- 08:16, 16 October 2023 diff hist +462 Main Page →Recent Major Changes: Updated Indirect Testing Coding for FY24
- 08:12, 16 October 2023 diff hist 0 Construction Field Services Indirect Testing Charges Updated indirect testing codes for FY24 current
- 09:43, 11 September 2023 diff hist +378 Main Page →Recent Major Changes: Added 105's Removal of CFS maintained Buy America Certification Process
- 09:00, 11 September 2023 diff hist -2,623 105.10 Buy America Source of Steel and Iron Removed four paragraphs per Jason Gutting.
- 14:27, 20 June 2023 diff hist +330 Main Page →Recent Minor Changes: Updated to current version of Documentation Guide June 2023
- 10:34, 20 June 2023 diff hist -10 MediaWiki:Sidebar Updated Documentation Guide to June 2023
- 10:30, 20 June 2023 diff hist 0 N File:Documentation Guide June 2023.pdf
- 16:58, 12 June 2023 diff hist +168 102.01 Prequalification of Bidders →Contractor Performance Evaluation (CPE) and Prequalification: relinked the Contractor Evaluation Factors and Rating Criteria URL, it was going to a 404 error page.
- 08:42, 17 May 2023 diff hist +432 Main Page →Recent Major Changes: Updated language to Vertical Exploratory Investigation for Relocation section
- 09:07, 14 April 2023 diff hist +253 Main Page →Recent Major Changes: Added Certified Engineer Process update
- 08:58, 14 April 2023 diff hist -1 Certified Engineer Process →LAP Project Considerations
- 08:57, 14 April 2023 diff hist -775 Certified Engineer Process →Certified Engineer Renewal Process
- 08:56, 14 April 2023 diff hist -57 Certified Engineer Process →Certified Engineer Review Audits
- 08:53, 14 April 2023 diff hist +15 Certified Engineer Process →Certified Engineer Status
- 08:53, 14 April 2023 diff hist +209 Certified Engineer Process →Certified Engineer Application Review Procedures
- 08:50, 14 April 2023 diff hist +403 Certified Engineer Process →Certified Engineer Application Requirements
- 08:48, 14 April 2023 diff hist +6 Certified Engineer Process →Certified Engineer Application Process
- 08:44, 14 April 2023 diff hist -55 Certified Engineer Process →MDOT Certified Engineer Process
- 08:54, 6 April 2023 diff hist +344 Main Page →Recent Minor Changes: Added/clarified pdf stamp approval directive and not the use of OneSpan.
- 08:36, 6 April 2023 diff hist +198 Prevailing Wage →Wage Rate Interviews: added pdf stamp approval directive
- 09:07, 7 March 2023 diff hist +20 Certified Engineer Process →Current Certified Engineers: Uploaded Revised Certification List
- 09:05, 7 March 2023 diff hist 0 N File:Engineer certification list - Feb. 2023 - REVISED.pdf current
- 09:04, 7 March 2023 diff hist 0 N File:Engineer certification list - Feb. 2023 - REVISED.jpg current
- 09:46, 16 February 2023 diff hist +337 Main Page →Recent Minor Changes: Added Feb 2023 Certified Engineer List
- 09:43, 16 February 2023 diff hist +4 Certified Engineer Process →Current Certified Engineers: Updated Certified Engineer list to February 2023
- 09:40, 16 February 2023 diff hist 0 N File:Engineer certification list - Feb. 2023.jpg current
- 09:25, 16 February 2023 diff hist 0 N File:Engineer certification list - Feb. 2023.pdf current
- 17:12, 7 February 2023 diff hist +321 Main Page →Recent Minor Changes: 2/7/23-updated language used.
- 17:05, 7 February 2023 diff hist -46 Project with Consultant Oversight →Consultant Performance Evaluations: Updated wording at Jason G. request. current
- 14:56, 1 December 2022 diff hist -9 104.10 Claim for Extra Compensation or Extension of Time →General: Updated Construction Claims Procedure link to correct website page in Sitecore
- 11:03, 1 December 2022 diff hist +1 Main Page →Recent Minor Changes
- 11:03, 1 December 2022 diff hist +340 Main Page →Recent Minor Changes: Updated Naming Convention Lists as of 11/30/2022
- 11:00, 1 December 2022 diff hist +1 E-Construction →e-Construction/Paper File System: Updated Naming Convention lists as of 11/30/22
- 10:58, 1 December 2022 diff hist 0 N File:Standard Naming Convention Revised 11-30-2022 - NUMERIC - NEW.pdf current
- 10:58, 1 December 2022 diff hist 0 N File:Standard Naming Convention Revised 11-30-2022 - ALPHA NEW.pdf current
- 09:19, 18 October 2022 diff hist -7 Preconstruction Meeting Removed bold from first paragraph
- 09:15, 18 October 2022 diff hist -28,863 Main Page →Recent Minor Changes: Added preconstruction meeting verbiage and removed all entries older than one year.
