Deletion log
Jump to navigation
Jump to search
Below is a list of the most recent deletions.
(newest | oldest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)- 17:03, 28 February 2019 McGowanR talk contribs deleted page Division 3 Pay Items (New Documentation Guide now available)
- 16:57, 28 February 2019 McGowanR talk contribs deleted page 2080025 Erosion Control, Silt Fence (New Documentation Guide now available)
- 16:57, 28 February 2019 McGowanR talk contribs deleted page 2060003 Backfill, Structure, LM (New Documentation Guide now available)
- 16:57, 28 February 2019 McGowanR talk contribs deleted page 2060002 Backfill, Structure, CIP (New Documentation Guide now available)
- 16:57, 28 February 2019 McGowanR talk contribs deleted page 2050042 Subgrade Undercutting, Type III (New Documentation Guide now available)
- 16:56, 28 February 2019 McGowanR talk contribs deleted page 2050041 Subgrade Undercutting, Type II (New Documentation Guide now available)
- 16:56, 28 February 2019 McGowanR talk contribs deleted page 2050040 Subgrade Undercutting, Type I (New Documentation Guide now available)
- 16:56, 28 February 2019 McGowanR talk contribs deleted page 2050016 Excavation, Earth (New Documentation Guide now available)
- 16:56, 28 February 2019 McGowanR talk contribs deleted page Division 2 Pay Items (New Documentation Guide now available)
- 16:55, 28 February 2019 McGowanR talk contribs deleted page 2050012 Embankment, Structure, CIP (New Documentation Guide now available)
- 16:55, 28 February 2019 McGowanR talk contribs deleted page 2050010 Embankment, CIP (New Documentation Guide now available)
- 16:55, 28 February 2019 McGowanR talk contribs deleted page 2050011 Embankment, LM (New Documentation Guide now available)
- 16:55, 28 February 2019 McGowanR talk contribs deleted page 2050001 Backfill, Swamp (New Documentation Guide now available)
- 16:53, 28 February 2019 McGowanR talk contribs deleted page Category:Division 2 Pay Items (New Documentation Guide now available)
- 16:51, 28 February 2019 McGowanR talk contribs deleted page DG - General (New Documentation Guide now available)
- 09:23, 10 January 2019 McGowanR talk contribs deleted page File:TRUNKLINE Boilerplate Preconstruction Meeting Minutes.docx (Deleted old revision 20190110132330!TRUNKLINE_Boilerplate_Preconstruction_Meeting_Minutes.docx: Duplicated file)
- 15:14, 20 November 2018 McGowanR talk contribs deleted page File:Inspector1.png (Testing>Not Needed)
- 11:08, 18 June 2018 McGowanR talk contribs deleted page Construction Technology Resources (Renamed page to "Construction Technology Support Resources")
- 09:25, 14 June 2018 McGowanR talk contribs restored page 101.04 - Inspector's Daily Reports (12 revisions restored: Inquiry for contents and intent)
- 10:18, 8 May 2018 McGowanR talk contribs deleted page Test Page (This was just Test Page to facilitate the update to the new look and feel of the Main Page)
- 10:31, 11 April 2018 McGowanR talk contribs deleted page 102.14 Construction Progress Schedule (No additional guidance relative to this section. Relative content is contained in page for 108.05. Removing redundancy based on Content Managers request (BD))
- 08:32, 31 January 2018 JohnsonN23 talk contribs deleted page Notice of Non-Complience with Contract Requirements (content was: "#REDIRECT Notice of Non-Compliance with Contract Requirements" (and the only contributor was "JohnsonN23"))
- 09:52, 10 January 2018 JohnsonN23 talk contribs deleted page Other (information was seperated out)
- 14:25, 13 December 2017 JohnsonN23 talk contribs deleted page File:Depositing Post-Construction Meeting Minutes in ProjectWise.pdf (duplicatte)
- 11:16, 13 December 2017 JohnsonN23 talk contribs deleted page DESIGN/CONSTRUCTION PACKAGE EVALUATION, FORM 285-2 (content was: "<center>[http://mdotcf.state.mi.us/public/specbook/files/2012/102%20Bid%20Sub,%20Award,%20Exec%20Contr.pdf Spec Book Section 102]</center> <center>[mailto:C..." (and the only contributor was "JohnsonN23"))
- 10:51, 7 December 2017 JohnsonN23 talk contribs deleted page File:Draft Boilerplate Progress Clause September 9 2015.docx
- 10:50, 7 December 2017 JohnsonN23 talk contribs deleted page File:Draft Boilerplate Progress Clause October 8 2015.docx
- 15:54, 4 December 2017 JohnsonN23 talk contribs deleted page Dispute Review Board (DRB) Procedures (content was: "#REDIRECT Dispute Review Board (DRB)" (and the only contributor was "JohnsonN23"))
- 15:47, 4 December 2017 JohnsonN23 talk contribs deleted page File:DRB Flowchart November 2017.pdf (Deleted old revision 20171204194446!DRB_Flowchart_November_2017.pdf)
- 10:01, 2 November 2017 JohnsonN23 talk contribs deleted page File:Table with Example File Naming 10.31.17.xlsx (must be a PDF)
- 10:12, 26 October 2017 JohnsonN23 talk contribs deleted page 103.02 Contract Revisions (Deleted to make way for move from "Construction Contract Modification Process Overview")
- 09:33, 23 October 2017 JohnsonN23 talk contribs deleted page 107.21 Open to Traffic (content was: "#REDIRECT 107.21 Open for Traffic" (and the only contributor was "JohnsonN23"))
- 09:32, 23 October 2017 JohnsonN23 talk contribs deleted page 107.21 Approved for Traffic (content was: "#REDIRECT 107.21 Open to Traffic" (and the only contributor was "JohnsonN23"))
- 09:30, 23 October 2017 JohnsonN23 talk contribs deleted page 107.21 Open for Traffic (content was: "<span style=color:red>There is no further content, see Spec Book.</span> Category:Construction Manual category:Division 1 category:Section 107" (and the only contributor was "JohnsonN23"))
- 11:43, 20 June 2017 JohnsonN23 talk contribs deleted page Construction and Technology Indirect Testing Credit (content was replaced by "Construction Field Services Indirect Testing Charges")
- 13:25, 23 May 2017 JohnsonN23 talk contribs deleted page Digital Electronic Signatures (content was: "<center>[http://mdotcf.state.mi.us/public/specbook/files/2012/103%20Scope%20of%20Work.pdf 2012 STANDARD SPECIFICATIONS FOR CONSTRUCTION - SECTION 103]</cent..." (and the only contributor was "JohnsonN23"))
- 11:27, 16 May 2017 JohnsonN23 talk contribs deleted page Table of Contents Section 102 (content was: "<categorytree mode=pages>Section 102</categorytree>" (and the only contributor was "JohnsonN23"))
- 11:27, 16 May 2017 JohnsonN23 talk contribs deleted page Table of Contents Section 103 (content was: "<categorytree mode=pages>Section 103</categorytree>" (and the only contributor was "JohnsonN23"))
- 11:26, 16 May 2017 JohnsonN23 talk contribs deleted page Table of Contents Section 104 (content was: "<categorytree mode=pages>Section 104</categorytree>" (and the only contributor was "JohnsonN23"))
- 11:26, 16 May 2017 JohnsonN23 talk contribs deleted page Table of Contents Section 105 (content was: "<categorytree mode=pages>Section 105</categorytree> Category:Construction Manual Category:Division 1 Category:Section 105" (and the only contributor was "JohnsonN23"))
- 11:26, 16 May 2017 JohnsonN23 talk contribs deleted page Table of Contents Section 107 (content was: "<categorytree mode=pages>Section 107</categorytree>" (and the only contributor was "JohnsonN23"))
- 11:25, 16 May 2017 JohnsonN23 talk contribs deleted page Table of Contents Section 108 (content was: "<categorytree mode=pages>Section 108</categorytree>" (and the only contributor was "JohnsonN23"))
- 11:25, 16 May 2017 JohnsonN23 talk contribs deleted page Table of Contents Section 109 (content was: "<categorytree mode=pages>Section 109</categorytree>" (and the only contributor was "McGowanR"))
- 11:25, 16 May 2017 JohnsonN23 talk contribs deleted page 109 - Measurement and Payment (content was: " <center><span STYLE="font: 60pt arial;">'''109'''</span></center> <center><span STYLE="font: 40pt arial;">'''Measurement and Payment'''</span></center> <center>[http://mdotcf.state.mi.us/public/specbook/files/2012/109%20Measurement%20...")
