Search results

Jump to navigation Jump to search
  • 6:00 am, Tuesday, 05/27/14</center> 6:00 am, Monday, 07/07/14</center>
    5 KB (632 words) - 15:03, 19 June 2017
  • ...nforced or nonreinforced concrete. [[601 - PCC Pavement Mixtures|Division 6]] of this manual should be referenced for concrete construction. Thickness <center>6 inches (150 mm)</center>
    5 KB (725 words) - 17:13, 12 May 2021
  • ...HMA Mixtures|Division 5, HMA]] and [[601 - PCC Pavement Mixtures|Division 6, Concrete]] for general materials requirements. Review the plans and [http ...foot (3 m) straightedge. Variation of more than 1/4 inch in 10 feet (6 mm in 3 m) must be remedied.
    4 KB (565 words) - 17:15, 12 May 2021
  • Effective with the February 6, 2015, letting and beyond, a special provision will be placed in all projec [[Category: Division 8]]
    2 KB (229 words) - 17:19, 12 May 2021
  • ...6 inches (150 mm) should be done in stages. The initial stage is crushing 6 inches (150 mm) of HMA pavement. Subsequent stages include windrowing the [[Category:Division 3]]
    4 KB (574 words) - 16:02, 6 May 2021
  • The Construction Field Services (CFS) Division has revised the Hot Mix Asphalt (HMA) Production Manual. A brief descripti ...7000g of mixture at optimum”; plus some rearranging of information. (Page 6)
    4 KB (560 words) - 15:14, 19 June 2017
  • <b>Chapter 6 (Buy America Guidance):</b> New chapter for existing SFU BA Guidance that w [[Category:Division 1]]
    2 KB (325 words) - 07:05, 3 August 2021
  • :6. Contractors must retain the original signed subcontract, including all req ...s/GetDocument.htm?fileName=2653.pdf Form 2653]) to MDOT, Contract Services Division (CSD), for review and approval as part of the award process.
    7 KB (1,019 words) - 11:18, 16 June 2021
  • ...is finished with a wood float and all edges are finished with a 1/4 inch (6 mm) radius. Curing compound is applied at a rate of 1 gallon per 25 square ...crete - least dimension must be 8 inches (1200 mm). Plain precast must be 6 inches (150 mm) thick and 15 square feet (1.5&nbsp;m2) surface area.
    4 KB (663 words) - 17:17, 12 May 2021
  • ...the moisture content is more than 6 percent. The excess weight more than 6 percent will be deducted from the pay weight. The determination of moistur [[Category:Division 3]]
    5 KB (769 words) - 16:02, 6 May 2021
  • <center>6</center> [[Category: Division 8]]
    3 KB (447 words) - 17:17, 12 May 2021
  • ...gh the Construction Operations Engineer in the Construction Field Services Division. The VEDT membership will consist of the following individuals (or their d :e. Administrator of the Development Services Division (if a local agency project)
    10 KB (1,462 words) - 13:53, 10 June 2021
  • * Depth - Taken after final trimming to the nearest 1/4 inch (6 mm), at a minimum of 400 linear feet (120 m) of traffic lane width or two l ...the scale weight of the aggregate unless the moisture content is more than 6 percent. Moisture tests will be made at the start of weighing operations a
    6 KB (886 words) - 16:01, 6 May 2021
  • ...rubblizing making sure there is not excessive oversize material [less than 6 inches (150 mm) is the greatest dimension]. The oversize material will hav [[Category:Division 3]]
    4 KB (552 words) - 16:01, 6 May 2021
  • ...Precast concrete footings must be supported by placing them on a compacted 6 inch (150 mm) subbase of Granular Material Class II. ...r Case 2)''' applies when the elevation of the cover is changed up or down 6 inches (150 mm) or less. The cover should be adjusted to the required elev
    7 KB (1,018 words) - 16:04, 6 May 2021
  • <center><span STYLE="font: 15pt arial;">''Construction Field Services Division''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    48 KB (6,008 words) - 13:11, 16 September 2021
  • ...allotted contract time. The Contractor claims that part of this is due to 6 days of bad weather that the Engineer has documented. The other 24 days ar :::(6.0 - 4.5) X 2.0 = 3.0 days
    9 KB (1,278 words) - 12:48, 30 July 2020
  • 0 – 6 6.5
    12 KB (1,594 words) - 15:56, 26 July 2013
  • <center><span STYLE="font: 15pt arial;">'''Construction Field Services Division '''</span></center> !Updated!! Division !! Section !! Summary !! What Changed
    28 KB (3,729 words) - 12:17, 23 April 2019
  • ...the membrane may be patched with additional membrane material overlapping 6 inches either side of the area to be patched. ...the shotcrete should be avoided. The nozzleman must keep the nozzle 2 to 6 feet away from the surface and as near as perpendicular to the surface as p
    9 KB (1,281 words) - 16:34, 12 May 2021

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)