- 09:13, 18 October 2022 diff hist -1 Preconstruction Meeting
- 09:12, 18 October 2022 diff hist -25 Preconstruction Meeting
- 08:53, 18 October 2022 diff hist +167 Preconstruction Meeting →Preconstruction Meeting Minutes: added preconstruction meeting verbiage.
- 07:13, 17 October 2022 diff hist +392 Main Page →Recent Major Changes: Updated content with FY2023 Program numbers
- 07:07, 17 October 2022 diff hist 0 Construction Field Services Indirect Testing Charges →Inappropriate Use: Updated PE and CON Programs numbers for FY23
- 15:01, 11 October 2022 diff hist +375 Main Page →Recent Major Changes: Updated content for Construction Value Engineering Change Proposal (VECP).
- 14:57, 11 October 2022 diff hist -1,239 Construction Value Engineering Change Proposal (VECP) Updated content current
- 14:26, 11 October 2022 diff hist +50 820 - Traffic Signals →Acceptance of Traffic Signal Work: Updated title on Pay Items list
- 14:25, 11 October 2022 diff hist 0 N File:820 Applicable Traffic Signal Pay Items for Inspection Work Authorizations List.pdf current
- 13:59, 11 October 2022 diff hist -1 820 - Traffic Signals →Acceptance of Traffice Signal Work
- 13:38, 11 October 2022 diff hist 0 820 - Traffic Signals →MEASUREMENT AND PAYMENT
- 13:38, 11 October 2022 diff hist -9 820 - Traffic Signals →MEASUREMENT AND PAYMENT: update sentence for links applicable pay items
- 13:31, 11 October 2022 diff hist 0 Main Page →Recent Major Changes
- 13:29, 11 October 2022 diff hist +309 Main Page →Recent Major Changes: added new Acceptance of Traffic Signal Work content, including pay item list and form
- 13:19, 11 October 2022 diff hist +1,347 820 - Traffic Signals Added Section 4.1 Acceptance of Traffic Signal Work
- 13:18, 11 October 2022 diff hist 0 File:820 Applicable Pay Items List.pdf SchaeferS uploaded a new version of File:820 Applicable Pay Items List.pdf current
- 13:12, 11 October 2022 diff hist 0 N File:CL 09032-01-002 - sample.jpg current
- 13:10, 11 October 2022 diff hist 0 N File:CL 09032-01-002 - blank.pdf current
- 13:08, 11 October 2022 diff hist 0 N File:CL 09032-01-002 - blank.jpg current
- 13:07, 11 October 2022 diff hist 0 N File:CL 09032-01-002 - sample.pdf current
- 13:01, 11 October 2022 diff hist 0 N File:CL 09032-01-002.jpg current
- 12:49, 11 October 2022 diff hist 0 N File:CL 09032-01-002.pdf current
- 09:34, 11 October 2022 diff hist 0 N File:820 Applicable Pay Items List.pdf
- 09:31, 11 October 2022 diff hist 0 N File:Signal items requiring memo CFS.pdf current
- 16:31, 19 September 2022 diff hist +753 Main Page →Recent Major Changes: Added RBPI S&O Plan reference update
- 15:28, 1 September 2022 diff hist 0 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) Updated OBD phone number for Franklin Adams, compliance specialist
- 15:18, 26 July 2022 diff hist -15 Table of Contents by Project Phase Update title of 104.10 current
- 15:14, 26 July 2022 diff hist -15 104.10 Claim for Extra Compensation or Extension of Time →LAP Project Considerations: Updated title of page and LAP link to page 104.10
- 15:09, 26 July 2022 diff hist +70 N 104.10 Contractor Claim for Extra Compensation or Time Extension SchaeferS moved page 104.10 Contractor Claim for Extra Compensation or Time Extension to 104.10 Claim for Extra Compensation or Extension of Time current Tag: New redirect
- 15:09, 26 July 2022 diff hist 0 m 104.10 Claim for Extra Compensation or Extension of Time SchaeferS moved page 104.10 Contractor Claim for Extra Compensation or Time Extension to 104.10 Claim for Extra Compensation or Extension of Time
- 08:59, 26 July 2022 diff hist -30 104.10 Claim for Extra Compensation or Extension of Time →General: Updated Construction Claims Procedure link to website
- 15:02, 21 July 2022 diff hist +363 Main Page →Recent Major Changes: Added 104.10 updated Construction Claims Procedure document July 2022
- 14:58, 21 July 2022 diff hist +183 104.10 Claim for Extra Compensation or Extension of Time →General: Updated Construction Claims Procedure documents, July 2022 version
- 11:16, 21 July 2022 diff hist -10 307 - Aggregate Shoulders and Approaches →MEASUREMENT AND PAYMENT: Clarified spec book as "Standard Specifications for Construction." current
- 16:56, 20 July 2022 diff hist +425 Main Page →Recent Minor Changes: added 307 Aggregate Shoulders and Approaches updating the moisture content change information.
