Pages with the most revisions

Jump to navigation Jump to search

Showing below up to 247 results in range #1 to #247.

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)

  1. Main Page‏‎ (374 revisions)
  2. E-Construction‏‎ (134 revisions)
  3. 712 - Bridge Rehabilitation, Concrete‏‎ (122 revisions)
  4. Local Agency Program (LAP)‏‎ (99 revisions)
  5. 715 - Cleaning and Coating Existing Structural Steel‏‎ (76 revisions)
  6. 501 - Plant Produced Hot Mix Asphalt‏‎ (63 revisions)
  7. 707 - Structural Steel‏‎ (62 revisions)
  8. 811 - Permanent Pavement Markings‏‎ (61 revisions)
  9. 602 - Concrete Pavement Construction‏‎ (60 revisions)
  10. E-Signature‏‎ (59 revisions)
  11. 603 - Concrete Pavement Restoration‏‎ (57 revisions)
  12. 102.02 Contents of Proposal - Progress Clause‏‎ (55 revisions)
  13. Dev Page‏‎ (53 revisions)
  14. Disadvantaged Business Enterprises (DBE)‏‎ (50 revisions)
  15. 103.02 Contract Revisions‏‎ (50 revisions)
  16. FieldManager‏‎ (41 revisions)
  17. 109.07 Final Inspection, Acceptance, and Final Payment‏‎ (39 revisions)
  18. 208 - Soil Erosion and Sedimentation Control (NPDES)‏‎ (39 revisions)
  19. 704 - Steel Sheet Piling and Cofferdams‏‎ (39 revisions)
  20. 718 - Drilled Shafts‏‎ (38 revisions)
  21. 708 - Prestressed Concrete‏‎ (33 revisions)
  22. 601 - PCC Pavement Mixtures‏‎ (30 revisions)
  23. 701 - Portland Cement Concrete for Structures‏‎ (29 revisions)
  24. Certified Office Technician Process‏‎ (29 revisions)
  25. 714 - Temporary Structures and Approaches‏‎ (29 revisions)
  26. Construction Manual Wiki Tips‏‎ (28 revisions)
  27. Certified Engineer Process‏‎ (23 revisions)
  28. Invalid title with namespace "(Main)" and text "Division_1__General_Provisions"
  29. 820 - Traffic Signals‏‎ (22 revisions)
  30. 104.10 Contractor Claim for Extra Compensation or Time Extension‏‎ (21 revisions)
  31. Dispute Review Board (DRB)‏‎ (21 revisions)
  32. MDOT Construction Manual Content Revision Procedures‏‎ (21 revisions)
  33. Preconstruction Meeting‏‎ (21 revisions)
  34. 109.05 Payment for Contract Revisions‏‎ (20 revisions)
  35. 703 - Mortar and Concrete Patching Repair and Resurfacing Mixes‏‎ (20 revisions)
  36. 702 - Mortar and Grout‏‎ (19 revisions)
  37. 102.01 Prequalification of Bidders‏‎ (19 revisions)
  38. 803 - Concrete Sidewalk, Ramps, and Steps‏‎ (18 revisions)
  39. 102.18 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs)‏‎ (17 revisions)
  40. Materials Quality Assurance Procedures Manual‏‎ (16 revisions)
  41. 812 - Temporary Traffic Control for Construction Zone Operations‏‎ (16 revisions)
  42. 716 - Shop Cleaning and Coating Structural Steel‏‎ (15 revisions)
  43. 604 - Contractor Quality Control for Concrete‏‎ (15 revisions)
  44. 502 - HMA Crack Treatment‏‎ (15 revisions)
  45. Final Project Review‏‎ (14 revisions)
  46. 101.04 - Inspector's Daily Reports‏‎ (13 revisions)
  47. Prevailing Wage Oversight Procedures‏‎ (13 revisions)
  48. 713 - Bridge Rehabilitation, Steel‏‎ (13 revisions)
  49. 815 - Landscaping‏‎ (12 revisions)
  50. 719 - Earth Retaining Structures‏‎ (12 revisions)
  51. 807 - Guardrail, Guardrail Terminals, and Miscellaneous Posts‏‎ (12 revisions)
  52. Contract Administration and Oversight Guidelines for Projects Containing Warranty Work‏‎ (12 revisions)
  53. 705 - Foundation Piling‏‎ (12 revisions)
  54. 205 - Roadway Earthwork‏‎ (12 revisions)
  55. 109.08 Prompt Payment‏‎ (12 revisions)
  56. 710 - Waterproofing and Protective Covers‏‎ (12 revisions)
  57. 802 - Concrete Curb, Gutter, and Dividers‏‎ (11 revisions)
  58. Project Closeout Escalation of Accountability‏‎ (11 revisions)