- 11:24, 16 May 2017 JohnsonN23 talk contribs deleted page 108 - Prosecution and Progress (content was: " <center><span STYLE="font: 60pt arial;">'''108'''</span></center> <center><span STYLE="font: 40pt arial;">'''Prosecution and Progress'''</span></center> <center>[http://mdotcf.state.mi.us/public/specbook/files/2012/108%20Prosecution%2...")
- 11:24, 16 May 2017 JohnsonN23 talk contribs deleted page 107 - Legal Relations and Responsibility to the Public (content was: " <center><span STYLE="font: 60pt arial;">'''107'''</span></center> <center><span STYLE="font: 40pt arial;">'''Legal Relations and Responsibilities to the Public'''</span></center> <center>[http://mdotcf.state.mi.us/public/specbook/file...")
- 11:24, 16 May 2017 JohnsonN23 talk contribs deleted page 105 - Control of Materials (content was: "<center><span STYLE="font: 60pt arial;">'''105'''</span></center> <center><span STYLE="font: 40pt arial;">'''Control of Materials'''</span></center> <center>[http://mdotcf.state.mi.us/public/specbook/files/2012/105%20Control%20of%20Mat...")
- 11:23, 16 May 2017 JohnsonN23 talk contribs deleted page 104 - Control of Work (content was: " <center><span STYLE="font: 60pt arial;">'''104'''</span></center> <center><span STYLE="font: 40pt arial;">'''Control of Work'''</span></center> <center>[http..." (and the only contributor was "Greenes2"))
- 11:23, 16 May 2017 JohnsonN23 talk contribs deleted page 103 - Scope of Work (content was: " <center><span STYLE="font: 60pt arial;">'''103'''</span></center> <center><span STYLE="font: 40pt arial;">'''Scope of Work'''</span></center> <center>[http://mdotcf.state.mi.us/public/specbook/files/2012/103%20Scope%20of%20Work.pdf 20...")
- 11:21, 16 May 2017 JohnsonN23 talk contribs deleted page 102 - Bid Submission, Award, and Execution of Contract (content was: " <center><span STYLE="font: 60pt arial;">'''102'''</span></center> <center><span STYLE="font: 40pt arial;">'''Bid Submission, Award, And Execution of Contract'''</span></center> <center>[http://mdotcf.state.mi.us/public/specbook/files/...")
- 11:18, 3 May 2017 JohnsonN23 talk contribs deleted page 108.01 Subcontrcting of Contract Work (content was: "#REDIRECT 108.01 Subcontracting of Contract Work" (and the only contributor was "JohnsonN23"))
- 14:57, 18 April 2017 McGowanR talk contribs deleted page 102.05 Prepatartion of Bid Items in the Proposal (content was: "#REDIRECT 102.05 Preparation of Bid Items in the Proposal" (and the only contributor was "McGowanR"))
- 14:50, 18 April 2017 McGowanR talk contribs deleted page Template:Clickable button (content before blanking was: "{{clickable button|Text|color=blue}}")
- 13:30, 17 April 2017 JohnsonN23 talk contribs deleted page Extension of Time on Workday Contracts (duplicate page)
- 13:30, 17 April 2017 JohnsonN23 talk contribs deleted page Liquidated Damages (duplicate pages)
- 13:29, 17 April 2017 JohnsonN23 talk contribs deleted page Subcontracting of Contract Work (duplicate)
- 09:18, 17 April 2017 JohnsonN23 talk contribs deleted page Compliance with Laws; Environmental Protection (duplicate)
- 09:17, 17 April 2017 JohnsonN23 talk contribs deleted page Hauling on Local Roads (duplicate)
- 09:16, 17 April 2017 JohnsonN23 talk contribs deleted page Contractor's Responsibility for Utility Property and Services (duplicate)
- 09:16, 17 April 2017 JohnsonN23 talk contribs deleted page Archeological and Historical Findings (duplicate)
- 10:13, 14 April 2017 JohnsonN23 talk contribs deleted page Handling and Transporting Materials (duplicate info)
- 10:13, 14 April 2017 JohnsonN23 talk contribs deleted page Quality and Scope of Supply (duplicate info)
- 10:12, 14 April 2017 JohnsonN23 talk contribs deleted page Sources of Steel and Iron (duplicate info)
- 11:27, 12 April 2017 JohnsonN23 talk contribs deleted page Contractor Obligations (duplicate info)
- 11:26, 12 April 2017 JohnsonN23 talk contribs deleted page Contractor Claim for Extra Compensation (Duplicate data)
- 11:26, 12 April 2017 JohnsonN23 talk contribs deleted page Authority of the Department (duplicate work)
- 07:42, 12 April 2017 JohnsonN23 talk contribs deleted page Contract Revisions (duplicate content)
- 15:59, 11 April 2017 McGowanR talk contribs deleted page Category:103 Scope of Work (Created for testing. Deleting duplicate page)
- 14:57, 11 April 2017 JohnsonN23 talk contribs deleted page Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) (content was: "<center><span STYLE="font: 30pt arial;">'''102.18'''</span></center> <center><span STYLE="font: 20pt arial;">102 Bid Submission, Award, and Execution of Con..." (and the only contributor was "JohnsonN23"))
- 14:56, 11 April 2017 JohnsonN23 talk contribs deleted page Prequalification of Bidders (duplicate page)
- 14:56, 11 April 2017 JohnsonN23 talk contribs deleted page Contents of Proposal (Duplicate page)
- 09:57, 11 April 2017 JohnsonN23 talk contribs deleted page 102.03 Contents of Proposal (content was: "#REDIRECT 102.02 Contents of Proposal" (and the only contributor was "JohnsonN23"))
- 09:51, 11 April 2017 JohnsonN23 talk contribs deleted page Weight Limit Wavers (Author request: spelling error in title)
- 11:25, 21 March 2017 McGowanR talk contribs deleted page Construction Value Engineering Change Proposal (VECP) (Restructuring of Wiki (Page Title Change))
- 11:24, 21 March 2017 McGowanR talk contribs deleted page Constriction Contract Modification Process Overview (Restructuring of Wiki (Page Title Change))
- 15:19, 14 December 2016 McGowanR talk contribs deleted page File:DI-05649-050.jpg (Deleted old revision 20161214191831!DI-05649-050.jpg: Duplicated file)
- 16:22, 23 June 2016 McGowanR talk contribs deleted page File:DRB Flowchart FINAL (November 2015).pdf (Deleted old revision 20160623202041!DRB_Flowchart_FINAL_(November_2015).pdf: Duplicated file)
- 12:12, 29 February 2016 McGowanR talk contribs deleted page File:Jobsite Poster Examples 2015-11-16 Page1.pdf