- 16:52, 20 July 2022 diff hist -1 307 - Aggregate Shoulders and Approaches →MEASUREMENT AND PAYMENT
- 16:52, 20 July 2022 diff hist +264 307 - Aggregate Shoulders and Approaches →MEASUREMENT AND PAYMENT: Updated Measurement and Payment information section
- 15:59, 11 July 2022 diff hist +388 Main Page →Recent Minor Changes: Updated link to DRB and pdf to July 2022
- 15:56, 11 July 2022 diff hist -4 Dispute Review Board (DRB) →Dispute Review Board (DRB): Updated new website page link for Sitecore current
- 15:55, 11 July 2022 diff hist +10 Dispute Review Board (DRB) →Dispute Review Board Process Flowchart: Updated flowchart July 2022
- 15:54, 11 July 2022 diff hist 0 N File:DRB Flowchart July 2022.jpg current
- 15:53, 11 July 2022 diff hist 0 N File:DRB Flowchart July 2022.pdf current
- 10:00, 5 July 2022 diff hist +330 Main Page →Recent Minor Changes: Added updated certified engineer list for June 2022
- 09:56, 5 July 2022 diff hist -3 Certified Engineer Process →Current Certified Engineers: Updated to June 2022 Engineer Certification List
- 09:54, 5 July 2022 diff hist 0 N File:Engineer certification list - JUNE 2022.jpg current
- 09:53, 5 July 2022 diff hist 0 N File:Engineer certification list - JUNE 2022.pdf current
- 15:03, 30 June 2022 diff hist +447 Main Page →Recent Minor Changes: Added 102.02 update
- 14:57, 30 June 2022 diff hist +77 102.02 Contents of Proposal - Progress Clause →Progress Clause: Updated several lead times
- 08:34, 21 June 2022 diff hist +358 Main Page →Recent Major Changes: Added temporary special markings price negotiation costs
- 08:23, 21 June 2022 diff hist 0 811 - Permanent Pavement Markings →Temporary Special Markings for Cold Weather: Updated Temporary Special Markings Price Negotiation Costs
- 13:40, 7 June 2022 diff hist +320 Main Page →Recent Minor Changes: Added 208 Turbidity Section
- 11:51, 26 May 2022 diff hist +397 Main Page →Recent Minor Changes: Updated content/added samples to Process for Documenting Certified Materials in FieldManager
- 16:09, 25 May 2022 diff hist +189 Process for Documenting Certified Materials in FieldManager →Process for Documenting Certified Materials in FieldManager: Updated text and added visual sample forms for Concrete, HMA, and Aggregate current
- 16:03, 25 May 2022 diff hist 0 N File:Sample HMA MSL - Form 0501.jpg current
- 16:03, 25 May 2022 diff hist 0 N File:Sample HMA MSL - Form 0501.pdf current
- 16:03, 25 May 2022 diff hist 0 N File:Sample Concrete MSL - Form 0501.jpg current
- 16:03, 25 May 2022 diff hist 0 N File:Sample Concrete MSL - Form 0501.pdf current
- 16:02, 25 May 2022 diff hist 0 N File:Sample Aggregate MSL - Form 0501.jpg current
- 16:02, 25 May 2022 diff hist 0 N File:Sample Aggregate MSL - Form 0501.pdf current
