Search results

Jump to navigation Jump to search
  • [[Category: Division 8]]
    655 bytes (74 words) - 12:46, 19 January 2022
  • [[Category: Division 8]]
    622 bytes (70 words) - 12:47, 19 January 2022
  • [[Category: Division 8]]
    607 bytes (69 words) - 11:50, 19 January 2022
  • [[Category: Division 8]]
    623 bytes (70 words) - 12:43, 19 January 2022
  • [[Category: Division 8]]
    606 bytes (68 words) - 12:46, 19 January 2022
  • ...ll be assigned to MDOT. Refer to [[819 - Electrical and Lighting|Division 8]] of this manual for further information on electrical requirements on pump [[Category:Division 4]]
    1 KB (201 words) - 17:47, 12 January 2022
  • [[Category: Division 8]]
    603 bytes (67 words) - 12:45, 19 January 2022
  • [[Category: Division 8]]
    598 bytes (67 words) - 12:47, 19 January 2022
  • ...flat as possible. Obstructions on either side of the first 25 to 30 feet (8 to 10 m) of the drive should be removed whenever possible. ...ed of reinforced or nonreinforced concrete. [[601 - PCC Pavement Mixtures|Division 6]] of this manual should be referenced for concrete construction. Thickne
    5 KB (706 words) - 11:49, 19 January 2022
  • [[Category: Division 8]]
    2 KB (209 words) - 12:46, 19 January 2022
  • [[Category: Division 8]]
    1 KB (177 words) - 12:47, 19 January 2022
  • <b>Chapter 8 (Nonconformance Process):</b> New chapter for existing SFU NCR Process that [[Category:Division 1]]
    2 KB (305 words) - 15:51, 19 January 2022
  • [[Category: Division 8]]
    2 KB (293 words) - 12:42, 19 January 2022
  • See [[501 - HMA Mixtures|Division 5, HMA]] and [[601 - PCC Pavement Mixtures|Division 6, Concrete]] for general materials requirements. Review the plans and [ht [[Category: Division 8]]
    4 KB (545 words) - 12:41, 19 January 2022
  • <center>8</center> [[Category: Division 8]]
    6 KB (783 words) - 12:45, 19 January 2022
  • Natural stone or broken concrete - least dimension must be 8 inches (1200 mm). Plain precast must be 6 inches (150 mm) thick and 15 squ [[Category: Division 8]]
    4 KB (644 words) - 12:44, 19 January 2022
  • ...should be reported. Timber is not required to be cut in lengths less than 8 feet (2.4 m). Any discussion with adjacent property owners should be repor ...learing width is 8 feet (2.5 m) entirely within the ROW. Widths less than 8 feet (2.5 m) are to be used where possible. Trees, brush, shrubs, stumps a
    7 KB (1,092 words) - 17:43, 12 January 2022
  • [[Category: Division 8]]
    3 KB (428 words) - 12:44, 19 January 2022
  • An approved sign cover detail for [//{{SERVERNAME}}/images_construction/8/8d/SignCover_Type_1.pdf Type 1 Signs] is pictured below. Examples of best p ...ignCover Type 1.jpg|center|600px|link=//{{SERVERNAME}}/images_construction/8/8d/SignCover_Type_1.pdf]]
    7 KB (987 words) - 12:44, 19 January 2022
  • The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Production Manual. A brief descripti * Point 8 was reworded as follows: “If the sample weight exceeds 2000 grams, it sh
    4 KB (560 words) - 15:14, 19 June 2017

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)