- 12:11, 29 February 2016 McGowanR talk contribs deleted page File:Jobsite Poster Examples 2015-11-16 Page2.pdf
- 01:26, 9 December 2015 McGowanR talk contribs deleted page File:Jobsite Poster Examples 2015-11-16.pdf
- 09:55, 24 November 2015 Greenes2 talk contribs deleted page File:Auburn Hills DDI.jpg
- 09:55, 24 November 2015 Greenes2 talk contribs deleted page File:M100 Bridge Slide-1.jpg
- 09:47, 24 November 2015 Greenes2 talk contribs deleted page File:M100 Bridge Slide.jpg
- 13:54, 16 November 2015 Greenes2 talk contribs deleted page File:Auburn Hills DDI.jpg
- 13:54, 16 November 2015 Greenes2 talk contribs deleted page File:M100 Bridge Slide.jpg
- 13:53, 16 November 2015 Greenes2 talk contribs deleted page File:M231 Ottawa County.jpg
- 09:14, 21 October 2015 Greenes2 talk contribs deleted page Prevailing Wage Oversight Procedures (Author request: copied page to appropriate Div 1 sec 107)
- 13:26, 12 October 2015 Greenes2 talk contribs deleted page File:Draft Boilerplate Progress Clause Final Copy.docx (old version)
- 14:07, 29 June 2015 Greenes2 talk contribs deleted page File:Draft Boilerplate Progress Clause Final Copy.docx (Deleted old revision 20150629180625!Draft_Boilerplate_Progress_Clause_Final_Copy.docx: Duplicated file)
- 10:35, 5 March 2015 Greenes2 talk contribs deleted page Traffic Control During Special Marking Construction (Orphan page. All content duplicated in section 812)
- 16:55, 18 November 2014 Greenes2 talk contribs deleted page Certified Payrolls (Out dated content)
- 15:20, 18 September 2014 Greenes2 talk contribs deleted page Holiday Traffic Safety Provisions (Author request: Wiki CM Cleanup)
- 15:09, 18 September 2014 Greenes2 talk contribs deleted page Early CM Format (Author request: Wiki CM Cleanup)
- 14:59, 18 September 2014 HarrisR18 talk contribs deleted page 705 - Foundation Piling NEW (wiki cleanup of unused pages)
- 14:44, 18 September 2014 HarrisR18 talk contribs deleted page 504 - Furnishing and Placing HMA Mixtures (Quality Assurance) (wiki cleanup of unused pages)
- 14:10, 18 September 2014 Greenes2 talk contribs deleted page Durable Pavement Markings (Author request: wiki cleanup of unused pages)
- 14:06, 18 September 2014 Greenes2 talk contribs deleted page 503 - Contractor Quality Control for HMA (Author request: Wiki Clean up of unused pages)
- 14:01, 18 September 2014 Greenes2 talk contribs deleted page Category:Division 2 (Author request)
- 14:41, 16 September 2014 Greenes2 talk contribs deleted page DGTest (Author request)
- 14:36, 16 September 2014 Greenes2 talk contribs deleted page ICMANUAL DRAFT (Author request)
- 14:35, 16 September 2014 Greenes2 talk contribs deleted page Innovative Contracting Manual (Author request)
- 15:25, 5 September 2014 Greenes2 talk contribs deleted page Division 1 Supplemental Information (Author request: Old/conflicting information)
- 13:27, 4 September 2014 Greenes2 talk contribs deleted page 701 - Portland Cement Concrete (Rename of page to follow 2012 SSFC)
- 08:04, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Duplicated file)
- 07:59, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Deleted old revision 20140709115647!Fig715-02.png: Duplicated file)
- 07:58, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Deleted old revision 20140709115618!Fig715-02.png: Duplicated file)
- 07:58, 9 July 2014 Greenes2 talk contribs deleted page File:Fig715-02.png (Deleted old revision 20140709115429!Fig715-02.png: Duplicated file)
- 11:22, 2 July 2014 Greenes2 talk contribs deleted page File:Work continues on the new M-85 (Fort Street) bridge over the Rouge River in Detroit. This project's expected to be finished in late November.jpg (Duplicated file: This one is messed up!)
- 09:49, 2 July 2014 Greenes2 talk contribs deleted page File:ExCMpg1.png (too wide)
- 09:58, 29 May 2014 HarrisR18 talk contribs deleted page File:Table712.2.png (Deleted old revision 20140529134741!Table712.2.png)
- 09:55, 29 May 2014 HarrisR18 talk contribs deleted page File:Table712.3.png (Deleted old revision 20140529134919!Table712.3.png)
- 16:04, 21 May 2014 Greenes2 talk contribs deleted page 110 - Programs Not Covered by Standard Specifications (Author request: content was: "110 - Programs not Covered by Standard Specification * 110.01 - Engineer Certification Program * 110.02 - Railroad Highway Projects * 110.03 - Delay of Project Due to Utility Conflict * [[110.04 - Final Financ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 204.04 - Demolition Contracts (Author request: content was: "===Demolition Contracts=== There is no reference to this work in the Standard Specifications for Construction. Requirements for demolition work are usually detailed in contracts prepared by the Real Estate Support Area. ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 502.03 - Surface Preperation (Author request: content was: "502 - HMA Construction Practices ==502.03 - SURFACE PREPARATION== ===502.03.1 Aggregate Base=== The ride quality of the surface depends, to a great degree, upon the conditioning and preparation of the aggregate ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 102.03 - Progress Clause (Author request: content was: "102 - PreConstruction Administration '''102.03 - PROGRESS CLAUSE''' The Engineer is responsible for providing the Progress Clause at the OEC meeting. The Progress Clause is an important part of the bidding proposal ...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.04 - Final Financial Process (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.06 - FINAL FINANCIAL PROCESS''' After concurrence with the audit report is obtained, and if nec..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.03 - Delay of Project Due to Utility Conflict (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.03 - DELAY OF PROJECT DUE TO A UTILITY CONFLICT''' '''110.03.1 General Information''' When ..." (and the only contributor was "[[Special:Contributions/...)