- 15:20, 25 May 2022 diff hist -373 102.02 Contents of Proposal - Progress Clause →Contract Time Determination (CTD): updated website link after Sitecore migration
- 15:57, 18 May 2022 diff hist +695 208 - Soil Erosion and Sedimentation Control (NPDES) Added Turbidity Curtain subsection
- 11:29, 18 May 2022 diff hist +409 Main Page →Recent Major Changes: Added AASHTOWare Project Construction & Materials Software Manual to Major Change Table
- 16:23, 17 May 2022 diff hist +125 MediaWiki:Sidebar Added AASHTOWare wiki link to sidebar
- 11:45, 5 May 2022 diff hist +409 Main Page →Recent Major Changes: Updated section 811
- 09:59, 5 May 2022 diff hist -974 811 - Permanent Pavement Markings Updated Uniform Price Adjustment... section
- 09:51, 5 May 2022 diff hist +9 811 - Permanent Pavement Markings →Uniform Price Adjustment, Regular Dry Paint, and Low Temperature Waterborne Paint
- 09:50, 5 May 2022 diff hist +1,420 811 - Permanent Pavement Markings →Durable Pavement Markings: Updated section
- 11:52, 19 April 2022 diff hist +8 Notice of Non-Compliance with Contract Requirements Added page number for Section 104.01.B
- 10:44, 19 April 2022 diff hist +345 Main Page →Recent Major Changes: Updated Documentation Guide 2022
- 10:33, 19 April 2022 diff hist -1 MediaWiki:Sidebar Updated Documentation Guide 2022
- 10:32, 19 April 2022 diff hist 0 N File:Documentation Guide 2022 Final 04062022.pdf current
- 14:45, 14 April 2022 diff hist +324 Main Page →Recent Minor Changes: Updated Certified Engineer List April 2022
- 14:41, 14 April 2022 diff hist -3 Certified Engineer Process →Current Certified Engineers: Updated Certified Engineer List to April 2022
- 14:40, 14 April 2022 diff hist 0 N File:Engineer certification list - April 2022.jpg current
- 14:40, 14 April 2022 diff hist 0 N File:Engineer certification list - April 2022.pdf current
- 09:01, 14 April 2022 diff hist +361 Main Page →Recent Minor Changes: Updated DRB Flowchart 2022
- 08:54, 14 April 2022 diff hist +58 Dispute Review Board (DRB) →Dispute Review Board Process Flowchart: Updated flowchart to 2022
- 08:49, 14 April 2022 diff hist 0 N File:DRB Flowchart 2022.jpg current
- 08:38, 14 April 2022 diff hist 0 N File:DRB Flowchart 2022.pdf current
- 09:08, 17 March 2022 diff hist +75 109.07 Final Inspection, Acceptance, and Final Payment →Post Final Estimate Process: Changed image to "Change State"
- 09:05, 17 March 2022 diff hist 0 N File:109.07 - 3.5 Post Final Estimate Process image.jpg current
- 07:50, 17 March 2022 diff hist +23 Main Page →Recent Major Changes: Fixed link in Major Change for Holiday Traffic Safety Provisions (by removing 108) and changed "what changed" to "view here."
