Related changes

Jump to navigation Jump to search

Enter a page name to see changes on pages linked to or from that page. (To see members of a category, enter Category:Name of category). Changes to pages on your Watchlist are in bold.

Recent changes options Show last 50 | 100 | 250 | 500 changes in last 1 | 3 | 7 | 14 | 30 days
Hide registered users | Hide anonymous users | Hide my edits | Hide bots | Show minor edits
Show new changes starting from 03:52, 28 September 2023
   
Page name:
List of abbreviations:
N
This edit created a new page (also see list of new pages)
m
This is a minor edit
b
This edit was performed by a bot
(±123)
The page size changed by this number of bytes

27 September 2023

     14:06  810 - Permanent Traffic Signs and Supports diffhist +27 Clarkj25 talk contribs
     14:05  820 - Traffic Signals diffhist +27 Clarkj25 talk contribs
     14:04  501 - Plant Produced Hot Mix Asphalt diffhist +27 Clarkj25 talk contribs
     14:01  823 - Water Mains diffhist +28 Clarkj25 talk contribs

26 September 2023

     15:25  102.19 Evaluation of Contractor Performance and Contract Non-Compliance‎‎ 4 changes history +616 [Clarkj25‎ (4×)]
     
15:25 (cur | prev) -16 Clarkj25 talk contribs →‎Contractor Performance Evaluation (CPE)
     
15:24 (cur | prev) +28 Clarkj25 talk contribs →‎Contractor Performance Evaluation (CPE)
     
15:19 (cur | prev) +274 Clarkj25 talk contribs →‎Contractor Performance Evaluation (CPE) and Notice of Non-Compliance with Contract Requirements Transition for MDOT Trunkline Projects
     
15:17 (cur | prev) +330 Clarkj25 talk contribs →‎Contractor Performance Evaluation (CPE) and Notice of Non-Compliance with Contract Requirements Transition for MDOT Trunkline Projects
     15:22  102.01 Prequalification of Bidders diffhist +717 Clarkj25 talk contribs →‎Contractor Performance Evaluation (CPE) and 1165 Form for Non-Compliance Transition

21 September 2023

     17:22  E-Construction diffhist +312 Clarkj25 talk contribs →‎e-Construction/Paper File System
     14:59  109.07 Final Inspection, Acceptance, and Final Payment‎‎ 2 changes history -19 [Clarkj25‎ (2×)]
     
14:59 (cur | prev) -1 Clarkj25 talk contribs →‎Local Agencies (Staff Project Engineer or Consultant Engineer)
     
14:58 (cur | prev) -18 Clarkj25 talk contribs →‎Construction Progress Pay Estimate Approval Process
     12:55  823 - Water Mains‎‎ 16 changes history +17,984 [Clarkj25‎ (16×)]
     
12:55 (cur | prev) +150 Clarkj25 talk contribs →‎INSPECTION & TESTING
     
12:53 (cur | prev) +199 Clarkj25 talk contribs →‎MATERIALS
     
12:49 (cur | prev) +47 Clarkj25 talk contribs
     
12:39 (cur | prev) -2 Clarkj25 talk contribs →‎INSPECTION & TESTING
     
12:37 (cur | prev) -15 Clarkj25 talk contribs →‎INSPECTION & TESTING
     
12:32 (cur | prev) -2 Clarkj25 talk contribs →‎INSPECTION & TESTING
     
12:31 (cur | prev) -3 Clarkj25 talk contribs →‎INSPECTION & TESTING
     
12:30 (cur | prev) -9 Clarkj25 talk contribs →‎INSPECTION & TESTING
     
12:26 (cur | prev) +21 Clarkj25 talk contribs →‎INSPECTION & TESTING
     
12:23 (cur | prev) +6,743 Clarkj25 talk contribs →‎CONSTRUCTION
     
12:20 (cur | prev) +1,776 Clarkj25 talk contribs →‎MEASUREMENT AND PAYMENT
     
12:17 (cur | prev) +3,142 Clarkj25 talk contribs →‎CONSTRUCTION
     
12:14 (cur | prev) +707 Clarkj25 talk contribs →‎CONSTRUCTION
     
12:11 (cur | prev) +134 Clarkj25 talk contribs →‎MATERIALS
     
12:08 (cur | prev) +4,722 Clarkj25 talk contribs →‎MATERIALS
     
12:06 (cur | prev) +374 Clarkj25 talk contribs →‎GENERAL
     12:02  501 - Plant Produced Hot Mix Asphalt diffhist +2 Clarkj25 talk contribs →‎Old HMA Pavement

20 September 2023

     15:30  E-Signature‎‎ 5 changes history +712 [Clarkj25‎ (5×)]
     