- 16:03, 21 May 2014 Greenes2 talk contribs deleted page 110.02 - Railroad Highway Projects (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.02 - RAILROAD HIGHWAY PROJECTS''' Safety deficiencies, evaluation of crossing/separation condit..." (and the only contributor was "[[Special:Contributions/...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 110.01 - Engineer Certification Program (Author request: content was: "110 - Programs Not Covered by Standard Specifications '''110.01 - ENGINEER CERTIFICATION PROGRAM''' In order to be eligible for certification, the following criteria must be met: * Recommendation for certification b...)
- 16:02, 21 May 2014 Greenes2 talk contribs deleted page 109.09 - Final Estimate Review (Author request: content was: "109 - Measurement and Payment '''109.09 - FINAL ESTIMATE REVIEW''' When the Engineer has determined the final quantities of all pay items, the Region office should be advised that the project is ready for a final est...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.08 - Documents Necessary for Final Payment (Author request: content was: "109 - Measurement and Payment '''109.08 - DOCUMENTS NECESSARY FOR FINAL PAYMENT''' After review by the Region, forms and documents necessary for payment of the final estimate should be submitted as shown below. {| c...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.07 - Final Marked Plans (Author request: content was: "109 - Measurement and Payment '''109.07 - FINAL MARKED PLANS''' Marked plans showing "as constructed" changes should be submitted to the Lansing Design Support Area upon completion of a project. This information is ...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.06 - Final Estimates (Copyright violation: content was: "109 - Measurement and Payment '''109.06 - FINAL ESTIMATES''' The following procedure for processing final estimates will expedite the finalizing of projects and final payment to the Contractor for completed work...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.05 - Overruns (Author request: content was: "109 - Measurement and Payment '''109.05 - OVERRUNS''' '''109.05.1 Overrun Letters''' Overrun letters are usually prepared in Lansing by the Contract Administration Engineer. Overrun letters follow the same proce...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.04 - Reduction in Reserve (Author request: content was: "109 - Measurement and Payment '''109.04 - REDUCTION IN RESERVE''' The computer is programmed to reduce the reserve to 2 percent automatically upon payment of 90 percent of the contract amount. At that time, the cont...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.03 - Acceptance of Work (Author request: content was: "109 - Measurement and Payment '''109.03 - ACCEPTANCE OF WORK''' When the project is substantially completed, a post construction inspection of the project should be performed by the Engineer and senior technician. T...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.02 - Force Account Checklist (Author request: content was: "109 - Measurement and Payment '''109.02 - FORCE ACCOUNT CHECKLIST''' This checklist provides an overview of the documentation required for force account work. More detailed descriptions are provided on the following...)
- 15:59, 21 May 2014 Greenes2 talk contribs deleted page 109.01 - Force Account Work (Author request: content was: "109 - Measurement and Payment '''109.01 - FORCE ACCOUNT WORK''' Force account basis for payment should be used in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/109%20Measurement%20&...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.04 - Guidelines for Assessing Liquidated Damages (Author request: content was: "108 - Prosecution and Progress '''108.04 - GUIDELINES FOR ASSESSING LIQUIDATED DAMAGES''' The Contract Modifications, Form 1100, which follow or accompany the request for extension of contract time, should merely rev...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.03 - Extension of Time and Liquidated Damages (Author request: content was: "108 - Prosecution and Progress '''108.03 - EXTENSION OF TIME AND LIQUIDATED DAMAGES''' Conditions for granting additional time are discussed in subsections [http://mdotcf.state.mi.us/public/specbook/files/2012/108%20...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.02 - Biweekly Construction Progress Report (Author request: content was: "108 - Prosecution and Progress '''108.02 - BIWEEKLY CONSTRUCTION PROGRESS REPORT''' The ''Biweekly Construction Progress Report, Form 1102A'', is used to record progress of the work on a project. Its purpose is to a...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 108.01 - Payment for Delivered Materials (Author request: content was: "108 - Prosecution and Progress '''108.01 - PAYMENT FOR DELIVERED MATERIALS''' Materials specifically produced or purchased for the project and stockpiled for use on the project may be paid for on the biweekly/weekly ...)
- 15:54, 21 May 2014 Greenes2 talk contribs deleted page 105.04 - Statement of Material & Labor Used (Author request: content was: "105 - Control of Materials '''105.04 - STATEMENT OF MATERIALS AND LABOR USED''' The Statement of Materials and Labor Used, FHWA-47 report, is used to document total quantities and cost of all materials and supplies p...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.03 - Monthly Report on Material Inspection (Author request: content was: "105 - Control of Materials '''105.03 - MONTHLY REPORT ON MATERIAL INSPECTION''' VISUAL INSPECTION - All materials should be visually inspected (VI) prior to incorporation into the project. Materials may be accepted ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.02 - Transfer of Tested Materials (Author request: content was: "105 - Control of Materials '''105.02 - TRANSFER OF TESTED MATERIAL''' When transferring construction materials which were tested and accepted for a specific project but are to be used on another project, it is not ne...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 105.01 - General Information (Author request: content was: "105 - Control of Materials '''105.01 - GENERAL INFORMATION''' All materials incorporated into the project must be tested by MDOT, certified by the manufacturer as meeting the applicable specifications, selected from ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.12 - Supplies and Equipment Paint Colors (Author request: content was: "104 - Construction Surveying '''104.12 - SUPPLIES AND EQUIPMENT PAINT COLORS''' When painting removal items, grades, witness stakes, etc., only certain colors are to be used. The color that has been set aside for su...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.11 - Consultant/Contractor Staking Quality Assurance Guidelines (Author request: content was: "104 - Construction Surveying '''104.11 - CONSULTANT/CONTRACTOR STAKING QUALITY ASSURANCE GUIDELINES''' The number of checks noted below are considered to be the minimum to be taken over the life of the project. When...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.10 - Reporting Sturcture Clearances (Author request: content was: "104 - Construction Surveying '''104.10 - REPORTING STRUCTURE CLEARANCES''' It is necessary to measure and report altered clearances. This needs to be done in the case of new construction, or improvement of existing ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.09 - Bridge Staking (Author request: content was: "104 - Construction Surveying '''104.09 - BRIDGE STAKING''' The Engineer will furnish a stakeout diagram or a baseline and reference point coordinates for each bridge and box culvert. Information on the stakeout diag...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.08 - Construction Staking (Author request: content was: "104 - Construction Surveying '''104.08 - CONSTRUCTION STAKING''' All construction staking and information given to the Contractor shall be properly documented. The crew chief or Engineer shall advise the Contractor ...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.07 - Cross Sections (Author request: content was: "104 - Construction Surveying '''104.07 - CROSS SECTIONS''' The purpose of cross sectioning is to determine accurate information from which to compute earthwork quantities. Before starting, the crew chief should inst...)