- 15:17, 15 March 2022 diff hist +362 Main Page →Recent Minor Changes: added 109.07 reorganized section
- 15:11, 15 March 2022 diff hist -9,506 109.07 Final Inspection, Acceptance, and Final Payment Updated and reorganized section to clarifying information
- 12:02, 9 March 2022 diff hist 0 N File:109.07 Form 1120 image.jpg current
- 12:00, 9 March 2022 diff hist 0 N File:109.07 Form 1120 image 03092022.pdf current
- 16:25, 17 February 2022 diff hist +338 Main Page →Recent Minor Changes: Updated alpha/numeric standard naming convention lists as of 2/17/2022
- 16:12, 17 February 2022 diff hist +10 E-Construction →e-Construction/Paper File System: Updated alpha/numeric standard naming convention lists
- 16:09, 17 February 2022 diff hist 0 N File:Standard Naming Convention Revised 02-17-2022 - ALPHA NEW.pdf current
- 16:08, 17 February 2022 diff hist 0 N File:Standard Naming Convention Revised 02-17-2022 - NUMERIC - NEW.pdf current
- 14:29, 16 February 2022 diff hist +153 307 - Aggregate Shoulders and Approaches →MEASUREMENT AND PAYMENT: updated/correct link for 109.01 and 307.03 referencing 2020 spec book
- 14:26, 16 February 2022 diff hist +24 307 - Aggregate Shoulders and Approaches →GENERAL: updated/correct link for 812 referencing 2020 spec book
- 14:24, 16 February 2022 diff hist +22 302 - Aggregate Base Courses →Payment by Weight: updated/correct link for 109.01B2 referencing 2020 spec book current
- 14:21, 16 February 2022 diff hist +23 302 - Aggregate Base Courses →Payment by Weight: updated/correct link for 302.03 referencing 2020 spec book
- 14:18, 16 February 2022 diff hist +21 304 - Rubbilizing Existing PCC Pavement →Equipment: updated/corrected link for 304.03 referencing 2020 spec book current
- 14:16, 16 February 2022 diff hist +39 304 - Rubbilizing Existing PCC Pavement →MATERIALS: updated/correct link for 902.05 referencing 2020 spec book
- 14:14, 16 February 2022 diff hist +36 302 - Aggregate Base Courses →MATERIALS: updated/correct link for 902.05 referencing 2020 spec book
- 14:12, 16 February 2022 diff hist +149 301 - Subbase →MEASUREMENT AND PAYMENT: added reference and link to 205.04 in 2020 spec book current
- 11:35, 3 February 2022 diff hist -4 Main Page →Recent Minor Changes
- 11:33, 3 February 2022 diff hist +339 Main Page →Recent Minor Changes: Updated Certified Engineer List February 3, 2022
- 11:28, 3 February 2022 diff hist +8 Certified Engineer Process →Current Certified Engineers: Updated Certified Engineer list Feb. 3, 2022
- 11:26, 3 February 2022 diff hist 0 N File:Engineer certification list - Feb 3 2022.pdf current
- 11:25, 3 February 2022 diff hist 0 N File:Engineer certification list - Feb 3 2022.jpg current
- 16:07, 24 January 2022 diff hist -162 103.02 Contract Revisions Undo revision 6599 by SchaeferS (talk) Section needs further FHWA review/approval Tag: Undo
- 16:06, 24 January 2022 diff hist -21 103.02 Contract Revisions Undo revision 6600 by SchaeferS (talk) Section needs further FHWA review/approval Tag: Undo
- 16:06, 24 January 2022 diff hist 0 103.02 Contract Revisions Undo revision 6602 by SchaeferS (talk) Needs further FHWA review/approval Tag: Undo
- 16:03, 24 January 2022 diff hist -437 Main Page →Recent Major Changes: Removing 103.02 update, needs further FHWA review and approval
- 13:04, 24 January 2022 diff hist 0 103.02 Contract Revisions →Requirements for FHWA Review on Risk-Based Project Involvement (RBPI): fixed link
- 10:14, 24 January 2022 diff hist +437 Main Page →Recent Major Changes: Updated FHWA Risk-Based Project Involvement Stewardship & Oversight Plan (S&O Plan) reference from PoDI.
- 16:12, 20 January 2022 diff hist +21 m 103.02 Contract Revisions →Requirements for FHWA Review on Risk-Based Project Involvement (RBPI): added bolding
- 16:11, 20 January 2022 diff hist +162 103.02 Contract Revisions →Requirements for FHWA Review on Projects of Division Interest (PoDI): Updated to FHWA Risk-Based Project Involvement (RBPI) Projects and Stewardship & Oversight Plan (S&O Plan)