15:30 (cur | prev) -1 Clarkj25 talk contribs →‎Transition to OneSpan
     
15:07 (cur | prev) +1 Clarkj25 talk contribs →‎Tranistion to OneSpan – Frequently Asked Signature Questions
     
15:07 (cur | prev) +70 Clarkj25 talk contribs →‎Tranistion to OneSpan – Frequently Asked Signature Questions
     
15:03 (cur | prev) +1 Clarkj25 talk contribs →‎Transition to OneSpan
     
15:03 (cur | prev) +641 Clarkj25 talk contribs →‎Transition to OneSpan

19 September 2023

     07:32  105.10 Buy America Source of Steel and Iron‎‎ 2 changes history -207 [Clarkj25‎ (2×)]
     
07:32 (cur | prev) -9 Clarkj25 talk contribs
     
07:32 (cur | prev) -198 Clarkj25 talk contribs

14 September 2023

     11:18  Preconstruction Meeting diffhist +8 Clarkj25 talk contribs

13 September 2023

     14:46  E-Signature‎‎ 4 changes history -243 [Clarkj25‎ (4×)]
     
14:46 (cur | prev) -452 Clarkj25 talk contribs
     
12:35 (cur | prev) -246 Clarkj25 talk contribs →‎Transition to OneSpan
     
12:35 (cur | prev) +1 Clarkj25 talk contribs →‎Transition to OneSpan
     
12:35 (cur | prev) +454 Clarkj25 talk contribs →‎Transition to OneSpan
     11:35  501 - Plant Produced Hot Mix Asphalt‎‎ 4 changes history -141 [Clarkj25‎ (4×)]
     
11:35 (cur | prev) +25 Clarkj25 talk contribs
     
11:15 (cur | prev) +4 Clarkj25 talk contribs →‎Mix Designs & Job Mix Formulas
     
11:11 (cur | prev) +5 Clarkj25 talk contribs →‎Mix Designs & Job Mix Formulas
     
11:09 (cur | prev) -175 Clarkj25 talk contribs →‎Mix Designs & Job Mix Formulas
     10:08  208 - Soil Erosion and Sedimentation Control (NPDES) diffhist +1 Clarkj25 talk contribs
     10:07  204 - Removing Miscellaneous Structures and Materials diffhist +1 Clarkj25 talk contribs

11 September 2023

     09:00  105.10 Buy America Source of Steel and Iron diffhist -2,623 SchaeferS talk contribs Removed four paragraphs per Jason Gutting.

7 September 2023

     16:09  501 - Plant Produced Hot Mix Asphalt‎‎ 8 changes history +487 [Clarkj25‎ (8×)]
     
16:09 (cur | prev) +88 Clarkj25 talk contribs →‎Mix Designs & Job Mix Formulas
     
16:08 (cur | prev) +89 Clarkj25 talk contribs →‎Mix Designs & Job Mix Formulas
     
16:05 (cur | prev) +91 Clarkj25 talk contribs →‎Mix Designs & Job Mix Formulas
     
16:01 (cur | prev) +164 Clarkj25 talk contribs →‎MATERIALS
     
15:54 (cur | prev) -55 Clarkj25 talk contribs →‎Note
     
15:53 (cur | prev) 0 Clarkj25 talk contribs →‎MIX DESIGNS & JOB MIX FORMULAS
     
15:52 (cur | prev) +74 Clarkj25 talk contribs →‎MATERIALS
     
15:48 (cur | prev) +36 Clarkj25 talk contribs →‎Note

6 September 2023

     16:10  501 - Plant Produced Hot Mix Asphalt‎‎ 6 changes history +1,410 [Clarkj25‎ (6×)]
     
16:10 (cur | prev) +48 Clarkj25 talk contribs →‎ROLLERS
     
16:08 (cur | prev) 0 Clarkj25 talk contribs →‎Rollers
     
16:03 (cur | prev) 0 Clarkj25 talk contribs →‎Material Transfer Machines
     
15:59 (cur | prev) -4 Clarkj25 talk contribs →‎Bond Coat Applicator / Pressure Distributor
     
15:56 (cur | prev) +898 Clarkj25 talk contribs →‎Pressure Distributor
     
15:30 (cur | prev) +468 Clarkj25 talk contribs →‎EQUIPMENT

5 September 2023

     14:59  501 - Plant Produced Hot Mix Asphalt‎‎ 10 changes history +299 [Clarkj25‎ (10×)]
     
14:59 (cur | prev) 0 Clarkj25 talk contribs
     
14:54 (cur | prev) +91 Clarkj25 talk contribs →‎MEASUREMENT, DOCUMENTATION & PAYMENT
     
