Search results

Jump to navigation Jump to search

Page title matches

  • <center><span STYLE="font: 20pt arial;">Section 105</span></center> [[Category:Section 105]]
    14 members (1 subcategory, 0 files) - 17:08, 19 September 2023

Page text matches

  • <center><span STYLE="font: 20pt arial;">Section 105</span></center> [[Category:Section 105]]
    14 members (1 subcategory, 0 files) - 17:08, 19 September 2023
  • <categorytree mode=pages>Section 101</categorytree> <categorytree mode=pages>Section 102</categorytree>
    583 bytes (56 words) - 11:18, 17 May 2017
  • [[category:Section 105]]
    154 bytes (20 words) - 09:50, 14 April 2017
  • [[category:Section 105]]
    154 bytes (20 words) - 09:52, 14 April 2017
  • [[category:Section 105]]
    154 bytes (20 words) - 09:54, 14 April 2017
  • [[category:Section 105]]
    154 bytes (20 words) - 10:00, 14 April 2017
  • [[category:Section 105]]
    154 bytes (20 words) - 10:05, 14 April 2017
  • [[category:Section 105]]
    154 bytes (20 words) - 09:44, 14 April 2017
  • [[category:Section 105]]
    154 bytes (20 words) - 09:48, 14 April 2017
  • ...r;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/105.07_Handling_and_Transporting_Materials Email this Page]</div> ...the information or action of the receiving Engineer. Refer to '''''Figure 105-1'''''.
    1 KB (163 words) - 17:32, 12 January 2022
  • The Bureau of Bridges and Structures Construction Section maintains the MDOT Structural Fabrication Quality Manual (SFQM) on this [ht [[Category:Section 105]]
    1 KB (141 words) - 15:24, 11 January 2024
  • [[Category:Section 105]]
    1 KB (181 words) - 17:52, 22 January 2024
  • ...r;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/105.01_Quality_and_Scope_of_Supply Email this Page]</div> ...cifications-Construction.pdf 2020-Standard Specifications for Construction Section 902.06] prohibiting use of crushed concrete within 100' of any water course
    5 KB (767 words) - 14:44, 21 September 2023
  • [[Category:Section 105]]
    4 KB (611 words) - 16:09, 25 May 2022
  • !Updated!! Division !! Section !! Summary !! What Changed ..._Guardrail, Guardrail Terminals, and MiscellaneousPosts]</center>||Updated Section 807 to reflect new guidance on lapping guardrail for temporary traffic shif
    67 KB (8,623 words) - 17:18, 11 April 2024
  • ...r;">[mailto:Change?body=http://mdotwiki.state.mi.us/construction/index.php/105.10_Source_of_Steel_and_Iron Email this Page]</div> ...1c7c17c7d1d24cd0d2&mc=true&node=pt23.1.635&rgn=div5#se23.1.635_1410 23 CFR Section 635.410] which state that all steel and iron materials/products and manufac
    14 KB (2,171 words) - 07:32, 19 September 2023
  • The bulb-T beam shape can be a more effective section due to its larger bottom flange that allows more prestressing strands to be ...tural Fabrication Unit has developed, with the assistance of the Materials Section, repair procedures to assist with evaluating fabricator proposed concrete r
    27 KB (4,105 words) - 11:45, 19 January 2022
  • ...ior approval should be placed in the Contractor Claims and Force Account – 105 folder. Any contract revision that will be paid for using the force account ...>For all contract modifications bound for a Tier III approval process this section must include a short executive summary of project changes. This summary ca
    50 KB (7,380 words) - 16:11, 1 April 2024
  • <center>105</center> ...ntractor must provide an MSL to the engineer in accordance with subsection 105.01 of the 2020 Standard Specifications for Construction. The MSL may be sub
    56 KB (7,443 words) - 17:48, 9 October 2023
  • ...ave “Fabrication Inspection” as the basis of acceptance in accordance with section [http://www.michigan.gov/documents/mdot/MDOT_MQAP_Manual_5_Section_D_307110 ...age or does not meet specification requirements in accordance with section 105 of the MDOT Standard Specifications for Construction. The Engineer must not
    45 KB (7,017 words) - 13:22, 26 July 2022

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)