List of redirects
Jump to navigation
Jump to search
Showing below up to 33 results in range #1 to #33.
View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)
- "Force Account" → 109.05 Payment for Contract Revisions
- 102.02 Contents of Proposal → 102.02 Contents of Proposal - Progress Clause
- 102.15 Execution and Award of Contract → 102.14 Execution and Award of Contract
- 104.10 Contractor Claim for Extra Compensation or Time Extension → 104.10 Claim for Extra Compensation or Extension of Time
- 105.10 Source of Steel and Iron → 105.10 Buy America Source of Steel and Iron
- 106 - Qualtiy Assurance Acceptance Program → 106 - Quality Assurance Acceptance Program
- 108.05 Progress of the Work → 108.05 Progress Schedule
- 501 - HMA Mixtures → 501 - Plant Produced Hot Mix Asphalt
- 502 - HMA Construction Practices → 502 - HMA Crack Treatment
- 708 - Precast Concrete Beams (Prestressed) → 708 - Prestressed Concrete
- As-Builts → 109.07 Final Inspection, Acceptance, and Final Payment#Final Marked Plans
- Construction Contract Modification Process Overview → 103.02 Contract Revisions
- Construction Value Engineering Change Proposal (VECP). → Construction Value Engineering Change Proposal (VECP)
- Content Revision Procedures → MDOT Construction Manual Content Revision Procedures
- Contract Mod → 103.02 Contract Revisions
- Contractor Performance Evaluations (CPE) → 102.01 Prequalification of Bidders
- Engineer Certification → Certified Engineer Process
- Final Project Review Procedures → 109.07 Final Inspection, Acceptance, and Final Payment#e-Final Project Review Procedures
- Force Account → 109.05 Payment for Contract Revisions
- HMA Certification → Project with Consultant Oversight
- Interim File Reviews → Interim File Review
- Local Agency → Local Agency Program
- Local Agency Program → Local Agency Program (LAP)
- Manual Section and Page Number → MDOT DENSITY TESTING AND INSPECTION MANUAL
- Naming Convention → E-Construction#Standard Naming Convention for Documents
- Pay Estimates → 109.07 Final Inspection, Acceptance, and Final Payment
- Project Order → Table of Contents by Project Phase
- Records Retention → E-Construction#General Procedures for Construction Records Retention
- Retention Schedule → E-Construction#e-Construction.2FPaper File System
- SWAD → Contract Administration and Oversight Guidelines for Projects Containing Warranty Work#Documentation and Notifications
- Standard Naming Convention for Documents → E-Construction#Standard Naming Convention for Documents
- Timely Payment → 109.07 Final Inspection, Acceptance, and Final Payment#Timely Progress Payments to Contractors
- Template:Doc → Template:Documentation