14:52 (cur | prev) +26 Clarkj25 talk contribs →‎MEASUREMENT AND PAYMENT
     
14:51 (cur | prev) +53 Clarkj25 talk contribs →‎CONSTRUCTION
     
14:46 (cur | prev) +24 Clarkj25 talk contribs
     
14:44 (cur | prev) +4 Clarkj25 talk contribs
     
14:41 (cur | prev) +16 Clarkj25 talk contribs
     
14:37 (cur | prev) +44 Clarkj25 talk contribs
     
14:31 (cur | prev) +8 Clarkj25 talk contribs →‎EQUIPMENT
     
14:28 (cur | prev) +33 Clarkj25 talk contribs →‎CONSTRUCTION

30 August 2023

     15:24  811 - Permanent Pavement Markings diffhist +123 Clarkj25 talk contribs →‎MEASUREMENT AND PAYMENT
     14:08  820 - Traffic Signals‎‎ 3 changes history -78 [Clarkj25‎ (3×)]
     
14:08 (cur | prev) +88 Clarkj25 talk contribs →‎Acceptance of Traffic Signal Work
     
12:20 (cur | prev) +75 Clarkj25 talk contribs →‎MEASUREMENT AND PAYMENT
     
12:18 (cur | prev) -241 Clarkj25 talk contribs →‎MEASUREMENT AND PAYMENT
     12:16  819 - Electrical and Lighting diffhist -480 Clarkj25 talk contribs →‎Electrical and Lighting Conduit
     11:43  810 - Permanent Traffic Signs and Supports‎‎ 13 changes history +1,022 [Clarkj25‎ (13×)]
     
11:43 (cur | prev) +11 Clarkj25 talk contribs →‎Inspection Issue Examples
     
11:40 (cur | prev) +1 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
11:39 (cur | prev) -5 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
11:39 (cur | prev) +4 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
11:36 (cur | prev) -3 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
11:35 (cur | prev) +306 Clarkj25 talk contribs →‎EQUIPMENT
     
11:32 (cur | prev) +142 Clarkj25 talk contribs →‎EQUIPMENT
     
11:29 (cur | prev) +201 Clarkj25 talk contribs →‎EQUIPMENT
     
11:25 (cur | prev) +176 Clarkj25 talk contribs →‎EQUIPMENT
     
11:18 (cur | prev) -1 Clarkj25 talk contribs →‎EQUIPMENT
     
11:18 (cur | prev) +193 Clarkj25 talk contribs
     
08:15 (cur | prev) -6 Clarkj25 talk contribs →‎EQUIPMENT
     
08:00 (cur | prev) +3 Clarkj25 talk contribs →‎SUBMITTALS

29 August 2023

     18:16  810 - Permanent Traffic Signs and Supports‎‎ 21 changes history +17,213 [Clarkj25‎ (21×)]
     
18:16 (cur | prev) +1,042 Clarkj25 talk contribs →‎Inspection Issue Examples
     
17:58 (cur | prev) +557 Clarkj25 talk contribs →‎Inspection Issue Examples
     
17:55 (cur | prev) +318 Clarkj25 talk contribs →‎Inspection Issue Examples
     
17:52 (cur | prev) +35 Clarkj25 talk contribs →‎Inspection Issue Examples
     
17:47 (cur | prev) +97 Clarkj25 talk contribs →‎INSPECTION & TESTING
     
17:35 (cur | prev) +92 Clarkj25 talk contribs
     
17:33 (cur | prev) -11 Clarkj25 talk contribs →‎INSPECTION & TESTING
     
17:27 (cur | prev) +7,955 Clarkj25 talk contribs
     
17:20 (cur | prev) -9 Clarkj25 talk contribs →‎SHOPDRAWINGS
     
17:20 (cur | prev) +47 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
17:19 (cur | prev) -28 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
17:18 (cur | prev) +60 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
17:16 (cur | prev) +5 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
17:15 (cur | prev) -7 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
17:15 (cur | prev) +10 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
17:14 (cur | prev) -10 Clarkj25 talk contribs →‎PRECONSTRUCTION
     
17:12 (cur | prev) -1 Clarkj25 talk contribs →‎Insurance Requirements:
     
17:12 (cur | prev) +3,347 Clarkj25 talk contribs
     
17:01 (cur | prev) -36 Clarkj25 talk contribs →‎EQUIPMENT
     
16:59 (cur | prev) +9 Clarkj25 talk contribs →‎EQUIPMENT
     
16:58 (cur | prev) +3,741 Clarkj25 talk contribs
     13:59  501 - Plant Produced Hot Mix Asphalt‎‎ 4 changes history +3 [Clarkj25‎ (4×)]
     
13:59 (cur | prev) +1 Clarkj25 talk contribs
     
13:59 (cur | prev) +1 Clarkj25 talk contribs
     
13:55 (cur | prev) 0 Clarkj25 talk contribs
     
13:55 (cur | prev) +1 Clarkj25 talk contribs