Uploads by Greenes2

Jump to navigation Jump to search

This special page shows all uploaded files.

File list
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size Description Versions
08:16, 9 April 2014 Fig711-03.png (file) 52 KB Bridge Barrier Railing, 2 Tube 1
08:17, 9 April 2014 Fig711-04.png (file) 41 KB Bridge Barrier Railing, 4 Tube 1
08:18, 9 April 2014 Fig711-05.png (file) 17 KB Bridge Barrier Railing, Thrie Beam REtorfit (R4 Type Bridge Railing) 1
08:19, 9 April 2014 Fig711-06.png (file) 28 KB Bridge Barrier Railing, Thrie Beam Retrofit (Open Parapet Type Bridge Railing) 1
08:20, 9 April 2014 Fig711-07.png (file) 110 KB Bridge Barrier Railing, Aesthetic Parapet Tube 1
08:01, 9 July 2014 Fig715-02.jpg (file) 33 KB Figure 715-02 Near white blasted steel surface (SSPC-SP10). 1
08:21, 9 April 2014 Fig717-01.png (file) 154 KB Drain Casting Assembly Details from Standard Plan Series B101 1
13:35, 19 March 2014 Fig 602-05.png (file) 39 KB Figure 602-5 Positioning Dowel Basket Assemblies 1
13:36, 19 March 2014 Fig 602-06.png (file) 47 KB Figure 602-6 Basket Pin and Basket Level 1
13:36, 19 March 2014 Fig 602-07.png (file) 40 KB Figure 602-7 Transverse Expansion Joints 1
13:37, 19 March 2014 Fig 602-08.png (file) 33 KB Figure 602-8 Header Board Placement 1
16:30, 29 January 2014 Fig 704-8.png (file) 1.21 MB Figure 704-8: Typical cofferdam bracing with walers and struts 1
12:14, 3 February 2014 Fig 705-1.png (file) 8 KB Figure 1. Typical HP shape 1
12:15, 3 February 2014 Fig 705-2.png (file) 22 KB Figure 2. Typical pile driving equipment set up 1
12:15, 3 February 2014 Fig 705-3.png (file) 30 KB Figure 3. Typical nylon hammer cushions 1
12:16, 3 February 2014 Fig 705-4.png (file) 77 KB Figure 4. Typical helmet and cushion configuration 1
12:16, 3 February 2014 Fig 705-5.png (file) 21 KB Figure 5. Typical HP section pile points 1
12:16, 3 February 2014 Fig 705-6.png (file) 56 KB Figure 6. Typical conical pile pile points 1
12:59, 12 May 2014 Fig 708-11.png (file) 226 KB Figure 708-11 Crack comparator for measuring crack width 1
12:52, 12 May 2014 Fig 708.1-1.png (file) 223 KB Figure 708.1-1 – Shop Drawing Review Process 1
12:58, 12 May 2014 Fig 708.10.png (file) 400 KB Figure 708.10 – Major deficiency – improper consolidation of concrete and expose prestressing strands and steel reinforcement 1
12:53, 12 May 2014 Fig 708.2-1.png (file) 255 KB Figure 708.2-1 – Shop Drawing Review Process 1
12:54, 12 May 2014 Fig 708.2.png (file) 147 KB Figure 708.2 1
12:54, 12 May 2014 Fig 708.3.png (file) 870 KB Figure 708.3 – Structural Precast Concrete Fabrication Inspection Flowchart 1
12:55, 12 May 2014 Fig 708.4.png (file) 325 KB Figure 708.4 – Minor surface defect – air holes greater than 1” in any direction 1
12:55, 12 May 2014 Fig 708.5.png (file) 350 KB Figure 708.5 – Minor surface defect – rubber gasket crease 1
12:56, 12 May 2014 Fig 708.6.png (file) 342 KB Figure 708.6 – Minor surface defect – honeycombing of PCI girder 1
12:57, 12 May 2014 Fig 708.7.png (file) 324 KB Figure 708.7 – Minor damage – broken corner at end of PCI girder 1
12:57, 12 May 2014 Fig 708.8.png (file) 416 KB Figure 708.8 – Minor damage – spalled bottom corner at the end of a box beam 1
12:58, 12 May 2014 Fig 708.9.png (file) 318 KB Figure 708.9 – Major deficiency – spalled bottom corner and exposed prestressing strands at the end of a box beam 1
09:53, 19 March 2014 Fig 718-1.png (file) 189 KB Figure 1. Typical drill rig set up 1
09:54, 19 March 2014 Fig 718-2.png (file) 270 KB Figure 2. Double flight earth auger 1
09:54, 19 March 2014 Fig 718-3.png (file) 98 KB Figure 3. Single flight rock auger 1
09:54, 19 March 2014 Fig 718-4.png (file) 124 KB Figure 4. Muck bucket 1
09:55, 19 March 2014 Fig 718-5.png (file) 76 KB Figure 5. Muck bucket bottom 1
09:55, 19 March 2014 Fig 718-6.png (file) 59 KB Figure 6. Soft rock core barrel 1
09:55, 19 March 2014 Fig 718-7.png (file) 150 KB Figure 7. Rebar cage spacers 1
09:56, 19 March 2014 Fig 718-8.png (file) 298 KB Figure 8. Rebar cage being lowered into complete shaft 1
09:56, 19 March 2014 Fig 718-9.png (file) 249 KB Figure 9. Improper concrete placement 1
11:36, 25 March 2013 Figure 101.04-1.png (file) 87 KB   1
11:36, 25 March 2013 Figure 101.04-1cont.png (file) 62 KB   1
14:24, 19 March 2014 Flowchart 602-09.png (file) 41 KB Figure 602-9 Pavement Coring for Acceptance Flow Chart 1
16:08, 18 December 2013 HMA1.jpg (file) 93 KB Cover Photo 1 for 501 1
16:04, 18 December 2013 HMA1.png (file) 19 KB Cover Photo 1 for 501 1
16:10, 18 December 2013 HMA2.jpg (file) 50 KB Cover Photo 2 for 501 1
08:57, 29 May 2014 I-96 Livonia.png (file) 1.07 MB Concrete Paving I-96 in Livonia 1
16:57, 7 April 2014 IM11-07 CPF.png (file) 59 KB Claims Process Flow Chart 1
12:07, 4 March 2015 ITS Submittals List.pdf (file) 88 KB List of ITS Submittals 1
16:58, 7 April 2014 Letter - Procedures for Review of Contractor Claims.png (file) 76 KB Letter-Procedures for Review of Contractor Claims 1
16:06, 24 November 2015 M231 Ottawa County.jpg (file) 209 KB   1
First pagePrevious pageNext pageLast page