- 15:53, 21 May 2014 Greenes2 talk contribs deleted page 104.06 - Vertical Curves (Author request: content was: "104 - Construction Surveying '''104.06 - VERTICAL CURVES''' MDOT generally uses equal tangent vertical curves. An equal tangent vertical curve sketch is shown in '''''Figure 104-20'''''. File:Figure104.06-1.JPG|thu...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.05 - Vertical Control (Author request: content was: "104 - Construction Surveying '''104.05 - VERTICAL CONTROL''' Before any level work is done on a project, the bench marks shown on the plans must be checked for elevation and location. It is the policy of the departm...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.04 - Right-of-Way (Author request: content was: "104 - Construction Surveying '''104.04 - RIGHT-OF-WAY''' ROW limits should be established before construction begins. Stakes marking the ROW line should be set on both sides of the construction centerline at 100 foo...)
- 15:52, 21 May 2014 Greenes2 talk contribs deleted page 104.03 - Horizontal Curves (Author request: content was: "104 - Construction Surveying '''104.03 - HORIZONTAL CURVES''' Before running horizontal curves or spirals, the data should be checked and deflection angles and chord lengths computed. If coordinates are going to be ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 104.02 - Horizontal Control (Author request: content was: "104 - Construction Surveying '''104.02 - HORIZONTAL CONTROL''' Horizontal control begins with locating the control points, traverse points, mapping points, section corners, etc., set by Design surveys. These points ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 104.01 - General (Author request: content was: "104 - Construction Surveying '''104.01 - GENERAL''' To ensure uniformity and to reduce errors the procedures, methods and policies presented in this section should be followed. A large portion of engineering costs i...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.13 - Contractor Claims for Extra Compensation (Author request: content was: "103 - Post Award Administration '''103.13 - CONTRACTOR CLAIMS FOR EXTRA COMPENSATION''' When the Contractor deems extra compensation is due for work not clearly covered in the contract, the Contractor must notify the...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.12 - Administrative Board Requirements (Author request: content was: "103 - Post Award Administration '''103.12 - ADMINISTRATIVE BOARD REQUIREMENTS''' '''103.12.1''' State of Michigan, Administrative Board allows MDOT to authorize extras (and those adjustments that are also extras) ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.11 - Submitting Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.11 - SUBMITTING CONTRACT MODIFICATIONS''' '''103.11.1 Post Final -''' When a contract modification is processed after the project has been finaled, generally the result of a ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.10 - Failure to Sign (Author request: content was: "103 - Post Award Administration '''103.10 - FAILURE TO SIGN''' When a Contractor fails to sign a change contract modification, the contract modification should be submitted unsigned after 21 calendar days. If a Cont...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.09 - Balancing Quantities (Author request: content was: "103 - Post Award Administration '''103.09 - BALANCING QUANTITIES''' Balancing Contract Modifications should be prepared as soon as contract items are completed. Do not delay submitting Contract Modifications until t...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.08 - FHWA Approval (Author request: content was: "103 - Post Award Administration '''103.08 - FHWA APPROVAL''' Federally funded projects are considered in two categories, EXEMPT or NONEXEMPT. An EXEMPT project does not require FHWA review and oversight. A NONEXEMP...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.07 - Basis of Payment for Extra Work (Author request: content was: "103 - Post Award Administration '''103.07 - BASIS OF PAYMENT FOR EXTRA WORK''' Documenting the basis of payment on the contract modification for extra work is necessary. Payment can be based on negotiated unit price...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.06 - Distribution (Author request: content was: "103 - Post Award Administration '''103.06 - DISTRIBUTION''' For ''FieldManager'' Version 3.0 and above the Contract Modification is approved and authorized at the Region level. If the Contract Modification does not ...)
- 15:49, 21 May 2014 Greenes2 talk contribs deleted page 103.01 - Work Order (Author request: content was: "103 - Post Award Administration '''103.01 - WORK ORDER''' The Work Order, Form 1137, is a written order signed by the Engineer and requiring performance by the Contractor. Signed work orders have contractual status....)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.05 - Preparing COntract Revisions (Author request: content was: "103 - Post Award Administration '''103.05 - PREPARING CONTRACT MODIFICATIONS''' Contract modifications are usually prepared by the Engineer. If possible, contract modifications should be approved before the work is ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.04 - Decimal Values (Author request: content was: "103 - Post Award Administration '''103.04 - DECIMAL VALUES''' Quantities for Contract Modifications should be computed to the same decimal values shown in the summary of quantities in the contract or proposal, or tot...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.03 - Types of Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.03 - TYPES OF CONTRACT MODIFICATIONS''' '''103.03.1 Changes in Contract''' A change in the contract alters the quantity of existing contract items. This includes items bid ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 103.02 - Contract Revisions (Author request: content was: "103 - Post Award Administration '''103.02 - CONTRACT MODIFICATIONS''' The Standard Specifications for Construction define a contract modification as the regulation form prepared as a recommendation for changes in, ad...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.04 - PreConstruction Meeting (Author request: content was: "102 - PreConstruction Administration '''102.04 - PRECONSTRUCTION MEETING''' A preconstruction meeting will be initiated by the Engineer when authorized or once the confirmed low bidder is announced. Representatives ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page Kari test page (Author request: content was: "<center>For copies of this manual contact the MDOT Publications Office</center> <center>Telephone: (517) 322-1676 Fax: (517) 322-1395</center> <center></..." (and the only contributor was "[[Special:Contributions/Obri...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.02 - Plans, Proposals, Input, Review, and Evaluation (Author request: content was: "102 - PreConstruction Administration '''102.02. - PLANS, PROPOSAL, INPUT, REVIEW AND EVALUATION''' With the advent of Plan Review Reengineering, the Engineer assigned to the construction of the project is now involve...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 102.01 - Contractor Evaluations and Prequalification (Author request: content was: "102 - PreConstruction Administration '''102.01 - CONTRACTOR EVALUATIONS AND PREQUALIFICATION''' At a minimum, Contractor evaluations for the last two construction seasons are reviewed when the Contractor applies for ...)
- 15:44, 21 May 2014 Greenes2 talk contribs deleted page 101.10 - Controlling Consultant Costs (Author request: content was: "101 - General Project Administration '''101.10. - CONTROLLING CONSULTANT COSTS''' The Regions are charged with knowing their costs and controlling their construction engineering costs. As several consultant construc...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.05 - Certified Payrolls (Author request: content was: "101 - General Project Administration '''101.05 - CERTIFIED PAYROLLS''' '''101.05.1 State Funded Projects ''' Certified weekly payrolls covering the Contractor’s and the Subcontractors’ work forces will not be...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.03 - Field Manager (Author request: content was: "101 - General Project Administration '''101.03 - FIELDMANAGER''' [http://michigan.gov/mdot/0,1607,7-151-9625_47921---,00.html FieldManager] is a construction management system employed by over 1000 users to manage an...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.02 - Project Records (Author request: content was: "101 - General Project Administration '''101.02 - PROJECT RECORDS''' To ensure uniform record keeping of project documents, a standard filing system is followed in each project office. These procedures will be follow...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.09 - Disadvantaged Business Enterprises (DBE's) (Author request: content was: "101 - General Project Administration '''101.09 - DISADVANTAGED BUSINESS ENTERPRISES (DBE’s)''' DBE’s are defined as those prime and subcontractors, truckers, materials suppliers and other service providers who ar...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.08 - On the Job Training (Author request: content was: "101 - General Project Administration '''101.08 - ON-THE-JOB TRAINING''' As of January 1, 2001, MDOT has implemented a new OJT Pilot Program designed to provide training in the skilled construction trade classifica...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.07 - Equal Employment Opportunity (Author request: content was: "101 - General Project Administration '''101.07 - EQUAL EMPLOYMENT OPPORTUNITY''' For these regulations, minorities are defined as Black, Asian or Pacific Islanders, Native American and Hispanic. Compliance with the ...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.06 - Davis-Bacon Provisions (Author request: content was: "101 - General Project Administration '''101.06 - DAVIS-BACON PROVISIONS''' '''101.06.1 Truck Drivers - Owner/Operators''' These individuals are not subject to the wage rates prescribed by the Department of Labor....)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.04 - Inspector's Daily Reports (Author request: content was: "101 - General Project Administration '''101.04 - INSPECTOR’S DAILY REPORT (IDR)''' Perhaps the single most important type of project documentation is the Inspector’s Daily Report (IDR) and its variations. Becaus...)