  59. 706 - Structural Concrete‏‎ (11 revisions)
  60. LCPtracker Supplemental Information‏‎ (10 revisions)
  61. 2010 Updates‏‎ (10 revisions)
  62. 711 - Bridge Railings‏‎ (10 revisions)
  63. 401 - Culverts‏‎ (9 revisions)
  64. 206 - Excavation and Backfill for Structures‏‎ (9 revisions)
  65. Process for Documenting Certified Materials in FieldManager‏‎ (9 revisions)
  66. Mandrel Testing of Plastic Pipe‏‎ (9 revisions)
  67. Project Delays Due to a Utility Company‏‎ (9 revisions)
  68. 504 - Micro-Surfacing‏‎ (9 revisions)
  69. 108.01 Subcontracting of Contract Work‏‎ (9 revisions)
  70. 709 - Timber Sturctures‏‎ (9 revisions)
  71. 204 - Removing Miscellaneous Structures and Materials‏‎ (9 revisions)
  72. 106 - Quality Assurance Acceptance Program‏‎ (9 revisions)
  73. 819 - Electrical and Lighting‏‎ (9 revisions)
  74. 108.07 Extension of Time on Work Day Contracts‏‎ (9 revisions)
  75. 104.07 Contractor Obligations‏‎ (9 revisions)
  76. Construction Field Services Indirect Testing Charges‏‎ (9 revisions)
  77. Division 7 Supplemental Information‏‎ (9 revisions)
  78. 806 - Bicycle Paths‏‎ (8 revisions)
  79. 717 - Downspouts and Drains‏‎ (8 revisions)
  80. 150 - Mobilization‏‎ (8 revisions)
  81. Quality Initiatives and Adjustments‏‎ (8 revisions)
  82. 402 - Storm Sewers‏‎ (8 revisions)
  83. Construction Value Engineering Change Proposal (VECP)‏‎ (8 revisions)
  84. Frequently Searched Items‏‎ (8 revisions)
  85. 105.10 Buy America Source of Steel and Iron‏‎ (8 revisions)
  86. 813 - Slope Protection‏‎ (8 revisions)
  87. 109.04 Progress and Partial Payments‏‎ (8 revisions)
  88. 804 - Concrete Barriers and Glare Screens‏‎ (8 revisions)
  89. Division 2 Supplemental Information‏‎ (8 revisions)
  90. 816 - Turf Establishment‏‎ (7 revisions)
  91. 506 - Slurry Seal‏‎ (7 revisions)
  92. 108.10 Liquidated Damages‏‎ (7 revisions)
  93. Section 601 - Portland Cement Concrete for Pavements‏‎ (7 revisions)
  94. 805 - Hot Mix Asphalt Curb‏‎ (7 revisions)
  95. 809 - Field Office‏‎ (7 revisions)
  96. Extending Project Limits‏‎ (7 revisions)
  97. 605 - Contractor Quality Assurance for Concrete‏‎ (7 revisions)
  98. 814 - Paved Ditches‏‎ (7 revisions)
  99. 202 - Removing Trees, Stumps, and Corduroy‏‎ (7 revisions)
  100. Interim File Review‏‎ (7 revisions)
  101. 403 - Drainage Structures‏‎ (7 revisions)
  102. 304 - Rubbilizing Existing PCC Pavement‏‎ (7 revisions)
  103. 101 - Terms, Format, and Conditions‏‎ (7 revisions)
  104. 207 - Obliterating Roadway‏‎ (7 revisions)
  105. Davis-Bacon and State Prevailing Wage Information‏‎ (6 revisions)
  106. 108.05 Progress Schedule‏‎ (6 revisions)
  107. 505 - Chip Seals‏‎ (6 revisions)
  108. 817 - Landscape Mowing‏‎ (6 revisions)
  109. 808 - Fencing‏‎ (6 revisions)
  110. 818 - Dune Grass Planting‏‎ (6 revisions)
  111. 824 - Contractor Staking‏‎ (6 revisions)
  112. 404 - Underdrain‏‎ (6 revisions)
  113. 822 - Ground or Cut Centerline and Shoulder Corrugations‏‎ (6 revisions)
  114. 201 - Clearing‏‎ (6 revisions)
  115. 810 - Permanent Traffic Signs and Supports‏‎ (6 revisions)
  116. 209 - Project Cleanup‏‎ (6 revisions)
  117. 821 - Preservation of Land Monuments and Property Corners‏‎ (6 revisions)
  118. 105.01 Quality and Scope of Supply‏‎ (6 revisions)
  119. 107.15 Compliance with Laws; Environmental Protection‏‎ (6 revisions)
  120. 801 - Concrete Driveways‏‎ (6 revisions)
  121. Work Order‏‎ (5 revisions)
  122. 306 - Aggregate Surface Course‏‎ (5 revisions)
  123. 305 - HMA Base Crushing and Shaping‏‎ (5 revisions)
  124. 823 - Water Mains‏‎ (5 revisions)
  125. Contractor's Equipment and Traffic Control‏‎ (5 revisions)
