Uploads by Greenes2

Jump to navigation Jump to search

This special page shows all uploaded files.

File list
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size Description Versions
13:24, 1 May 2014 Fig707.1-1.png (file) 223 KB Figure 707.1-1 – Shop Drawing Review Process 1
11:18, 1 May 2014 Fig604-03.png (file) 37 KB Figure 604-3: Quality Assurance Mix Design Review 1
11:11, 1 May 2014 Fig604-02.png (file) 64 KB MDOT Checklist For Concrete Paving With Warranty 1
12:22, 29 April 2014 Table603-01.png (file) 26 KB Table 1: Modulus of Rupture Factors (F) 1
12:17, 29 April 2014 EQ 603-02.png (file) 2 KB Simplified Center Point Flexural Strength Equation 1
12:15, 29 April 2014 FIG603-01.png (file) 10 KB Beam Measurements 1
12:11, 29 April 2014 EQ603-01.png (file) 1 KB Flexural Strength of Concrete (Using Simple Beam With Center Point Loading): 1
08:17, 29 April 2014 %Ret Table Check 4-24-13.xls (file) 132 KB Percent Retained Table Check 04-24-13 1
08:15, 29 April 2014 Concrete JMF Yield Calculator.v3.4-17-13.xls (file) 30 KB Concrete JMF Yield Calculator v3 04-17-13 1
08:21, 9 April 2014 Fig717-01.png (file) 154 KB Drain Casting Assembly Details from Standard Plan Series B101 1
08:20, 9 April 2014 Fig711-07.png (file) 110 KB Bridge Barrier Railing, Aesthetic Parapet Tube 1
08:19, 9 April 2014 Fig711-06.png (file) 28 KB Bridge Barrier Railing, Thrie Beam Retrofit (Open Parapet Type Bridge Railing) 1
08:18, 9 April 2014 Fig711-05.png (file) 17 KB Bridge Barrier Railing, Thrie Beam REtorfit (R4 Type Bridge Railing) 1
08:17, 9 April 2014 Fig711-04.png (file) 41 KB Bridge Barrier Railing, 4 Tube 1
08:16, 9 April 2014 Fig711-03.png (file) 52 KB Bridge Barrier Railing, 2 Tube 1
08:16, 9 April 2014 Fig711-02.png (file) 28 KB Bridge Barrier Railing Type 5 1
08:15, 9 April 2014 Fig711-01.png (file) 30 KB Bridge Barrier Railing Type 4 1
08:14, 9 April 2014 Fig709-05.png (file) 161 KB Table 912-10 Preservation retention requirements. MDOT 2012 Standard Specifications for Construction. 1
08:12, 9 April 2014 Fig709-04.png (file) 23 KB Inspection Stamp for Glulam Lumber 1
08:11, 9 April 2014 Fig709-03.png (file) 518 KB Stress laminated deck system showing typical components. USDA-FPL-GTR-125 1
08:06, 9 April 2014 Fig709-02.png (file) 19 KB Typical Lumber Grading Marks 1
08:06, 9 April 2014 Fig709-01.png (file) 40 KB Timber and Lumber Terminology 1
16:58, 7 April 2014 Letter - Procedures for Review of Contractor Claims.png (file) 76 KB Letter-Procedures for Review of Contractor Claims 1
16:57, 7 April 2014 IM11-07 CPF.png (file) 59 KB Claims Process Flow Chart 1
14:24, 19 March 2014 Flowchart 602-09.png (file) 41 KB Figure 602-9 Pavement Coring for Acceptance Flow Chart 1
14:12, 19 March 2014 Table 602 % increase strength.png (file) 27 KB Table 602 % increase strength.png 1
13:37, 19 March 2014 Fig 602-08.png (file) 33 KB Figure 602-8 Header Board Placement 1
13:36, 19 March 2014 Fig 602-07.png (file) 40 KB Figure 602-7 Transverse Expansion Joints 1
13:36, 19 March 2014 Fig 602-06.png (file) 47 KB Figure 602-6 Basket Pin and Basket Level 1
13:35, 19 March 2014 Fig 602-05.png (file) 39 KB Figure 602-5 Positioning Dowel Basket Assemblies 1
09:56, 19 March 2014 Fig 718-9.png (file) 249 KB Figure 9. Improper concrete placement 1
09:56, 19 March 2014 Fig 718-8.png (file) 298 KB Figure 8. Rebar cage being lowered into complete shaft 1
09:55, 19 March 2014 Fig 718-7.png (file) 150 KB Figure 7. Rebar cage spacers 1
09:55, 19 March 2014 Fig 718-6.png (file) 59 KB Figure 6. Soft rock core barrel 1
09:55, 19 March 2014 Fig 718-5.png (file) 76 KB Figure 5. Muck bucket bottom 1
09:54, 19 March 2014 Fig 718-4.png (file) 124 KB Figure 4. Muck bucket 1
09:54, 19 March 2014 Fig 718-3.png (file) 98 KB Figure 3. Single flight rock auger 1
09:54, 19 March 2014 Fig 718-2.png (file) 270 KB Figure 2. Double flight earth auger 1
09:53, 19 March 2014 Fig 718-1.png (file) 189 KB Figure 1. Typical drill rig set up 1
14:00, 18 March 2014 103 Figure 1.jpg (file) 56 KB Figure 1 – Approval Thresholds for contract revisions 1
12:16, 3 February 2014 Fig 705-6.png (file) 56 KB Figure 6. Typical conical pile pile points 1
12:16, 3 February 2014 Fig 705-5.png (file) 21 KB Figure 5. Typical HP section pile points 1
12:16, 3 February 2014 Fig 705-4.png (file) 77 KB Figure 4. Typical helmet and cushion configuration 1
12:15, 3 February 2014 Fig 705-3.png (file) 30 KB Figure 3. Typical nylon hammer cushions 1
12:15, 3 February 2014 Fig 705-2.png (file) 22 KB Figure 2. Typical pile driving equipment set up 1
12:14, 3 February 2014 Fig 705-1.png (file) 8 KB Figure 1. Typical HP shape 1
16:30, 29 January 2014 Fig 704-8.png (file) 1.21 MB Figure 704-8: Typical cofferdam bracing with walers and struts 1
12:39, 29 January 2014 714 Fig 5.png (file) 902 KB Figure 5. ASTM A6 permitted variations in sectional dimensions 1
12:21, 29 January 2014 714 Fig 7.png (file) 586 KB Figure 7. Proper vibrating techniques in deep forms 1
12:21, 29 January 2014 714 Fig 6.png (file) 1.07 MB Figure 6. ASTM A6 permitted variations in straightness 1
First pagePrevious pageNext pageLast page