- 15:37, 21 May 2014 Greenes2 talk contribs deleted page 101.01 - Project Authority (Author request: content was: "101 - General Project Administration '''101.01 - PROJECT AUTHORITY''' It is important that users of the manual understand their role in ensuring that specifications are adhered to in completing the project. Each per...)
- 15:36, 21 May 2014 Greenes2 talk contribs deleted page 210.06 - Dust Control (Author request: content was: "210 - Environmental '''210.06 - DUST CONTROL''' Dust control is very important, especially during the earthwork phase of construction. Adequate dust control measures will be maintained by the Contractor so as not to...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.05 - Contractor Yards (Author request: content was: "210 - Environmental '''210.05 - CONTRACTOR YARDS''' As mentioned in Section 205 of this manual, under Borrow/Use of Excess Property, the Contractor is not allowed to use sta...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.04 - Discovery of Bones, Archeological, and Historical Findings (Author request: content was: "210 - Environmental '''210.04 - DISCOVERY OF BONES, ARCHAEOLOGICAL AND HISTORICAL FINDINGS''' Subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/107%20Legal%20Rel,%20Resp%20to%20Public.pdf 107.09] of th...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.03 - Hazardous Waste Site Identification Numbers (MIK Numbers) (Author request: content was: "210 - Environmental '''210.03 - HAZARDOUS WASTE SITE IDENTIFICATION NUMBERS (MIK NUMBERS)''' In the past, when waste site identification numbers, formerly MIK numbers, were needed, they were obtained from the Environ...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.02 - Removal of Underground Storage Tanks (Author request: content was: "210 - Environmental '''210.02 - REMOVAL OF UNDERGROUND STORAGE TANKS''' MDOT has the responsibility to remove any underground storage tanks (USTs) found within the ROW, even if not in direct conflict with the propose...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 210.01 - General (Author request: content was: "210 - Environmental '''210.01 - GENERAL''' This section of the manual is not intended to be an all-inclusive environmental guidance document, but addresses those environmental issues that are commonly associated with...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 209.01 - General (Author request: content was: "209 - Project Cleanup '''209.01 - GENERAL''' This work consists of cleaning up the project, including roadsides, prior to final acceptance. Cleanup applies to the area within the ROW not in excess of 50 feet (15 met...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 208.05 - Non-Compliance Progressive Steps (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.05 - NON-COMPLIANCE PROGRESSIVE STEPS''' '''208.05.01''' The following are suggested progressive steps to take if a Contractor fails to comply with eithe...)
- 15:35, 21 May 2014 Greenes2 talk contribs deleted page 208.02 - Soil Erosion and Sedimentation Control Guidelines (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.02 - SOIL EROSION AND SEDIMENTATION CONTROL GUIDELINES''' '''208.02.01''' Notification: While individual permits are not necessary, the Engineer is requi...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.04 - Winter Shutdown (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.04 - WINTER SHUTDOWN''' '''208.04.01''' MDOT is able to suspend NPDES inspections during the winter on those projects that satisfy all of the following c...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.03 - National Pollutuion Discharge Eliminaton System (NPDES) Guidelines (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.03 - NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM GUIDELINES''' '''208.03.01''' The proposal for projects subject to NPDES regulations, earth disturba...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 208.01 - General (Author request: content was: "208 - Soil Erosion and Sedimentation Control (NPDES) '''208.01 - GENERAL''' '''208.01.01''' MDOT is responsible to provide transportation services in an environmentally sensitive manner. To that end, the followi...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 207.01 - General (Author request: content was: "207 - Obliterating Roadway '''207.01 - GENERAL''' Obliterating roadway applies only on those portions of the existing or temporary roadway outside the limits of the new roadway. The ditches will be filled and roadwa...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.04 - Suitability of Foundation Material (Author request: content was: "206 - Excavation and Backfill for Structures '''206.04 - SUITABILITY OF FOUNDATION MATERIAL''' Final excavation for the foundation to grade will not be made until just before the concrete is to be placed. Concrete w...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.03 - Excavation for Structures (Author request: content was: "206 - Excavation and Backfill for Structures '''206.03 - EXCAVATION FOR STRUCTURES''' Foundation excavation is set up for the excavation of all materials, except rock, encountered within the foundation excavation lim...)
- 15:34, 21 May 2014 Greenes2 talk contribs deleted page 206.02 - Backfill for Structures (Author request: content was: "206 - Excavation and Backfill for Structures '''206.02 - BACKFILL FOR STRUCTURES''' Backfill for structures that are bridges, grade separations, pump houses and retaining walls shall be Granular Material Class II, un...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 206.01 - Preparing Abutment Areas (Author request: content was: "206 - Excavation and Backfill for Structures '''206.01 - PREPARING ABUTMENT AREA''' The importance of the proper construction of bridge abutment embankments cannot be overemphasized. The abutments are rigid structur...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.15 - Measurement of Earthwork (Author request: content was: "205 - Roadway Earthwork '''205.15 - MEASUREMENT OF EARTHWORK''' If no changes occur during construction and there are no known design errors, final quantities for earth excavation, embankment CIP and top 3 feet (1 m)...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.14 - Machine Grading (Author request: content was: "205 - Roadway Earthwork '''205.14 - MACHINE GRADING''' Machine grading is used only when light grading, such as may be accomplished with a blade grader, is required to develop the desired section. This item includes...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.13 - Wetland Construction (Author request: content was: "205 - Roadway Earthwork '''205.13 - WETLAND CONSTRUCTION''' If a wetland is to be constructed in association with a project for mitigation purposes, there will generally be plan sheets detailing the construction requ...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.12 - Borrow/Use of Excess Property (Author request: content was: "205 - Roadway Earthwork '''205.12 - BORROW/USE OF EXCESS PROPERTY''' Earth material found outside the grading limits is considered borrow material. This can include material either inside or outside the ROW. Unless...)
