Related changes

Jump to navigation Jump to search

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Show my edits | Show bots | Hide minor edits
Show new changes starting from 19:29, 23 January 2022
   
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

20 January 2022

     15:12  103.02 Contract Revisions‎‎ 2 changes history +183 [SchaeferS‎ (2×)]
 m   
15:12 (cur | prev) +21 SchaeferS talk contribs →‎Requirements for FHWA Review on Risk-Based Project Involvement (RBPI): added bolding
     
15:11 (cur | prev) +162 SchaeferS talk contribs →‎Requirements for FHWA Review on Projects of Division Interest (PoDI): Updated to FHWA Risk-Based Project Involvement (RBPI) Projects and Stewardship & Oversight Plan (S&O Plan)

19 January 2022

 m   15:01  102.18 Subletting Contract Work to Disadvantaged Business Enterprises (DBEs) diffhist -138 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   14:51  Structural Fabrication Quality Manual diffhist -158 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   14:47  Project Delays Due to a Utility Company diffhist -170 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   14:46  Process for Documenting Certified Materials in FieldManager diffhist -166 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   14:45  Preconstruction Meeting diffhist -138 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   13:59  Materials Quality Assurance Procedures Manual diffhist -166 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   13:54  Extending Project Limits diffhist -159 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   13:47  Digital Calculations for Payment diffhist -161 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   13:46  102.01 Prequalification of Bidders diffhist -138 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   11:43  811 - Permanent Pavement Markings diffhist -165 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   10:47  715 - Cleaning and Coating Existing Structural Steel diffhist -175 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   10:46  712 - Bridge Rehabilitation, Concrete diffhist -168 SchaeferS talk contribs Removed 2012 Spec Book tagline link

18 January 2022

     09:41  102.02 Contents of Proposal - Progress Clause diffhist 0 SchaeferS talk contribs →‎Progress Clause: Updated Typical Long-Lead Items for Delineator and 3# U-Channel Posts

13 January 2022

     11:41  501 - Plant Produced Hot Mix Asphalt‎‎ 2 changes history -25 [SchaeferS‎ (2×)]
     
11:41 (cur | prev) -50 SchaeferS talk contribs →‎Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant: Removed section cat
     
11:39 (cur | prev) +25 SchaeferS talk contribs →‎Utilizing Reclaimed Asphalt Pavement (RAP) Millings from the Same Project When Using a Portable Hot Mix Asphalt (HMA) Plant: Updated cat section

12 January 2022

 m   16:47  402 - Storm Sewers diffhist -158 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   16:39  108.07 Extension of Time on Work Day Contracts diffhist -171 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   16:38  108.01 Subcontracting of Contract Work diffhist -171 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   16:31  105.01 Quality and Scope of Supply diffhist -167 SchaeferS talk contribs Removed 2012 Spec Book tagline link
 m   16:28  103.02 Contract Revisions diffhist -159 SchaeferS talk contribs Removed 2012 Spec Book tagline link

5 January 2022

     07:57  Final Project Review Report diffhist +1 SchaeferS talk contribs Replaced Final Project Review Report User Guide with September 2020 version

4 January 2022

     13:53  102.02 Contents of Proposal - Progress Clause diffhist +25 SchaeferS talk contribs →‎Progress Clause: updated/added to Guardrail - Steel typical long-lead times
     13:25  109.07 Final Inspection, Acceptance, and Final Payment diffhist -71 SchaeferS talk contribs →‎Acceptance of Work: Removed outdated images and added updated image
     09:25  107.09 Archeological and Historical Findings‎‎ 2 changes history +192 [SchaeferS‎ (2×)]
     
09:25 (cur | prev) +93 SchaeferS talk contribs →‎LAP Project Considerations: Added link to LAP definitions
     
09:14 (cur | prev) +99 SchaeferS talk contribs →‎LAP Project Considerations
     09:20  Local Agency Program (LAP) diffhist +166 SchaeferS talk contribs →‎Construction Manual index/links for ‘LAP Project Considerations’: added Archeological and Historical Findings as a resource