Deletion log

Jump to navigation Jump to search

Below is a list of the most recent deletions.

Logs
(newest | oldest) View (newer 20 | ) (20 | 50 | 100 | 250 | 500)
  • 09:09, 11 April 2024 Clarkj25 talk contribs deleted page Revision Navigation (content was: " <center><span STYLE="font: 40pt arial;">'''Revision Navigation'''</span></center> ===='''Using View History Tab'''==== {{#ev:youtube|ScB1b3fqjQo|350|center|MDOT's e-Construction Process on I-96}} ===='''Comparing Versions'''==== {{#ev:youtube|ScB1b3fqjQo|350|center|MDOT's e-Construction Process on I-96}} ====#Recen...", and the only contributor was "McGowanR" (talk))
  • 13:19, 12 March 2024 Clarkj25 talk contribs deleted page 601 - PCC Pavement Mixtures (content was: " <center><span STYLE="font: 60pt arial;">'''601'''</span></center> <center><span STYLE="font: 40pt arial;">'''Portland Cement Concrete for Pavements'''</span></center> <span style="color: red"> -This Section has been relocated to 1004 per the 2020 Standard Specifications- </span> Category:Construction Manual Category:Division 6 Category:Section 601")
  • 13:18, 12 March 2024 Clarkj25 talk contribs deleted page Commentary - Special Provision for Quality Control and Acceptance of Portland Cement Concrete 12SP604(B) (content was: "<center><span STYLE="font: 40pt arial;">'''Special Provision for Quality Control'''</span></center> <center><span STYLE="font: 40pt arial;">'''and'''</span></center> <center><span STYLE="font: 40pt arial;">'''Acceptance of Portland Cement Concrete 12SP604(B)'''</span></center> '''Commentary''' Over the past three years, the department has implemented a series of revisions to the title frequently used special provision (FUSP). The primary basis for change to the department...")
  • 13:18, 12 March 2024 Clarkj25 talk contribs deleted page 604 - Contractor Quality Control for Concrete (content was: " <center><span STYLE="font: 60pt arial;">'''604'''</span></center> <center><span STYLE="font: 40pt arial;">'''Contractor Quality Control for Concrete'''</span></center> <span style="color: red"> -This Section has been relocated to 1002 per the 2020 Standard Specifications- </span> Category:Construction Manual Category:Division 6 Category:Section 604")
  • 13:18, 12 March 2024 Clarkj25 talk contribs deleted page 605 - Contractor Quality Assurance for Concrete (content was: " <center><span STYLE="font: 60pt arial;">'''605'''</span></center> <center><span STYLE="font: 40pt arial;">'''Quality Assurance (Acceptance) for Concrete'''</span></center> <center><span STYLE="font:15pt arial;">Please see the page for the Commentary - Special Provision for Quality Control and Acceptance of Portland Cement Concrete 12SP604(B)</span></center> ==GENERAL== Quality assurance for concrete is a statistically based procedure intended for use...")
  • 17:24, 19 September 2023 Clarkj25 talk contribs deleted page Joe test page 5 (content was: "This is a test page setup by joe to see if something works", and the only contributor was "JoeSeckelmanDev" (talk))
  • 17:19, 19 September 2023 Clarkj25 talk contribs deleted page 701-Portland Cement Concrete for Structures (content was: " <center><span STYLE="font: 60pt arial;">'''701'''</span></center> <center><span STYLE="font: 40pt arial;">'''Portland Cement Concrete for Structures'''</span></center> ==GENERAL== Unless otherwise specified, air entrained concrete will be required for structural work. Defoaming (air-detraining) admixtures will not be permitted. All concrete will be air-entrained. Sack refers to a 94 pound (42.64 kg) sack of cement. Refer to 601 - PCC Pavement Mixtures|D...")
  • 17:00, 19 September 2023 Clarkj25 talk contribs deleted page Test page joe 1 (content was: "testing here more stuff here one more thing", and the only contributor was "JoeSeckelmanDev" (talk))