- 15:32, 21 May 2014 Greenes2 talk contribs deleted page 205.11 - Trimming and Finishing Earth Grade (Author request: content was: "205 - Roadway Earthwork '''205.11 - TRIMMING AND FINISHING EARTH GRADE''' After the earth grade has been constructed to the required grade, all stones and rocks more than 3 inches (80 mm) in diameter appearing on the...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.10 - Test Rolling (Author request: content was: "205 - Roadway Earthwork '''205.10 - TEST-ROLLING''' Test-rolling the grade is a very important procedure for determining uniform stability of the subgrade. Perhaps the most important subgrade quality to attain is st...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.09 - Swamp Treatment (Author request: content was: "205 - Roadway Earthwork '''205.09 - SWAMP TREATMENT''' All swamp areas should be shown on plans with a specific method of treatment indicated. All low, poorly drained areas not shown as peat or muck should neverthel...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.08 - Constructing Embankments (Author request: content was: "205 - Roadway Earthwork '''205.08 - CONSTRUCTING EMBANKMENTS''' Embankments are generally constructed by three methods. (The last method will be discussed under Swamp Treatment. * Controlled density method. * 12 i...)
- 15:31, 21 May 2014 Greenes2 talk contribs deleted page 205.07 - Disposing of Surplus and Unsuitable Material (Author request: content was: "205 - Roadway Earthwork '''205.07 - DISPOSING OF SURPLUS AND UNSUITABLE MATERIAL''' The Contractor will be responsible for disposal of all surplus and unsuitable material. If it is disposed of in a storage area, spe...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.06 - Constructing Ditches (Author request: content was: "205 - Roadway Earthwork '''205.06 - CONSTRUCTING DITCHES''' Removal of material from ditches is generally classed as earth excavation as ditches are normally excavated along with general road cut using typical earth ...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.05 - Subgrade Undercutting (Author request: content was: "205 - Roadway Earthwork '''205.05 - SUBGRADE UNDERCUTTING''' There are three types of subgrade undercutting, all of which include backfilling and compaction. * Type I will be backfilled with selected clay or other s...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.04 - Blasting (Author request: content was: "205 - Roadway Earthwork '''205.04 - BLASTING''' Before using explosives on a project, the Contractor is to furnish the Engineer with a copy of the "rider" or clause in the insurance policy as evidence that there is a...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.03 - Rock Excavation (Author request: content was: "205 - Roadway Earthwork '''205.03 - ROCK EXCAVATION''' This work consists of the removal of solid rock or cemented soils that do not soften when wet or cannot be excavated without continuous drilling, blasting or con...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.02 - Preparing Roadway Foundation (Author request: content was: "205 - Roadway Earthwork '''205.02 - PREPARING ROADWAY FOUNDATION''' The roadway foundation must be properly prepared to provide uniform support and a stable structure. During embankment construction, the following o...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 205.01 - Earth Excavation (Author request: content was: "205 - Roadway Earthwork '''205.01 - EARTH EXCAVATION''' Section [http://mdotcf.state.mi.us/public/specbook/files/2012/205%20Roadway%20Earthwork.pdf 205] of the Standard Specifications for Construction details constru...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.03 - Hot Mix Asphalt (HMA) Pavements and Driveways (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.03 - HOT MIX ASPHALT (HMA) PAVEMENTS AND DRIVEWAYS''' For removal of HMA pavements and driveways: If the HMA surface removed is 5 inches (130 mm) or less ...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.02 - Structures (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.02 - STRUCTURES''' All structures and attached parts and connections shown on the plans to be removed will be entirely removed. Structures requiring remov...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 204.01 - Documentation (Author request: content was: "204 - Removing Miscellaneous Structures and Materials '''204.01 - DOCUMENTATION''' Identifying, measuring and recording removal items on an IDR (or on Form 1122A) are very important. If the Contractor chooses to dis...)
- 15:30, 21 May 2014 Greenes2 talk contribs deleted page 203.02 - Culvert of Sewer (Author request: content was: "203 - Removing Drainage Structures, Culverts, and Sewers '''203.02 - CULVERT OR SEWER''' When a culvert pipe and/or sewer pipe is to be removed, the culvert pipe and/or sewer pipe (and end treatments) are to be compl...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 203.01 - Drainage Structures (Author request: content was: "203 - Removing Drainage Structures, Culverts, and Sewers '''203.01 - DRAINAGE STRUCTURES''' When removing or abandoning a drainage structure, any live sewers connected to them will be rebuilt and properly connected t...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 202.02 - Instructions for Removing Corduroy (Author request: content was: "202 - Removing Trees, Stumps, and Corduroy '''202.02 - INSTRUCTIONS FOR REMOVING CORDUROY''' When corduroy is found within 4 feet (1.2 m) below plan grade, its removal will be by the foot (meter) measured along the r...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 202.01 - Instructions for Removing Trees and Stumps (Author request: content was: "202 - Removing Trees, Stumps, and Corduroy '''202.01 - INSTRUCTIONS FOR REMOVING TREES AND STUMPS''' These items will apply to locations outside the areas to be paid as '''Clearing'''. Work in progress and work comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 201.01 - General (Author request: content was: "201 - Clearing '''201.01 - GENERAL''' Before beginning any construction operation, refer to subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/107%20Legal%20Rel,%20Resp%20to%20Public.pdf 107.15], Compli...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.04 - Weighing Materials (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.04 - WEIGHING MATERIALS''' Materials paid for by weight are required to be weighed on an approved scale system. There are permanent and portable scale systems. '''307...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.03 - Measurement and Payment (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.03 - MEASUREMENT AND PAYMENT''' Where trenching is required on both sides of the road, each side will be measured separately along the road centerline. When shoulders ...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 307.02 - Construction (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.02 - CONSTRUCTION''' '''307.02.1 Trenching''' When trenching is proposed, the operations will not be performed beyond the distance that will be backfilled and comp...)
- 15:29, 21 May 2014 Greenes2 talk contribs deleted page 301.03 - Measurement and Payment (Author request: content was: "301 - Subbase '''301.03 - MEASUREMENT AND PAYMENT''' Plan quantity plus or minus any known changes, if agreed to by the Engineer and Contractor, as a basis for final quantity for subbase, is encouraged whenever possi...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 305.01 - General (Author request: content was: "305 - HMA Base Crushing and Shaping '''305.01 - GENERAL''' '''305.01.1 Equipment''' The age of the equipment being used by the Contractor will have an effect on the amount of additional crushed material through ...)
