Search results

Jump to navigation Jump to search
Results 1 – 17 of 17
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
  
  
  

Page title matches

  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...dinated with the Standard Specifications for Construction, Divisions 6 and 7 of the Construction Manual, Special Provision 12SP604B QUALITY CONTROL AND
    33 KB (4,932 words) - 16:38, 12 May 2021

Page text matches

  • ...July 2022.jpg|thumb|center|700px|link=//{{SERVERNAME}}/images_construction/7/7c/DRB_Flowchart_July_2022.pdf|DRB Process Flowchart]] [[Category:Division 1]]
    2 KB (249 words) - 15:56, 11 July 2022
  • ...e project, the local agency is required to notify the DR in writing within 7 days of the change. Information regarding certification/license requiremen [[Category:Division 1]]
    2 KB (320 words) - 11:18, 14 September 2023
  • <center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    28 KB (3,726 words) - 16:02, 8 March 2023
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    67 KB (8,623 words) - 17:18, 11 April 2024
  • ...structure mixtures in accordance with Table 701-1A and Table 701-1B. Use supplemental cementitious materials as specified in the contract. 7.0
    12 KB (1,593 words) - 13:11, 26 July 2022
  • ...ject to Bid through MDOT] located at [https://www.michigan.gov/mdot/0,4616,7-151-9625_25885---,00.html www.michigan.gov/mdotlap]. :7. Public and Private Utilities^^
    7 KB (1,055 words) - 11:29, 14 July 2020
  • Additional documentation, narratives, and supplemental files may be necessary to comply with the scheduling specifications and can ...indicate approval If no response is provided back to the Contractor within 7 calendar days, then the schedule will be considered approved.
    8 KB (1,206 words) - 14:27, 29 February 2024
  • <center><span STYLE="font: 40pt arial;">'''Division 7 Supplemental Information'''</span></center> ...dinated with the Standard Specifications for Construction, Divisions 6 and 7 of the Construction Manual, Special Provision 12SP604B QUALITY CONTROL AND
    33 KB (4,932 words) - 16:38, 12 May 2021
  • ...webpage], MDOT's ProjectWise resource [http://www.michigan.gov/mdot/0,4616,7-151-9625_21540_36037-321341--,00.html webpage], or other links provided wit ...for the purpose of records retention) is the date the Financial Operations Division (FOD) does the final billing to FHWA for federal funds. In addition to the
    12 KB (1,824 words) - 16:49, 18 April 2024
  • The Office of Business Development (OBD) has developed a supplemental guide to assist construction staff in the monitoring of CUF activitie ...dot/0,4616,7-151-9625_23109---,00.html http://www.michigan.gov/mdot/0,4616,7-151-9625_23109---,00.html]
    27 KB (4,137 words) - 14:31, 17 April 2024
  • ::* Supplemental unemployment benefit programs ...the contractor’s breakdown, contact the Construction Field Services (CFS) Division’s Prevailing Wage Compliance Specialist.
    63 KB (9,521 words) - 14:09, 1 April 2024
  • ...placing a concrete mixture of portland cement, blended portland cement, supplemental cementitious materials, fine aggregate, coarse aggregate, water, and admi <div id="601.03.B.7"></div>
    36 KB (5,127 words) - 13:21, 26 July 2022
  • ...s/construction/index.php/E-Construction#e-Construction.2FPaper_File_System Division 1 e-construction tables]. The element sequence and general format are as ...Payrolls ||Certified Payrolls 401||(Stored in LCP Tracker)||Wage and Hour Division (WHD)||[http://www.dol.gov/whd/forms/wh347instr.htm WH-347]||WH347 YYYY-MM-
    57 KB (6,844 words) - 17:23, 18 April 2024
  • ...rease the service of the bridge. The [http://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367-243045--,00.html MDOT Project Scoping Manual] offers e ...ith the LMC; however the special provision for Bridge Deck Surface Repair (7 sack) mix or Grade D may be substituted for the LMC with the Engineer’s a
    84 KB (13,299 words) - 11:46, 19 January 2022
  • <div align="right">23.7</div> # List type of supplemental forms used to document the following:
    30 KB (4,172 words) - 17:23, 3 January 2024
  • <center>7</center> ...turer per project in accordance with [https://www.michigan.gov/mdot/0,4616,7-151-9622_11044_11367-207980--,00.html Section 4.07 of the Materials Quality
    53 KB (8,517 words) - 17:07, 10 April 2024