- 16:01, 19 January 2022 diff hist -138 m 102.17 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) Removed 2012 Spec Book tagline link
- 15:52, 19 January 2022 diff hist -159 m Work Order Removed 2012 Spec Book tagline link current
- 15:52, 19 January 2022 diff hist -161 m Weight Limit Waivers Removed 2012 Spec Book tagline link current
- 15:51, 19 January 2022 diff hist -158 m Structural Fabrication Quality Manual Removed 2012 Spec Book tagline link
- 15:48, 19 January 2022 diff hist -159 m Quality Initiatives and Adjustments Removed 2012 Spec Book tagline link
- 15:47, 19 January 2022 diff hist -170 m Project Delays Due to a Utility Company Removed 2012 Spec Book tagline link
- 15:47, 19 January 2022 diff hist -161 m Processing Sewage/Storm Water Damage Claims Removed 2012 Spec Book tagline link current
- 15:46, 19 January 2022 diff hist -166 m Process for Documenting Certified Materials in FieldManager Removed 2012 Spec Book tagline link
- 15:45, 19 January 2022 diff hist -138 m Preconstruction Meeting Removed 2012 Spec Book tagline link
- 15:39, 19 January 2022 diff hist -161 m Notice of Non-Compliance with Contract Requirements Removed 2012 Spec Book tagline link
- 14:59, 19 January 2022 diff hist -166 m Materials Quality Assurance Procedures Manual Removed 2012 Spec Book tagline link
- 14:56, 19 January 2022 diff hist -170 m Holiday Traffic Safety Provisions Removed 2012 Spec Book tagline link
- 14:54, 19 January 2022 diff hist -159 m Extending Project Limits Removed 2012 Spec Book tagline link current
- 14:47, 19 January 2022 diff hist -161 m Digital Calculations for Payment Removed 2012 Spec Book tagline link
- 14:46, 19 January 2022 diff hist -138 m 102.01 Prequalification of Bidders Removed 2012 Spec Book tagline link
- 14:44, 19 January 2022 diff hist -161 m Contractor's Equipment and Traffic Control Removed 2012 Spec Book tagline link current
- 14:44, 19 January 2022 diff hist -138 m Contract Administration and Oversight Guidelines for Projects Containing Warranty Work Removed 2012 Spec Book tagline link current
- 14:43, 19 January 2022 diff hist -161 m Construction Value Engineering Change Proposal (VECP) Removed 2012 Spec Book tagline link
- 12:47, 19 January 2022 diff hist -163 m 824 - Contractor Staking Removed 2012 Spec Book tagline link current
- 12:47, 19 January 2022 diff hist -156 m 823 - Water Mains Removed 2012 Spec Book tagline link
- 12:47, 19 January 2022 diff hist -163 m 822 - Ground or Cut Centerline and Shoulder Corrugations Removed 2012 Spec Book tagline link current
- 12:46, 19 January 2022 diff hist -174 m 821 - Preservation of Land Monuments and Property Corners Removed 2012 Spec Book tagline link current
- 12:46, 19 January 2022 diff hist -161 m 820 - Traffic Signals Removed 2012 Spec Book tagline link
- 12:46, 19 January 2022 diff hist -170 m 819 - Electrical and Lighting Removed 2012 Spec Book tagline link
- 12:45, 19 January 2022 diff hist -161 m 817 - Landscape Mowing Removed 2012 Spec Book tagline link current
- 12:45, 19 January 2022 diff hist -163 m 816 - Turf Establishment Removed 2012 Spec Book tagline link
- 12:45, 19 January 2022 diff hist -154 m 815 - Landscaping Removed 2012 Spec Book tagline link
- 12:44, 19 January 2022 diff hist -158 m 814 - Paved Ditches Removed 2012 Spec Book tagline link current
- 12:44, 19 January 2022 diff hist -161 m 813 - Slope Protection Removed 2012 Spec Book tagline link
- 12:44, 19 January 2022 diff hist -164 m 812 - Temporary Traffic Control for Construction Zone Operations Removed 2012 Spec Book tagline link
- 12:43, 19 January 2022 diff hist -165 m 811 - Permanent Pavement Markings Removed 2012 Spec Book tagline link
- 12:43, 19 January 2022 diff hist -172 m 810 - Permanent Traffic Signs and Supports Removed 2012 Spec Book tagline link
- 12:42, 19 January 2022 diff hist -157 m 809 - Field Office Removed 2012 Spec Book tagline link current
- 12:42, 19 January 2022 diff hist -150 m 808 - Fencing Removed 2012 Spec Book tagline link current