  126. 203 - Removing Drainage Structures, Culverts, and Sewers‏‎ (5 revisions)
  127. 2012 Updates‏‎ (5 revisions)
  128. 109.01 Measurement of Quantities‏‎ (5 revisions)
  129. 301 - Subbase‏‎ (5 revisions)
  130. 302 - Aggregate Base Courses‏‎ (5 revisions)
  131. 405 - Pump Station Construction‏‎ (5 revisions)
  132. Notice of Non-Compliance with Contract Requirements‏‎ (5 revisions)
  133. Processing Sewage/Storm Water Damage Claims‏‎ (5 revisions)
  134. 303 - Open Graded Drainage Course‏‎ (5 revisions)
  135. 307 - Aggregate Shoulders and Approaches‏‎ (5 revisions)
  136. Letter to File‏‎ (5 revisions)
  137. Revision Navigation‏‎ (4 revisions)
  138. Invalid title with namespace "(Main)" and text "101.4_INSPECTORS_DAILY_REPORT_(IDR)"
  139. Holiday Traffic Safety Provisions‏‎ (4 revisions)
  140. Structural Fabrication Quality Manual‏‎ (4 revisions)
  141. 107.09 Archeological and Historical Findings‏‎ (4 revisions)
  142. 107.12 Contractor's Responsibility for Utility Property and Services‏‎ (4 revisions)
  143. FPR Frequently Asked Questions‏‎ (4 revisions)
  144. 503 - Paver Placed Surface Seal‏‎ (4 revisions)
  145. Contract Administration and Oversight Guidelines for Intelligent Transportation Systems (ITS) Projects‏‎ (4 revisions)
  146. Apprentices and Trainees‏‎ (4 revisions)
  147. 109.02 Scope of Payment‏‎ (4 revisions)
  148. 109.03 Payments for Increased or Decreased Quantities‏‎ (4 revisions)
  149. 406 - Precast Three-Sided, Arch, and Box Culverts‏‎ (4 revisions)
  150. 308 - Geotextiles for Base‏‎ (4 revisions)
  151. 2013 Updates‏‎ (4 revisions)
  152. FHWA CAP Action Plans‏‎ (4 revisions)
  153. 107.19 Hauling on Local Roads and Streets‏‎ (4 revisions)
  154. Weight Limit Waivers‏‎ (4 revisions)
  155. 104.09 Lines, Grades, and Elevations‏‎ (3 revisions)
  156. 104.01 Authority of the Department‏‎ (3 revisions)
  157. Plans, Proposal, Input, Review and Evaluation‏‎ (3 revisions)
  158. Commentary - Special Provision for Quality Control and Acceptance of Portland Cement Concrete 12SP604(B)‏‎ (3 revisions)
  159. Hot Mix Asphalt Production Manual‏‎ (3 revisions)
  160. Section 701 - Portland Cement Concrete for Structures‏‎ (3 revisions)
  161. Construction Technology Support Resources‏‎ (3 revisions)
  162. Table of Contents Division 1‏‎ (3 revisions)
  163. 105.07 Handling and Transporting Materials‏‎ (3 revisions)
  164. Table of Contents by Project Phase‏‎ (2 revisions)
  165. Module:Yesno‏‎ (2 revisions)
  166. Module:Documentation‏‎ (2 revisions)
  167. 701-Portland Cement Concrete for Structures‏‎ (2 revisions)
  168. Module:Message box/configuration‏‎ (2 revisions)
  169. 700 - Closure of Unsafe Structures‏‎ (2 revisions)
  170. Module:HtmlBuilder‏‎ (2 revisions)
  171. Division 3 Supplemental Information‏‎ (2 revisions)
  172. Module:Namespace detect‏‎ (2 revisions)
  173. Railroad Highway Projects‏‎ (2 revisions)
  174. Module:Message box‏‎ (2 revisions)
  175. 2011 Updates‏‎ (2 revisions)
  176. Module:Category handler‏‎ (2 revisions)
  177. 103.01 Intent of the Contract‏‎ (2 revisions)
  178. Module:Arguments‏‎ (2 revisions)
  179. Module:Documentation/config‏‎ (2 revisions)
  180. Module:Namespace detect/data‏‎ (2 revisions)
  181. Module:Namespace detect/config‏‎ (2 revisions)
  182. 102.03 Interpretation of Bid Items in the Proposal‏‎ (2 revisions)
  183. Final Project Review Report‏‎ (2 revisions)
  184. 102.05 Preparation of Bid Items in the Proposal‏‎ (2 revisions)
  185. 102.06 Irregular Bids‏‎ (1 revision)
  186. 104.05 Removal of Unauthorized Work‏‎ (1 revision)
  187. 107.05 Sanitary Provisions‏‎ (1 revision)
  188. 108.06 Determination of Contract Time for Work Day Contracts‏‎ (1 revision)