- 15:24, 21 May 2014 Greenes2 talk contribs deleted page 307.01 - General (Author request: content was: "307 - Aggregate Shoulders and Approaches '''307.01 - GENERAL''' For all trenching, shoulder and approach operations that cannot be completed at the end of the day, the Contractor will place and maintain traffic contr...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 306.01 - General (Author request: content was: "306 - Aggregate Surface Course '''306.01 - GENERAL''' Compliance with density requirements for aggregate surface course construction is just as important as for aggregate base construction. Poor compactive efforts a...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.04 - Inspection (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.04 - INSPECTION''' The inspector should study the staging details very carefully. In situations where the road must be reopened for traffic, the rubblizing Contractor a...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.03 - Materials (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.03 - MATERIALS''' Filler aggregate will meet the Open-graded Aggregate 3G Specification, Section [http://mdotcf.state.mi.us/public/specbook/files/2012/902%20Aggregate.pd...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.02 - Equipment (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.02 - EQUIPMENT''' Equipment will be as listed in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/304%20Rubbilizing%20PCC%20Pavt.pdf 304.03] of the Stand...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 304.01 - Description (Author request: content was: "304 - Rubbilizing Existing PCC Pavement '''304.01 - DESCRIPTION''' This work will consist of rubblizing existing concrete pavements to be used as a base course for Hot Mix Asphalt (HMA) pavements.")
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 303.01 - General (Author request: content was: "303 - Open Graded Drainage Course '''303.01 - GENERAL''' The plans and proposal should be reviewed for notes or special provisions pertaining to open graded drainage course (OGDC). OGDC is intended to provide a stab...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.03 - Measurement and Payment (Author request: content was: "302 - Aggregate Base Courses '''302.03 - MEASUREMENT AND PAYMENT''' '''302.03.1 Payment by Square Yard (Square Meter)''' The following criteria should be adhered to with payment by the square yard (square meter)...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.02 - Construction (Author request: content was: "302 - Aggregate Base Courses '''302.02 - CONSTRUCTION''' '''302.02.1 Placing and Compacting''' Some cross sections are designed with a “step” in the subbase and a different aggregate depth in the shoulder ar...)
- 15:23, 21 May 2014 Greenes2 talk contribs deleted page 302.01 - Materials (Author request: content was: "302 - Aggregate Base Courses '''302.01 - MATERIALS''' Aggregates from dense graded series 21AA, 21A and 22A will be used for aggregate bases as per subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/902...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 301.02 - Construction (Author request: content was: "301 - Subbase '''301.02 - CONSTRUCTION''' '''301.02.1 Procedure''' The subbase will be placed on an approved subgrade surface that meets density and cross section requirements. Verify that subgrade has been exam...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 301.01 - Materials (Author request: content was: "301 - Subbase '''301.01 - MATERIALS''' Granular Material Class II will be used for constructing subbase.")
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 405.01 - General (Author request: content was: "405 - Pump Station Construction '''405.01- GENERAL''' Pump station construction is extremely specialized work. For this reason, if a pump station is to be constructed, Section [http://mdotcf.state.mi.us/public/specb...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.03 - Measurement (Author request: content was: "404 - Underdrain '''404.03 - MEASUREMENT''' The inspector must measure and record trench dimensions to ensure that specification widths and depths are being obtained. Underdrains, edgedrains and bank drains are meas...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.02 - Materials (Author request: content was: "404 - Underdrain '''404.02 - MATERIALS''' Subgrade underdrains are slotted or perforated drains placed near the edge of the traveled way for the purpose of lowering a high groundwater condition or draining a granular...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 404.01 - General (Author request: content was: "404 - Underdrain '''404.01 - GENERAL''' It is very difficult to determine the extent and volume of groundwater infiltration. Experienced Region Soils personnel usually make this determination. The inspector should ...)
- 15:22, 21 May 2014 Greenes2 talk contribs deleted page 403.04 - Adjusting Drainage Sturctures (Author request: content was: "403 - Drainage Structures '''403.04 - ADJUSTING DRAINAGE STRUCTURES''' Refer to subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/403%20Drainage%20Structures.pdf 403.04] of the Standard Specifications ...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.03 - Backfilling Drainage Sturctures (Author request: content was: "403 - Drainage Structures '''403.03 - BACKFILLING DRAINAGE STRUCTURES''' Backfilling is to be done in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03]...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.02 - Construction Methods (Author request: content was: "403 - Drainage Structures '''403.02. - CONSTRUCTION METHODS''' Excavation for drainage structures is to be performed in accordance with subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/206%20Exc,%20Ba...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 403.01 - General (Author request: content was: "403 - Drainage Structures '''403.01 - GENERAL''' Drainage structures refer to manholes, catch basins, leaching basins, inlets and drop inlets as detailed on Standard Plan R-1 series or on project plans. A drainage s...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.08 - Illicit Connections (Author request: content was: "402 - Storm Sewers '''402.08 - ILLICIT CONNECTIONS''' If unusual or suspicious connections to MDOT’s storm sewer system are found during a construction project (e.g. the presence of a sudsy discharge or oily discha...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.07 - Sewer Taps (Author request: content was: "402 - Storm Sewers '''402.07 - SEWER TAPS''' Connections to storm sewers owned by counties, municipalities or drain commissions shall be according to the regulations of the owner and according to the plans and specif...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.06 - Sewer Pipe Jacked in Place (Author request: content was: "402 - Storm Sewers '''402.06 - SEWER PIPE JACKED-IN-PLACE''' Follow the requirements of subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03] of the Standard Specification...)
- 15:12, 21 May 2014 Greenes2 talk contribs deleted page 402.05 - Inspection After Installation (Author request: content was: "402 - Storm Sewers '''402.05 - INSPECTION AFTER INSTALLATION''' All of the general inspection points in the previous section on culverts apply to sewer pipes. '''402.05.1 Mandrel Testing''' If smooth lined corr...)
- 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.04 - Backfilling Sewer Pipe (Author request: content was: "402 - Storm Sewers '''402.04 - BACKFILLING SEWER PIPE''' Backfilling sewer pipe will be as specified in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/401%20Pipe%20Culverts.pdf 401.03] of the Standa...)
- 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.03 - Installation (Author request: content was: "402 - Storm Sewers '''402.03 - INSTALLATION''' Construction methods shall be according to the health and safety requirements in subsection [http://mdotcf.state.mi.us/public/specbook/files/2012/104%20Control%20of%20Wo...)
- 15:11, 21 May 2014 Greenes2 talk contribs deleted page 402.02 - Materials Inspection (Author request: content was: "402 - Storm Sewers '''402.02. - MATERIALS INSPECTION''' Some concrete storm sewer pipe does not contain reinforcement and therefore requires careful handling. Any pipe damaged in transit or by handling should be rej...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.06 - Pipe Culverts Jacked in Place (Author request: content was: "401 - Culverts '''401.06 - PIPE CULVERTS JACKED-IN-PLACE''' Pipe culverts jacked-in-place are used when it is desired to place a drainage feature without disturbing the roadbed or railroad above the pipe. The excava...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 402.01 - General (Author request: content was: "402 - Storm Sewers '''402.01 - GENERAL''' The inspector’s preliminary investigation should determine if the storm sewer is correctly staked and the storm sewer is the type, size and class called for in the plans, o...)
- 15:10, 21 May 2014 Greenes2 talk contribs deleted page 401.05 - Inspection after Installation (Author request: content was: "401 - Culverts '''401.05 - INSPECTION AFTER INSTALLATION''' Culvert sections showing signs of settlement or poor alignment shall, as directed by the Engineer, be taken up and relaid at the Contractor’s expense. An...)