- 12:42, 19 January 2022 diff hist -168 m 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts Removed 2012 Spec Book tagline link
- 12:41, 19 January 2022 diff hist -164 m 806 - Bicycle Paths Removed 2012 Spec Book tagline link current
- 11:50, 19 January 2022 diff hist -153 m 805 - Hot Mix Asphalt Curb Removed 2012 Spec Book tagline link current
- 11:50, 19 January 2022 diff hist -173 m 804 - Concrete Barriers and Glare Screens Removed 2012 Spec Book tagline link current
- 11:50, 19 January 2022 diff hist -171 m 803 - Concrete Sidewalk, Ramps, and Steps Removed 2012 Spec Book tagline link current
- 11:49, 19 January 2022 diff hist -171 m 802 - Concrete Curb, Gutter, and Dividers Removed 2012 Spec Book tagline link current
- 11:49, 19 January 2022 diff hist -163 m 801 - Concrete Driveways Removed 2012 Spec Book tagline link current
- 11:48, 19 January 2022 diff hist -171 m 719 - Earth Retaining Structures Removed 2012 Spec Book tagline link current
- 11:48, 19 January 2022 diff hist -159 m 718 - Drilled Shafts Removed 2012 Spec Book tagline link
- 11:48, 19 January 2022 diff hist -168 m 717 - Downspouts and Drains Removed 2012 Spec Book tagline link current
- 11:47, 19 January 2022 diff hist -174 m 716 - Shop Cleaning and Coating Structural Steel Removed 2012 Spec Book tagline link current
- 11:47, 19 January 2022 diff hist -175 m 715 - Cleaning and Coating Existing Structural Steel Removed 2012 Spec Book tagline link
- 11:47, 19 January 2022 diff hist -170 m 714 - Temporary Structures and Approaches Removed 2012 Spec Book tagline link current
- 11:46, 19 January 2022 diff hist -165 m 713 - Bridge Rehabilitation, Steel Removed 2012 Spec Book tagline link
- 11:46, 19 January 2022 diff hist -168 m 712 - Bridge Rehabilitation, Concrete Removed 2012 Spec Book tagline link current
- 11:46, 19 January 2022 diff hist -160 m 711 - Bridge Railings Removed 2012 Spec Book tagline link current
- 11:46, 19 January 2022 diff hist -171 m 710 - Waterproofing and Protective Covers Removed 2012 Spec Book tagline link
- 11:45, 19 January 2022 diff hist -162 m 709 - Timber Sturctures Removed 2012 Spec Book tagline link
- 11:45, 19 January 2022 diff hist -167 m 708 - Prestressed Concrete Removed 2012 Spec Book tagline link current
- 11:45, 19 January 2022 diff hist -169 m 707 - Structural Steel Removed 2012 Spec Book tagline link
- 11:44, 19 January 2022 diff hist -168 m 706 - Structural Concrete Removed 2012 Spec Book tagline link
- 11:44, 19 January 2022 diff hist -162 m 705 - Foundation Piling Removed 2012 Spec Book tagline link
- 11:44, 19 January 2022 diff hist -171 m 704 - Steel Sheet Piling and Cofferdams Removed 2012 Spec Book tagline link
- 11:43, 19 January 2022 diff hist -172 m 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes Removed 2012 Spec Book tagline link current
- 11:43, 19 January 2022 diff hist -163 m 702 - Mortar and Grout Removed 2012 Spec Book tagline link current
- 11:43, 19 January 2022 diff hist -165 m 701 - Portland Cement Concrete for Structures Removed 2012 Spec Book tagline link current
- 11:41, 19 January 2022 diff hist -168 m 603 - Concrete Pavement Restoration Removed 2012 Spec Book tagline link
- 11:41, 19 January 2022 diff hist -180 m 602 - Concrete Pavement Construction Removed 2012 Spec Book tagline link
- 10:46, 18 January 2022 diff hist +369 Main Page →Recent Minor Changes: Added 102.02 change for lead times of Delineator and 3# U-Channel Posts
- 10:41, 18 January 2022 diff hist 0 102.02 Contents of Proposal - Progress Clause →Progress Clause: Updated Typical Long-Lead Items for Delineator and 3# U-Channel Posts
- 12:41, 13 January 2022 diff hist -50 501 - Plant Produced Hot Mix Asphalt →Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant: Removed section cat
- 12:39, 13 January 2022 diff hist +25 501 - Plant Produced Hot Mix Asphalt →Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant: Updated cat section
- 17:48, 12 January 2022 diff hist -171 m 406 - Precast Three-Sided, Arch, and Box Culverts Removed 2012 Spec Book tagline link current