  189. 102.07 Delivery of Bid‏‎ (1 revision)
  190. 104.06 Coordination of Drawing Dimensions and Contract Documentation‏‎ (1 revision)
  191. 107.06 Furnishing Right-of-Way‏‎ (1 revision)
  192. 108.08 Extension of Time on Calendar Day Contracts‏‎ (1 revision)
  193. 102.08 Withdrawal or Revision of Bid‏‎ (1 revision)
  194. 104.08 Cooperation by the Contractor‏‎ (1 revision)
  195. 107.07 Protection and Restoration of Property‏‎ (1 revision)
  196. 108.09 Request for Time Extensions on Work Day, Calendar Day, and Calendar Date Contracts‏‎ (1 revision)
  197. 102.09 Downloading of Bids‏‎ (1 revision)
  198. 104.11 Work Zone Safety and Mobility‏‎ (1 revision)
  199. 107.08 Land Monuments and Property Corners‏‎ (1 revision)
  200. 108.11 Default of Contract‏‎ (1 revision)
  201. 102.10 Bid Review‏‎ (1 revision)
  202. 104.12 Approval for Use of the Right of Way‏‎ (1 revision)
  203. 107.10 Indemnification, Damage Liability, and Insurance‏‎ (1 revision)
  204. 108.12 Termination of Contract‏‎ (1 revision)
  205. 102.11 Bid Rejection‏‎ (1 revision)
  206. 105.02 Natural Material Sources Found Within the Excavation Limits‏‎ (1 revision)
  207. 107.11 Contractor's Responsibility for the Work‏‎ (1 revision)
  208. 109.06 Source of Supply and Carrier Rates on Materials‏‎ (1 revision)
  209. Digital Calculations for Payment‏‎ (1 revision)
  210. 102.12 Bid Rejection Appeal‏‎ (1 revision)
  211. 105.03 Borrow Materials‏‎ (1 revision)
  212. 107.13 Personal Liability of Public Officials‏‎ (1 revision)
  213. 107.21 Open to Traffic‏‎ (1 revision)
  214. Project with Consultant Oversight‏‎ (1 revision)
  215. 102.13 Consideration of Bids‏‎ (1 revision)
  216. 105.04 Miscellameous Quantities‏‎ (1 revision)
  217. 107.14 No Waiver of Legal Rights‏‎ (1 revision)
  218. 102.15 Execution and Award of Contract‏‎ (1 revision)
  219. 105.05 Approval of Materials Incorporated into the Work‏‎ (1 revision)
  220. 107.16 Forest Protection‏‎ (1 revision)
  221. 102.16 Requirements of Contract Bonds‏‎ (1 revision)
  222. 105.06 Storage of Materials‏‎ (1 revision)
  223. 107.17 Use of Explosives‏‎ (1 revision)
  224. Projects with Incentive Provisions‏‎ (1 revision)
  225. 102.17 Bid Guaranty Payment‏‎ (1 revision)
  226. 105.08 Nonconforming Materials‏‎ (1 revision)
  227. 107.18 Work over Navigable Waters‏‎ (1 revision)
  228. Joe test page 5‏‎ (1 revision)
  229. 105.09 Materials not Incorporated into the Work‏‎ (1 revision)
  230. Pavement Historical Database‏‎ (1 revision)
  231. Table of Contents Division 1 Supplemental‏‎ (1 revision)
  232. 103.03 Contractor Engineer Communication‏‎ (1 revision)
  233. 107.01 Laws to be Observed‏‎ (1 revision)
  234. 107.20 Private Railroad Crossing for Haul Purposes‏‎ (1 revision)
  235. 104.02 Plans and Working Drawings‏‎ (1 revision)
  236. 107.02 Permits and Licenses‏‎ (1 revision)
  237. 108.02 Limitations of Operations‏‎ (1 revision)
  238. Oversight of Maintenance Funded Projects Using the Michigan Department of Transportation Letting System‏‎ (1 revision)
  239. Information Sharing About Construction Contractors and Consultants‏‎ (1 revision)
  240. 102.04 Examination of Plans, Specifications, and Work Site‏‎ (1 revision)
  241. 104.03 Deviations from the Plans‏‎ (1 revision)
  242. 107.03 Patented Process and Materials‏‎ (1 revision)
  243. 108.03 Competence of Workers‏‎ (1 revision)
  244. Manual Section and Page Number‏‎ (1 revision)
  245. 104.04 Conformity with the Contrat‏‎ (1 revision)
  246. 107.04 Federal Aid Participation‏‎ (1 revision)
  247. 108.04 Adequacy of Methods and Equipment‏‎ (1 revision)

View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)