page →Recent Major Changes: Fixed typo
- 07:52, 19 October 2020 diff hist +400 Main Page →Recent Major Changes: Updated Construction Field Services Indirect Testing codes
- 07:47, 19 October 2020 diff hist 0 Construction Field Services Indirect Testing Charges Updated construction field services indirect testing codes
- 16:24, 28 September 2020 diff hist +283 Main Page →Recent Major Changes: Updated with Div. 7, section 700 - Closure of Unsafe Structures
- 16:20, 28 September 2020 diff hist +6 MediaWiki:Sidebar
- 16:16, 28 September 2020 diff hist 0 N File:MDOT Memo on Bridge Closure policy final.pdf current
- 16:14, 28 September 2020 diff hist +3,092 N 700 - Closure of Unsafe Structures Created new 700 section under Div 7, approved by Jason Gutting
- 16:12, 28 September 2020 diff hist +29 MediaWiki:Sidebar Fixed new section (700) name
- 16:11, 28 September 2020 diff hist +38 MediaWiki:Sidebar Creating new 700 section under Div. 7, approved by Jason Gutting