- 17:47, 12 January 2022 diff hist -167 m 405 - Pump Station Construction Removed 2012 Spec Book tagline link current
- 17:47, 12 January 2022 diff hist -155 m 404 - Underdrain Removed 2012 Spec Book tagline link current
- 17:47, 12 January 2022 diff hist -165 m 403 - Drainage Structures Removed 2012 Spec Book tagline link current
- 17:47, 12 January 2022 diff hist -158 m 402 - Storm Sewers Removed 2012 Spec Book tagline link current
- 17:46, 12 January 2022 diff hist -159 m 401 - Culverts Removed 2012 Spec Book tagline link
- 17:46, 12 January 2022 diff hist -161 m 209 - Project Cleanup Removed 2012 Spec Book tagline link
- 17:46, 12 January 2022 diff hist -166 m 207 - Obliterating Roadway Removed 2012 Spec Book tagline link
- 17:45, 12 January 2022 diff hist -171 m 206 - Excavation and Backfill for Structures Removed 2012 Spec Book tagline link
- 17:45, 12 January 2022 diff hist -163 m 205 - Roadway Earthwork Removed 2012 Spec Book tagline link
- 17:45, 12 January 2022 diff hist -169 m 204 - Removing Miscellaneous Structures and Materials Removed 2012 Spec Book tagline link
- 17:44, 12 January 2022 diff hist -176 m 203 - Removing Drainage Structures, Culverts, and Sewers Removed 2012 Spec Book tagline link
- 17:44, 12 January 2022 diff hist -169 m 202 - Removing Trees, Stumps, and Corduroy Removed 2012 Spec Book tagline link
- 17:43, 12 January 2022 diff hist -151 m 201 - Clearing Removed 2012 Spec Book tagline link
- 17:42, 12 January 2022 diff hist -155 m 150 - Mobilization Removed 2012 Spec Book tagline link current
- 17:40, 12 January 2022 diff hist -171 m 108.10 Liquidated Damages Removed 2012 Spec Book tagline link
- 17:39, 12 January 2022 diff hist -171 m 108.07 Extension of Time on Work Day Contracts Removed 2012 Spec Book tagline link
- 17:38, 12 January 2022 diff hist -171 m 108.01 Subcontracting of Contract Work Removed 2012 Spec Book tagline link current
- 17:36, 12 January 2022 diff hist -176 m 107.15 Compliance with Laws; Environmental Protection Removed 2012 Spec Book tagline link current
- 17:35, 12 January 2022 diff hist -176 m 107.12 Contractor's Responsibility for Utility Property and Services Removed 2012 Spec Book tagline link
- 17:34, 12 January 2022 diff hist -168 m 106 - Quality Assurance Acceptance Program Removed 2012 Spec Book tagline link current
- 17:33, 12 January 2022 diff hist -179 m 105.10 Buy America Source of Steel and Iron Removed 2012 Spec Book tagline link
- 17:32, 12 January 2022 diff hist -167 m 105.07 Handling and Transporting Materials Removed 2012 Spec Book tagline link current
- 17:31, 12 January 2022 diff hist -167 m 105.01 Quality and Scope of Supply Removed 2012 Spec Book tagline link
- 17:29, 12 January 2022 diff hist -161 m 104.07 Contractor Obligations Removed 2012 Spec Book tagline link
- 17:28, 12 January 2022 diff hist -161 m 104.01 Authority of the Department Removed 2012 Spec Book tagline link current
- 17:28, 12 January 2022 diff hist -159 m 103.02 Contract Revisions Removed 2012 Spec Book tagline link
- 17:23, 12 January 2022 diff hist -168 m 101 - Terms, Format, and Conditions Removed 2012 Spec Book tagline link current
- 16:59, 12 January 2022 diff hist -167 m 308 - Geotextiles for Base Removed 2012 Spec Book tagline link current
- 16:58, 12 January 2022 diff hist -170 m 307 - Aggregate Shoulders and Approaches Removed 2012 Spec Book tagline link
- 16:58, 12 January 2022 diff hist -166 m 306 - Aggregate Surface Course Removed 2012 Spec Book tagline link current
- 16:44, 12 January 2022 diff hist -176 m 305 - HMA Base Crushing and Shaping Removed 2012 Spec Book tagline link current
- 16:43, 12 January 2022 diff hist -168 m 304 - Rubbilizing Existing PCC Pavement Removed 2012 Spec Book tagline link
- 16:43, 12 January 2022 diff hist -147 m 303 - Open Graded Drainage Course Removed 2012 Spec Book tagline current
- 16:07, 12 January 2022 diff hist -168 302 - Aggregate Base Courses Removed 2012 Spec Book tagline
- 12:25, 12 January 2022 diff hist -150 m 301 - Subbase Removed 2012 tagline link