  • 16:58, 19 September 2023 Clarkj25 talk contribs deleted page 2013 Updates (content before blanking was: "==Design Update 2013-1== 2/12/13 ===MDOT Road Sample Plans=== The updated MDOT Road Sample Plans are now available on the web for Consultants (http://www.michigan.gov/mdot/0,4616,7-151-9625_21540_36037-171026--,00.html) and in ProjectWise for MDOT personnel ([http://pw:\\HCS591MDOTPA008.som.ad.state.mi.us:MDOTProjectWise\Documents\Reference%20Documents\Sample%20Plans\ Sample Plans]). This current set (MDOT_Sample_Plans_Road_2013-02-04.pdf) replaces any previou...")
  • 16:58, 19 September 2023 Clarkj25 talk contribs deleted page 2012 Updates (content before blanking was: "==Design Update 2012-1 (revised)== 6/27/12 ===Special Provision Processing=== Here are some reminders regarding submitting special provisions: Per the [http://mdotwas1.mdot.state.mi.us/public/design/englishroadmanual/ Road Design Manual ]Chapter 11, if special provisions are not submitted in the proper format they will be returned to the submitter before the approval process begins. Please see the [http://michigan.gov/documents/mdot/MDOT_SP_Formatting_Tips_...")
  • 16:58, 19 September 2023 Clarkj25 talk contribs deleted page 2011 Updates (content before blanking was: "==Design Update 2011-1 (revised)== 2/16/11 ===HMA Quality Initiative=== The quantity for HMA Quality Initiative should be two times the entire quantity of HMA set up on a project. The unit price should be fixed at $1.00. This change will take effect immediately. {{top}} Category:Design Updates")
  • 16:56, 19 September 2023 Clarkj25 talk contribs deleted page 2010 Updates (content before blanking was: "==Design Update 2010-1== 3/05/10 ===Previously Approved SP=== In ProjectWise under Reference Documents/SP Originals there are more previously approved specs from C&T of a more modern vintage that can be retrieved. ===Guidance on Use of HMA Initiative=== This rescinds the information in Design Update 2006-3 item #1. '''FREEWAY AND NON-FREEWAY PROJECTS: (warranted and non-warranted) ''' Superpave – HMA INITIATIVE quantity is the total of...")
  • 16:56, 19 September 2023 Clarkj25 talk contribs deleted page 102.19 (content before blanking was: "<center><span STYLE="font: 30pt arial;">'''102.19'''</span></center> <center><span STYLE="font: 20pt arial;">102.19 Evaluation of Contractor Performance and Contract Non-Compliance</span></center> <center>[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php?title=102.01_Prequalification_of_Bidders Email this Page]</center> __forcetoc__ ==#Contractor Performance Evaluation (CPE) and Prequalification | Contractor Performance Evaluation (CPE)...")
  • 11:03, 13 September 2023 Clarkj25 talk contribs deleted page File:Fig501-1a1.jpg (Deleted old revision 20130528152028!Fig501-1a1.jpg)
  • 11:02, 13 September 2023 Clarkj25 talk contribs deleted page File:Fig501-1a1.jpg (Deleted old revision 20230913145751!Fig501-1a1.jpg)
  • 15:58, 8 August 2023 Clarkj25 talk contribs deleted page 818 - Dune Grass Planting (content before blanking was: " <center><span STYLE="font: 60pt arial;">'''818'''</span></center> <center><span STYLE="font: 40pt arial;">'''Dune Grass Planting'''</span></center> ==GENERAL== <span style="color: red"> -Reserved- </span> {{top}} ==MATERIALS== <span style="color: red"> -Reserved- </span> {{top}} ==CONSTRUCTION== <span style="color: red"> -Reserved- </span> {{top}} ==MEASUREMENT AND PAYMENT==...")
  • 08:20, 24 May 2023 Clarkj25 talk contribs deleted page File:107.01 - Jobsite Post Fig. 3.png
  • 08:19, 24 May 2023 Clarkj25 talk contribs deleted page File:107.01 - Jobsite Post Fig. 3.png (Deleted old revision 20230524121217!107.01_-_Jobsite_Post_Fig._3.png)
  • 08:15, 24 May 2023 Clarkj25 talk contribs deleted page File:107.01 - Jobsite Post Fig. 3.png (Deleted old revision 20230524121452!107.01_-_Jobsite_Post_Fig._3.png)
  • 08:57, 18 April 2023 Clarkj25 talk contribs deleted page File:Figure 101.04-1cont E-Signed.png (Deleted old revision 20230418125208!Figure_101.04-1cont_E-Signed.png)
(newest | oldest) View (newer 20 | ) (20 | 50 | 100 | 250 | 500)